1.0 OBJECTIVE
To lay down the procedure for operation and maintenance of low tension panels.
2.0 SCOPE
3.0 RESPONSIBILITY
Operator/Engineer/Executive
4.0 ACCOUNTABILITY
HOD Engineering
5.0 PROCEDURE
5.1 Put OFF the supply where you want to carry out the work.
5.6 Have proper tools like insulated plier, test lamp, tester, wire stipper and fuse puller.
5.9 Before charging the supply, ensure that no tools are left inside the panel.
5.12 Frequency for preventive maintenance of the low tension panel is one in a six month.
5.13.2 Ensure that “TRIP CIRCUIT HEALTHY” indication appears on the panel.
5.13.3 Check incoming voltage between R-Y, Y-B and R-B on the volt meter provided, it
should be 415 to 430 volts wherever applicable.
5.13.4 Charge the closing circuit breaker by the clockwise movement of handle provided on
the breaker.
5.13.5 Repeat the step 5.13.4 until the spring indicator on breaker show charged.
5.13.7 Rotate the TNC switch to close position to close the circuit of the breaker.
5.14.1 Rotate the TNC switch to trip position to open the circuit of the breaker.
5.15.2 Rotate the rotary handle in clockwise direction from OFF to ON position.
5.16.1 Rotate the rotary handle in anticlockwise direction from ON to OFF position.
6.0 ABBREVIATION