PENULANGAN KOLOM

Rasio Penulangan
ρ min = 1,4/fy = 0,0058

ρ balance = = 0,0536

ρ max = 0,75 x ρ balance = 0,0402

Penulangan Kolom
Dimensi
b = 400 mm
h = 400 mm
d = 400 - 25 - 10 - (0,5 x 19) = 355,5 mm
Rencana tulangan
Pokok = D 19
Sengkang = Ø 10
Selimut beton = 25 mm
f'c = 25 Mpa
fy = 240 Mpa
Faktor reduksi = 0,65
Output SAP2000
Mu = Output SAP2000 = 14203604,7 Nmm
Pu = Output SAP2000 = 521424,55 N
Penulangan Kolom
Mu
Eksentrisitas = = 27,24 mm
Pu

Luas Penampang = bxh = 160000 mm2

Pu
Sumbu vertikal = = 0,236
ø x Ag x 0,85 x f'c

(Pu) x (e)
Sumbu horizontal = = 0,016
(ø x Ag x 0,85 x f'c) x (h)

Penentuan rasio penulangan dengan grafik


r = 0,002
β = 1
ρ = rxβ = 0,002 < 0,0058
As perlu = ρ min x Ag = 933,33 mm2
As pasang = 1701 mm2 6D19
Dipasang sengkang = ujung kolom = Ø10 - 150 mm
= tengah kolom = Ø10 - 200 mm
Kapasitas Kolom
ØPn = 0,80.Ø.(0,85.f'c(Ag-Ast)+Ast.fy = 6260255,95 N
Pu = 521424,55 < 6260255,95 OK