Perhitungan Kebutuhan Make up Water pada Boiler

Make up = feed boiler - condensate return

Perhitungan Kebutuhan Bahan Bakar pada Boiler

Energi steam yang dihasilkan (kJ/jam)


Heater 2 (E-102) 8420.44
Heater 3 (E-103) 507100.31
Total kalor steam 515520.75
T (oC)
Heater 2 (E-102) 100
Heater 3 (E-103) 165
Total steam yang digunakan

Wsteam (setelah ditambahkan safety factor 20%) =

Loss condensate = 1616.87628


Condensate return = 3772.71132

Feed boiler = 3772.71132


Blowdown = 0.05

Total steam yang dibutuhkan = feed boiler - (5% x feed boiler)


5389.5876 =
Feed boiler =

Make up = feed boiler - condensate return


Make up = 1900.53878526

Efisiensi boiler = 80%


0.8
Kalor yang dibutuhkan= 644400.9375 kJ/jam

Net heating value = 16779 Btu/lb


39027.954 kJ/kg
Massa bahan bakar = 16.511266194 kg/jam
132090.129551757 kg/tahun
132.0901295518 ton/tahun

Densitas solar = 50.5664 lb/ft3


Dipilih, 809.9978784 kg/m3

Massa bahan bakar (dlm m3) = 0.0203843326 m3/jam


20.3843326437 L/jam
163074.661149331 L/tahun

Harga solar = Rp,- 9600/L


1565516747.03357

1.565.516.747 ????

T (oC) T (oF) P (bar)


100 212 1
165 329 7
Laju
P (bar) ρ (kg/m3)
kg/jam m3/jam
1 0.5903 67.21 113.857360664
7 3.666 4424.113 1206.79569013
eam yang digunakan 4491.323 1320.65305079

actor 20%) = 5389.5876 k/jam

kg/jam
kg/jam

+ make up
x feed boiler

feed boiler - (5% x feed boiler)


95% x feed boiler
5673.2501052632 kg/jam

condensate return
kg/jam

(engineeringtoolbox.com)
(menggunakan diesel/solar
dari Pertamina RU IV Cilacap)

(@15°C)

(PERTAMINA)

Harga solar pertamina di berbagai provinsi: (5 Januari 2019)


https://www.pertamina.com/id/news-room/announcement/daftar-harga-bb

P (psia) λ
14.5038
101.526
5 Januari 2019)
announcement/daftar-harga-bbk-tmt-5-januari-2019

You might also like