FOR CONSTRUCTION

0 5. APR. 2019 FOR CONSTRUCTION HASNUL Y. H. KO S. N. BAEK

REV. DATE DESCRIPTION DSGN CHKD APPD

OWNER :

PROJECT :
MELAKA 2,242MW COMBINED CYCLE GAS TURBINE POWER PLANT

EPC CONTRACTOR :

SUB-CONTRACTOR :

DESIGNED BY DATE TITLE :

HASNUL 5. APR. 2019 APPROVED MATERIAL FOR


CHECKED BY DATE BITUMINOUS JOINT SEALANT AND
Y. H. KO 5. APR. 2019 FLEXIBLE JOINTING MATERIAL
APPROVED BY DATE (FILLER BOARD)
S. N. BAEK 5. APR. 2019

SCALE DOCUMENT NUMBER REV.

N/A MLK-A-S-030-91-00017 0