2.04 Bruckner
2.04 Bruckner
Michael Bruckner, Andrew Henderson, Drew Rak, Emma Williams, Kelly Scanlon (OSD)
In support of the Office of the Secretary of Defense (OSD)
Acknowledgments: Jack Benfer and Ruben Prado (FRCSE)
I. Description of need/problem
IV. Inventory
V. Results - Cost
VII. Sensitivity
Step 3
Step 1 Step 2 Step 5
Estimate life cycle
Define the Develop a impacts Synthesize
scope life cycle results and
inventory Step 4 iterate
(LCI)
Estimate life cycle
costs (LCC)
Industrial
Process
Process Waste- Wastewater
water Plating Line
Electricity
water water Treatment
production
Tap (rinse) water Plant 2/3
Consumables
Defense Input Output
Materials
(DIO) Database Fuel
Exhaust stack/
Waste Air Emissions
Haz. Waste
scrubber
Costs and environmental impacts are compared per ft2 of plating over a 15-year line life span. The
analysis system boundary includes the plating line, support infrastructure, and the DoD supply chain.
© 2018 Noblis, Inc. 7
Plating line: Cd baseline
COMPONENTS
Type II
Process or
Rinse Tank
The baseline includes a 15-year lifespan; capital costs associated with line installation are sunk.
Inputs and outputs for components with and without post-treatment are included.
© 2018 Noblis, Inc. 8
Plating line: Zn-Ni alternative
COMPONENTS
Process or
Rinse Tank
COMPONENTS
Not in
Process Line
The Zn-Ni alternative includes a 15-year lifespan and capital costs associated with line installation.
Additionally, high and low labor estimate scenarios were included.
© 2018 Noblis, Inc. 9
Inventory example
Each modeled activity captures inputs, outputs, cost, and link to supply chain
Foreground data were collected from FRCSE, while background data from the Defense Input
Output Database (DIO) were used.
© 2018 Noblis, Inc. 12
Life cycle costs (LCC)
Summary of LCCs
Cd - Baseline Zn-Ni (1) Zn-Ni (2)
PV of Investment Costs
Equipment & Materials $ - $ 1,387,000 $ 1,387,000
Labor $ - $ 500,000 $ 500,000
Waste Management $ - $ 150,000 $ 150,000
Total Investment $ - $ 2,037,000 $ 2,037,000
PV of Annual Costs
Labor $ 1,592,877 $ 1,592,877 $ 550,335
Materials $ 129,087 $ 46,342 $ 46,342
Utilities $ 717,087 $ 290,103 $ 290,103
Waste Management $ 722,501 $ 403,253 $ 403,253
Total Recurring $ 3,161,552 $ 2,332,575 $ 1,290,032
NPV $ 3,161,552 $ 4,369,575 $ 3,327,032
Life cycle operating and maintenance costs are lower for Zn-Ni than Cd plating
$ external cost / m2
Life cycle impacts increasingly improve the more corrosion data impact the
maintenance cycle
© 2018 Noblis, Inc. 15
Conclusions