PROJECT: PROPOSED COMMERCIAL BUILDING

OWNER:
SUBJ: PROJECT COST ESTIMATE
DATE: 8-Jul-2019
PREPARED:

ITEM NO. DESCRIPTION UNIT QTY UNIT COST AMOUNT


DIV 0 GENERAL REQUIREMENTS
0.10 Mobilization/Demobilization L.S. 1.00 0.00
0.20 Permit and Licenses L.S. 1.00 0.00
SUB-TOTAL 0.00

DIV 2 CONCRETING WORKS


2.10 FOUNDATION
LEAN CONCRETE (CLASS "C")
2.1.1 Plane Concrete m³ 0.00
FOOTING (CLASS "A")
2.1.2 Reinforced Concrete m³ 0.00
2.1.3 16mmø DSB x 6.00m tons 0.00
2.1.4 25mmø DSB x 6.01m tons
2.1.5 20mmø DSB x 6.02m tons
2.1.6 #16 Tie Wire Kg 0.00
SUB-TOTAL 0.00