Questionnaire

I am Huruy Gebreslassie, a Master of Technology student, in Civil Engineering with Specialization


in Construction Management at the School of Sharda University. I am in the process of making
my final project, the topic being “Study on Time Delay Analysis for Road Construction”. This
research is aimed to identify the key factors influencing to delay in construction project
performance mainly on Lideta Tsebel-Timbaho monopo -Bulgaria mazoria-Lancha-Israel
Garage-Meskel flower (Gazebo) Road Project. To identify the delay factors, to deliver the
reasonable solutions and to improve the project performance by conducting analysis from project
leadership, organizational and external factors are necessary. In context to the same, I have
prepared a questionnaire, which I would request you to fill up. I would like to confirm you that
your response will be kept strictly confidential and it will be used exclusively for the purpose of
this research.

Therefore, please find the questionnaire attached and fell free to add any additional comments. If
you face difficulty answering any question, you could leave it blank.

Thank you very much in advance for your assistance


Your experience in construction work 1-5 year 5-10 10-15

1. Your job title..........................................................................................


2. What do you think the main cause of delay in this project? List top five delay factors
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
3. What type of contract do you use in this project?
Lump sum unit price preconstruction service only with hard bid
construction package Lump sum, fixed price (no GMP) Cost plus fee with G-max
Others, please explain ___________________________________
4. How do you rate the final quality of work on the project? Better Same Worse
No opinion
5. If the answer to the above question is better or worse, explain primary reason for the
difference?
________________________________________________________________________
________________________________________________________________________
____________________________
6. Do you formally evaluate the project performance quality? Yes No
7. If the answer to No 7 is yes do you think that the performance rating creates an incentive
to achieve quality? Yes No why?
________________________________________________________________________
________________________________________________________________________
_________
8. In the table below you can write only the numeric from the list if you believe the given
delay factors are the cause of delay for Lideta Tsebel-Timbaho monopo -Bulgaria
mazoria-Lancha-Israel Garage-Meskel flower (Gazebo) Road Project. Please write
your rank on “Rank your delay factor from the list”.

No Delay factors that may in this company occurs Rank your delay Rank your list if you have your
factor from the list own delay factors out of the
given lists from list
1 Owner financial problems/client finance/economic
ability for the project
2 Shortage in equipment/insufficient number
3 Inadequate contractor experience (work) causing
error
4 Shortage (availability) in construction materials
5 Equipment failure (breakdown)
6 Design errors made by designers (due to
unfamiliarity with local conditions and environment)
7 Mistakes in soil investigation
8 Poor subcontractor performance/delay
9 Rework due to change of design or deviation order
10 Poor site management and supervision by contractor
11 Rework due to change of design or deviation order
12 Poor site management and supervision by contractor
13 Wrong or improper (poor) (inappropriate) design
14 Faulty soil investigation paper
15 Lack of skilled operators for specialized equipment
16 Slow land expropriation due to resistance from
occupants
17 Political interference
18 Reworks due to defects in construction materials
19 Design changes by owner or his agent during
construction
20 Physical obstructions
21 Delay of design submittal from consultant
22 Unexpected underground condition
23 Political situation