Project Mechanical Ventilation and Air Conditioning system of Block 7 DHQC & Akuregoda

Project Consultant Central Engineering Consultancy Bureau


Client Ministry of Defence and Urban Development
Contractor AIP - MARL joint Venture
Pump Identification Makeup Water tank head Calculation -Block No-7
Design By Design Engineer, AIP - MARL joint Venture
Section Water Qty Pipe size Length Fittings Qty Equivalent length Total equivalent length Friction loss Friction head
Fittings
REF L/S GPM MM M NOS M M M/100M M
1.638 25.9623 75 2.368 2.368 2.368 0.3 0.01
1.638 25.9623 75 90 Bends 2 2.29 4.58 0.3 0.01
A-B
1.638 25.9623 75 Ball cock valve 1 0.97 0.97 0.3 0.00
1.638 25.9623 75 Tees 1 1.52 1.52 0.3 0.00
3.276 51.9246 75 6.401 1 6.40 6.40 1.2 0.08
3.276 51.9246 75 Tees 1 1.52 1.52 1.2 0.02
B-C 3.276 51.9246 75 90 Bends 3 2.29 6.87 1.2 0.08
3.276 51.9246 75 28.33 Reduser 1 1.15 1.15 1.2 0.01
3.276 51.9246 75 Redusing tee 1 2.13 1.15 1.2 0.01
1.638 25.9623 50 17.267 17.27 17.27 2.3 0.40
1.638 25.9623 50 90 Bends 2 1.52 3.05 2.3 0.07
C-D
1.638 25.9623 50 Tees 3 1.00 3.00 2.3 0.07
1.638 25.9623 50 Redusing tee 1 1.43 1.43 2.3 0.03
0.546 8.6541 40 0.62 0.62 0.62 0.9 0.01
D-E 0.546 8.6541 40 90 Bends 2 1.22 2.44 0.9 0.02
0.546 8.6541 40 Butterfly valve 1 0.54 0.54 0.9 0.00
Head in m 0.84
Head with 10% safety Factor 0.92
Project Mechanical Ventilation and Air Conditioning system of Block 7 DHQC & Akuregoda
Project Consultant Central Engineering Consultancy Bureau
Client Ministry of Defence and Urban Development
Contractor AIP - MARL joint Venture
Pump Identification Makeup Water tank head Calculation -Block No-7
Design By Design Engineer, AIP - MARL joint Venture
Section Water Qty Pipe size Length Fittings Qty Equivalent length Total equivalent length Friction loss Friction head
Fittings Rema
REF L/S GPM MM M NOS M M M/100M M
1.638 25.9623 75 2.368 2.368 2.368 0.3 0.01
1.638 25.9623 75 90 Bends 2 2.29 4.58 0.3 0.01
A-B
1.638 25.9623 75 Ball cock valve 1 0.97 0.97 0.3 0.00
1.638 25.9623 75 Tees 1 1.52 1.52 0.3 0.00
3.276 51.9246 75 6.401 1 6.40 6.40 1.2 0.08
3.276 51.9246 75 Tees 1 1.52 1.52 1.2 0.02
B-C 3.276 51.9246 75 90 Bends 3 2.29 6.87 1.2 0.08
3.276 51.9246 75 28.33 Reduser 1 1.15 1.15 1.2 0.01
3.276 51.9246 75 Redusing tee 1 2.13 1.15 1.2 0.01
1.638 25.9623 50 17.267 17.27 17.27 2.3 0.40
1.638 25.9623 50 90 Bends 2 1.52 3.05 2.3 0.07
C-D
1.638 25.9623 50 Tees 3 1.00 3.00 2.3 0.07
1.638 25.9623 50 Redusing tee 1 1.43 1.43 2.3 0.03
0.546 8.6541 40 0.62 0.62 0.62 0.9 0.01
D-E 0.546 8.6541 40 90 Bends 2 1.22 2.44 0.9 0.02
0.546 8.6541 40 Butterfly valve 1 0.54 0.54 0.9 0.00
Head in m 0.84
Head with 10% safety Factor 0.92