10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240

100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300mm at A1
4 A-0213 This drawing should be read in
conjunction with all relevant contracts,
A-0213 3 specifications and drawings. Dimensions
are in millimetres. Levels are metres. Do
not scale off drawings. Use figured
dimensions only. Check dimensions on
Site. Report discrepancies immediately.
350 8700 350 KEY BUILDING NOTES

RAC BEDS: 24
2600 1499 1101 1179 1496 2750 2750 INPATIENT BEDS: 10
EMERGENCY DEP: 2
BO BO BO BO BO BO CLIMATE ZONE: 4
237

12 150 2350 3450 1170 1730 4150


BCA CONSTRUCTION TYPE
448

MAIN BUILDING: TYPE C


898

2200 BCA SECTION J - PART J 1 & J 2 MINIMUM TOTAL U-VALUES


DP.01
600

ROLLER DOOR DP.01 ROOF / EXPOSED CEILING : R 3.2 DOWNWARD


ROOF SOLAR ABSORPTANCE : LESS THAN 0.4
150

BLOCK WALL EXTERNAL WALLS: R 2.8


SLAB ON GROUND: NIL
SLAB SUSPENDED: NIL
METAL FRAMED GATE WITH
920 VERMIN MESH. FREE LEVER BCA CLASSIFICATIONS
OPENING HANDLE TO BOTH SIDES CLASS 9A - ACUTE SERVICES BEDS & TREATMENT AREAS
CLASS 9C - RESIDENTIAL AGED CARE (RAC)

190mm CORE FILLED


CONCRETE BLOCKWORK

SHEET NOTES

SPRINKLER PUMP
ROOM
5200

5200

45.2 m² GENERATOR

GALVANISED VERMIN
MESH TO EQUAL ANGLE
FRAME
7 3D - SPRINKLER PUMP ENCLOSURE
150
600

LINE OF ROOF ABOVE

SHS COLUMNS TO STRUCTURAL 600


4099 ENGINEERS DETAILS. 6621
METAL PROFILE ROOF SHEETING.
COLOUR TO MATCH MAIN BUILDING 150 7 22/03/19 ISSUE FOR CONSTRUCTION DJRD
6 29/02/19 DJRD ISSUE FOR INFORMATION JP
5 22/12/16 CD FINAL - REV3 PVH
1 PUMP ENCLOSURE - GENERAL ARRANGEMENT PLAN FOLDED METAL FLASHING 4 2/12/16 CD FINAL - REV2 PVH
A-0213 1 : 50 5° 3 18/11/16 CD FINAL - REV1 PVH
Q R 2 01/11/16 CD FINAL PVH

185
1 9/09/16 CD DRAFT PVH
680

GUTTER (GUT.01)
9000 4000

150 2350 3450 1170 1730 150


LYSAGHT NOVALINE FASCIA
150 850 4500 150 600 945 1655 150 (FAS.01) WITH TIMBER PACKING

COL
150

150

150

COL COL ISSUE DATE SUBJECT VALID'N.


850

ROLLER DOOR INSTALLED TO Level 6, 77 Pacific Highway


North Sydney, NSW, 2060
MANUFACTURES DETAILS T 02 9978 5402
2300

2%

GALVANIZED FRAMED PROJECT MANAGER


2850

Level 5/9 - 13 Castlereagh St

2950
VERMIN MESH FIXED TO Sydney, NSW, 2000
INSIDE OF COLUMN; EXTEND T 02 8256 0500
TO UNDERSIDE OF ROOF
RL 421.200 RL 420.400 RL 421.100 STRIP FOOTING BELOW TO GALVANIZED FRAMED VERMIN MESH FIXED
STRUCTURAL ENGINEERS DETAILS TO INSIDE OF COLUMN; EXTEND TO DESIGN & CONSTRUCTION MANAGER
2% Unit 1, 155 Newcastle Street
UNDERSIDE OF ROOF
5500

3500

600

Fyshwick, ACT, 2609

2085
SUMP AS PER HYDRAULIC T 02 6143 2900
ENGINEERS DETAILS
HOT DIPPED GALVANISED SHS HOT DIPPED GALVANISED SHS
STRUCTURAL & CIVIL ELECTRICAL & MECHANICAL
PLINTH SIZES TO BE COLUMN TO STRUCTURAL COLUMN TO STRUCTURAL 103 Tennant Street Level 7, 16 Marcus Clarke Street
CONFIRMED ON SITE ENGINEERS DETAILS ENGINEERS DETAILS
1500

Fyshwick, ACT, 2609 ACT, 2601


WITH EQUIPMENT T 02 6285 1766 T 02 6113 3200
RL 421.200
2300

CONCRETE SLAB ON 50mm HYDRAULICS FIRE ENGINEER


2%

SAND BLINDING. REFER TO Lev.1 / 54 Union St Suite 3, Level 4, 83 Kippax St


Cooks Hill, Newcastle, Surry Hills,
STRUCTURAL ENGINEERS
NSW, 2300 NSW, 2010
DETAILS
850

850

T 02 4926 4811 T 02 9211 4333


COL COL
GROUND LEVEL GROUND LEVEL
150

150

150

COL RL 421.100 RL 421.100


FOOTING TO STRUCTURAL
ENGINEERS DETAILS

ARCHITECT
2 PUMP ENCLOSURE - CONCRETE SET DOWN AND PENETRATION PLAN T +612 9319 2955
A-0213 1 : 50 ABN: 48 942 921 969
Nominated Architects:
Andrew Hipwell 6562
Q R 5 PUMP ENCLOSURE - SECTION 01 6 PUMP ENCLOSURE - SECTION 02 Daniel Beekwilder 6192
R Q A-0213 1 : 20 A-0213 1 : 20
djrd 63 Myrtle Street
Chippendale NSW 2008
4 12 architects
Sydney Australia
A-0213 djrd.com.au
PROJECT

MPS Southern - Harden


PROFILED METAL ROOF

SHEETING. COLOUR TO MR.01
MR.01 MATCH MAIN BUILDING

54 SWIFT STREET, HARDEN NSW 2587


GALVANISED VERMIN MESH
TO UNDERSIDE OF ROOF
5 6 PHASE
METAL FRAMED GATE WITH A-0213
FOR CONSTRUCTION
A-0213
VERMIN MESH. FREE LEVER
HANDLE TO BOTH SIDES CONCRETE SLAB. DRAWN SCALE AT A1 ORIGIN DATE
ROLLER DOOR REFER TO STRUCTURAL
ENGINEERS DETAILS RBA As indicated 08/25/16
DESCRIPTION
GROUND LEVEL
GROUND LEVEL
RL 421.100
RL 421.100 SPRINKLER PUMP ENCLOSURE

PROJECT No DRAWING No REVISION


4 PUMP ENCLOSURE - SECTION 1
3
A-0213
PUMP ENCLOSURE - ELEVATION
1 : 50
A-0213 1 : 50 19401 MPSHD-HI-AR-DWG-A-0213 7