Schedule A
Schedule A
SCOPE OF WORK
The CLIENT understands and agrees that the Services under this Agreement will have components of Services, consumables
required for provision of such Services. In case Client on a specific written request to the Service Provider requires Service
Provider to procure any materials for the consumption of the Client and/or requires Service Provider to enter into a Works
contract, in such case Service Provider and Client shall enter into a new arrangement on the terms mutually acceptable to
both Service Provider and the Client. However, Knight Frank responsibility will be limited to manage all the vendors appointed
/ nominated by client to deliver the below mentioned services
D.G. Set
Electrical
Water supply
Fire Alarm Systems & Public-Address System
Fire Hydrant System
Lift
Housekeeping
Pest Control
Security
1.2 ELECTRICAL
• KF Managed agency will Operate and maintenance of the Electrical equipment (As per master
list of asset equipment's) in accordance with the manufacturer’s instruction manual
• Maintain and update equipment history card regularly.
• Daily checklist for panels.
• Cleaning of panels.
• Cleaning of all electrical rooms.
• labelling of feeder’s floor wise.
• Resetting of any fault annunciations to restore the power supply.
• Preventive maintenance as per 52-week PPM planner.
• Electrical drawings to be collected and referred as when required.
• Planned Preventive Maintenance schedules to be adhered to all panels and motors.
• Checking of all motor terminals for any tightness of cables.
• Abnormal noise in the motors.
• Greasing of all movable parts.
• Overheating of motors during operations.
• Any mechanical obstructions during the movements.
• Trouble shooting of any problems happening on LT side
• Check of all safety controls and electric switch gears-condition of contactor tips, oiling of pivots,
tightening of connections to prevent sparking etc.
• Regular cleaning of motors—inspects terminals and clean. Check correctness of readings.
• Check for any irregularity in the panels, transformers or any other electrical system.
• Monitor all electrical parameters like Voltage, Current, Frequency, Power factor, KVA and KVAR,
KW and KWH etc. of LT Panel and metering station.
• Frequent checks of all MCBs –replacement of all faulty ones.
• Check all the cables, bus bars, termination tightness, insulation, overheating, etc. for the panels
and cables on routine basis.
• Replacement of faulty lights and fixtures.
• Replacement of any fused lamps in street lights.
• Replacement of any faulty chokes in street lights.
• Replacement of any faulty ignitor in street lights.
• Replacement of any faulty lamp holders in street lights.
• Rectification of faulty street lights.
• Replacement of any equipment / switch gear due to normal wear and tear.
• Attending to break down call from customers for Electrical related complaints for emergency.
Consumables & Spares client scope
1.6 LIFTS
• KF Managed agency will Coordinate with AMC team and managing the same
• To conduct periodic testing through authorized agency and to get the safety certificate.
• To ensure all emergency signage’s are in place
• To ensure emergency communication tools are available
• To ensure elevator rooms and pits are maintained well with respect to housekeeping by the
OEM
• To ensure elevator ambience and aesthetics are maintained absolutely with high standard.
• To ensure AMC vendor adhere to the service level agreements.
• Lift Operation & Rescue training will be done periodically with the help of OEM
• KF Managed agency will manage Rodent control: domestic and field rodents
• Fly control, Mosquito control
• To provide customized audits and schedules for pest control measures.
• To repeat the services at such additional frequency as and when required
• KF Managed agency to provide all consumables, equipment and materials which shall be of good
and standard quality
• Material Safety Data Sheet to be provided for all the chemicals they use for pest control.
• Regular monitoring to check the efficiency of the services
• Submitting reports at the end of each service and obtain certification from property
management team that the job has been completed satisfactorily.
• KF Managed agency’s responsibility to ensure the disinfectants, insecticides and pesticides used
in the services shall be safe, having less toxic levels, duly approved by WHO and Central Insecticide
Board.