Ajinivas
Hariharapuram
Raju Aji Varkala
Thiruvanathapuram
Kerala
India
Phone : +91-470-2666039
E-Mail: rajuaji2008@yahoo.com

“Suitable post inQA/ QC Inspector for welding & piping”


Dear Sir / Madam,

I am working as QA/QC SUPERVISOR for WELDING and PIPING, currently based in NIGERIA,
with around -
 7 years in fabrication industry as a fabrication supervisor, QC inspector in welding piping-at
Nigeria, Abu Dhabi, Dubai, Qatar, India for Oil & Gas, LNG Plants, Desalination, power plants,
shipyard, pipelines, and Refinery

I enclosed herewith my updated Curriculum Vitae for your consideration, which briefly outlined my
7 years of multi-tasking experience to date.

Self Assessment: Am a fast learner with a stomach and passion to excel in whatever I do, adapts well
to new technology / ambience, articulate ideas down the line, strict on deadlines, a go-getter, innate
qualities of dedication, commitment, perseverance, integrity, team leader – lead upfront with excellent
man management skills.
Career Objectives / Ambition: Build a formidable closely knit team that would make the company
proud. Articulate Company’s vision statement down the line. Take up higher / challenging
responsibilities and climb the corporate ladder.
From what has been said above and outlined in the pages that follow, I am confident as much as you
would be that I would most definitely blend well with the line of business and work culture of your
esteemed organization.
Please be assured that you would be looking at the best both in content and quality.

Yours sincerely,

RAJU AJI
Curriculum Vitae (Page 1 of 4) Raju Aji
Personal: Indian Contact details: Address in India:
INDIAN Ajinivas
Date of birth: 23/04/1983 Passport No: E8827009 Hariharapuram
Valid up to 01-02-2014 Varkala
Language: English, Hindi, Tamil Thiruvanathapuram
& Malaya lam Kerala
India
Phone:0091-470-2666039
e-mail: rajuaji2008@yahoo.com

TECHNICAL COURSE&
EDUCATION Diploma in mechanical Engg.

ASNT LEVEL-II in:
1. Radiography Tasting
2. Ultrasonic Tasting
3. Magnetic particle Testing
4. Penetrant Testing
5. Visual Testing
6. Eddy Current Testing

AWS - Certified Welding Inspector (CWI.)


CSWIP – 3.1 Welding Inspector.


API-653 AST Inspector.


API-510 Pressure Vessel Inspector (waiting for certificate)
EXPIREINCE : 7 YEARs
PROFILE:
Duties & Responsibilities in (QA/QC)
 Conducting Welder Performance Qualification tests

 Conducting procedure qualification record


 Carrying out dimension and visual inspection in accordance with drawings and specification
 Checking drawing before erection and finished product as per the schedule
 Maintaining Fit-up progress report
 Maintaining Welding progress report
 Monitoring welder performance (% of Repairs)
 Performing field inspection for ongoing welding and finished elements at site
 Looking after all types of destructive and Non Destructive testing
 Knowledge on Radiography film Interpretation
 QC line check, joint status &NDT attachments
 Coordinating NDT crew
 Preparing weld history, joint type & joint details for GRE Pipe line
 Spool release and spool movement
 Handled materials : CS, LTCS, ALLOYSTEEL, STRAINLESS STEEL, (304l, 316L)NICKEL, INCONEL,
COPPER-NICKAL, DUPLEX,CLAD MATERIALS (CS+316L,LTCS+304L), STRAINLESS
STEELDISSIMILIAR MATERIAL (LTCS+304L,CS+316L)
 Experience in welding process :
GTAW, SMAW,FCAW,GMAW,SAW,FCAW(AUTO WELDING)
 Knowledge about Standards ASME Sec V, Sec VIII, Sec IX, API 1104,
ASME B31.3, B31.4, B31.8, API 510, API 653, API 650 , API 570,
API 598 , API RP577

25.03.2009 to TILL DATE Duties & Responsibilities


• Preparing WPS as per the client requirement.
Company: SAIPEM - NIGERIA • Conducting Procedure qualification test.
• Preparing Quality control procedure and submitted for client
Project: GBARAN PIPELINE approval.
PROJECT • Conducting Welder Performance Qualification tests
• Review and approved Hydro test packs
Client: SHELL
• Witnessing for hydro testing
Position: QA/QC SUPERVISOR • Maintaining Welding progress report

• Monitoring welder performance (% of Repairs)

• Monitoring repair percentage.

• Co-ordination with NDT activities


• QC Documents controlling

Duties & Responsibilities


15.01.2008 to 25.02.2009 • Conducting Welder Performance Qualification tests
• Welding consumable inspection (welding electrodes)
Company: CCIC –ABU DHABI, • Carrying out dimension and visual inspection in accordance with
drawings and specification
Project: 1) Buhassa-Habshan 36”
pipeline Project and • Daily checking fit-ups and Maintaining Fit-up progress report
• Maintaining Welding progress report
2) GASCO LNG Plant shutdown
• Looking after all types of destructive and Non Destructive testing
Client: GASCO
• Radiography film Interpretation
Position: QA/QC INSPECTOR • Witness for hydro test & pneumatic
for WELDING & PIPING
• Released joints for coating after all inspection
• Witness all the golden joint cutting, ndts and welding
• Material inspection (gaskets, bolts, nuts, pipe internal cleaning) for
valves and flanged tie in installation.
• Witness for torquing.
Duties & Responsibilities
• Conducting Welder Performance Qualification tests
• Involved in WPS/PQR and construction procedure preparation
7.7.2007 to 10-01-2008 • Project permanent material inspection

Company : DODSAL Pet Limited • Welding consumable inspection (welding electrodes)


• Carrying out dimension and visual inspection in accordance with
Project : RAS GAS RGX –II
drawings and specification
Client: RAS GAS • Checking drawing before erection and finished product as per the
schedule
Position: QA/QC INSPECTOR
(WELDING and PIPING ) • Daily checking fit-ups and Maintaining Fit-up progress report
• Maintaining Welding progress report
• Monitoring welder performance (% of Repairs)
• Performing field inspection for ongoing welding and finished
elements at site
• Looking after all types of destructive and Non Destructive testing
• Radiography film Interpretation
• Witness for hydro test & pneumatic
• Spool release shop to painting after all inspection

Duties & Responsibilities


25.07.06 to05.07.07

Company: FERRO FABS • Preparation of WPS / PQR and procedures


construction limited, India • Material inspection, electrode storage and weld consumable
verification
Project : ENNORE THERMAL POWER • Maintain welding database- input daily welding reports to system
PLANT – Unit – 1 & 2 Erection • Preparing new test pack as per SKODA procedure
• Revising drawing for test packs
Client: SKODA EXPORT. • Mechanical line check
• Maintaining Fit-up progress report
Position: QC INSPECTOR
• Welder Performance Qualification tests
• Field welding inspection
(PIPING&WELDING)
• NDT Coordination
• Maintaining Repair Register
• Coating Clearance /lowering clearance
• Welder percentages charts
• Compilation of hydrostatic packs
Assisting QA/QC Manager/ Sr. Engineer For the following

• Spool release shop to painting after all inspection.


• Project permanent material inspection (with client).
• Preparation, revision and follow-up for approval of project procedures
and ITP’s.
• Vendor QCP.
• ITP evaluation and approval.
• Finalizing and follow-up with procurement for vendor final
documentation package.
• Quality internal auditing.
• Co-ordination and follow-up for PQT and qualification.

14.05.2005 to 01.06.06 Duties & Responsibilities


Company : DUBAI DRY DOCKS • Field welding inspection
• NDT Coordination
Project : SAIPAM – FPSO VICTORIA • Preparation of inspection report
• Maintain welding database- input daily welding reports to system
Position : WELDING INSPECTOR • Mechanical line check preparing punch with piping foreman
• QC document control- Maintain procedure & Method statements
document No:
• All activities in QA/QC
Duties & Responsibilities
21.04.2004 to 13.03.2005 • Conducting Welder Performance Qualification tests
• Involved in WPS/PQR and construction procedure preparation
Company : MICRO SPEARS
• Daily checking fit-ups and Maintaining Fit-up progress report
CONSTRUSION LIMITED, INDIA
• NDT Coordination
Project : ENNORE THERMAL POWER • Maintaining Repair Register
PLANT – Unit – 5 ,CHENNAI,INDIA • Coating Clearance /lowering clearance
• Carrying out dimension and visual inspection in accordance with
Position : WELDING INSPECTOR drawings and specification
• Calibration of welding machines

Duties & Responsibilities


17.11.2002 to 19.04.2004

Company : TECH NOVA


CONSTRUCTION LIMITED, INDIA • Supervisor of on shop fabrication, planning, procurement of
materials
Project : CPCL, CHENNAI, INDIA • Drawing out production plans for verification.
• Material inspection and weld consumable verification.
Position : FABRICATION SUPERVISOR • Storage and handling of welding consumables.
• Fabrication, painting and erection of steel structural.
• Coordination with external agencies for NDT

You might also like