Manual de Operación Grúa Pórtico
Manual de Operación Grúa Pórtico
FOR
12 UNITS OF ERTGs
FOR APM TERMINALS AT CALLAO, PERU
(ZP12-1934)
We reserve all rights in this document and in the information contained herein.
Reproduction, use of disclosure to third party without express authority is strictly
forbidden. (C) ZPMC, Shanghai Zhenhua Port Machinery Co., LTD.
Crane Operator’s Manual
Table of Content
1. About This Manual ............................................................................................................................. 1
2.2.2 Housekeeping.........................................................................................................................................5
i
Crane Operator’s Manual
ii
Crane Operator’s Manual
4.9.1 Spreader...............................................................................................................................................42
5.1.1 Floodlights...........................................................................................................................................46
iii
Crane Operator’s Manual
2
Crane Operator’s Manual
(13) Do not disable any warning or Personal safety and the safety of the
safety devices on the crane. If you crane(s) is a responsibility we cannot over
believe that there is a problem, always emphasize. It is a responsibility and
ask maintenance personnel to fix the accountability which each of us must
problem at hand. embrace. Because this is a big crane
(14) If you see an OUT OF ORDER or and it is powerful, we need to be alert at
DO NOT OPERATE placard or sign all times when we are on this crane or
anywhere on the crane, do not around it. We need to be even more
remove it. aware of safety when we operate this
crane.
(15) Maintain a log of important
happenings during your shift on the 2.2.1 Personal Safety
crane. Share the information with
the next crane operator who will (1) You should wear a hard hat at all
replace you, so he knows what he times except when you are seated
needs to watch for. Share the inside the cabin. You should also
information with crane maintenance wear steel toed safety shoes.
so they are alert to any problems (2) While seated in the operator’s cabin,
requiring immediate attention, and please wear a seat belt. It is easy to
know about problems which can be fasten and easy to adjust.
addressed during normal crane
maintenance.
3
Crane Operator’s Manual
4
Crane Operator’s Manual
(10) In the event you have any the pin pockets. Then tight the stowage
symptoms of a heart attack, stroke, rope on the crane to pockets in the wharf.
seizure or otherwise become ill while
operating the crane, please take It is important for the crane operator or the
defensive and prudent actions for you maintenance personnel to stow each
own health and well being. Use the crane on the dock when the cranes are
radio or intercom system in the left unattended.
operator’s cabin to call ground
personnel and anyone on the crane If not stowed, there is danger
for help. Do not take any that in the event of a high
unnecessary risks. Drive yourself to wind condition, the cranes
the trolley park position only if you feel could roll down the runway in
well enough to do so.
spite of the gantry brakes.
crane is not designed to operate in wind shown on it. Always reset the E-stop
speeds exceeding 25 m/s. All crane unless it is intentionally latched out.
motion is not allowed at this point. Otherwise control power cannot be
re-established.
Realize that a 20 m/s wind is a strong
wind and 25 m/s is a very strong wind.
For your own safety we suggest that you
have the trolley parked, and Inform
maintenance personnel to have the trolley
and gantry stowed well before you
encounter 25 m/s wind speeds, and then
come off the crane.
6
Crane Operator’s Manual
The crane is equipped with bumpers and Become watchful for unusual sounds,
limit switches to prevent collisions or over abnormal vibrations, slack wire ropes,
travel. slack electrical cable, abnormal
movements of the energy chain cable
Bumpers and electrical protection are
system, or other unusual events. Stop
provided for the trolley. Bumper stops
the crane and ask maintenance personnel
are located at the end of trolley runways.
to check and correct the problem.
Both slow down check and stop switches
are provided along the trolley runways so
that the trolley is stopped before it
contacts the bumper stops. In spite of
the bumpers and limit switches, please
use the master switch controller to stop
motion before reaching end of travel.
7
Crane Operator’s Manual
3. Main Particulars
(6) Lift
Total 21.0 m
8
Crane Operator’s Manual
9
Crane Operator’s Manual
10
Crane Operator’s Manual
The operator’s cabin is purposefully and All master switches, indicating lights,
ergonomically designed to serve the selector switches, joy-sticks, and other
crane operator. Attention was focused control devices have been conveniently
on providing comfort and convenience so arranged on the left and right consoles,
you can concentrate on the serious task of side panel, and auxiliary panel on the wall.
handling containers, and not be distracted so you can access any of them without
or encumbered by uncomfortable leaving your chair. The spreader
surroundings. indicating box is in front of the cabin for
easy observing.
The console features a comfortable chair.
There is a manual seat adjustment that The left and right windows can be opened
allows the seat to be moved forward of for fresh air, and have rolling up sun
afterward in relation to the consoles. An shades.
adjustable seat belt and shoulder harness
are for your safety and should be used at The operator’s cabin is also provided with
all times when operating the crane. air conditioner, lighting, intercom etc.,
please refer to Fig. 4-1.
11
Crane Operator’s Manual
12
Crane Operator’s Manual
13
Crane Operator’s Manual
The deflection of the handle initiates the load to move into the direction
matching the handle movement.
14
Crane Operator’s Manual
If the master switch is deflected to one direction then the motion speed will
increase according to the drive’s ramp limited up to the reference matching
the deflection position of the handle. This reference speed is continuously
adjustable from zero up to the maximum speed level currently permitted.
This means that if the drive is free, the speed can be preset from zero to
rated speed. While if there is a limitation to lower speed, the full of range of
the master switch is rated to this lower speed level.
If the master switch is brought to the opposite direction, the speed will be
electrically reduced to zero first before starting into the other direction.
During this period the brake remains opened all the time.
If the master switch is brought back to its zero position, the speed will also
be reduced electrically first until nearly zero before the brakes are applied
for smooth stopping.
There are 2 small push buttons (item 10, 11) on top of the master switch for
spare.
Push this button will activate the spreader rotate to the home position.
When the spreader is at home position, this green indicator lamp will light.
When the auto steering is controlled by the GPS system, this indicator is
on.
15
Crane Operator’s Manual
When the auto steering is controlled by the GPS system, this indicator is
on.
When the steering is selected in automation mode, the auto steering will
controlled by AECT system when crane is powered by AECT system and
will controlled by GPS system when crane is only powered by engine
generator set.
When the steering is selected in spare mode, the steering will be controlled
by operator himself.
When the operator begin to move trolley, hoist or gantry, he must alarm the
personnel near around by push this foot step switch, the horn outside the
operator cabin will sound.
16
Crane Operator’s Manual
When the spreader is in twin mode, this joystick is used to control the
spreader extend or retract.
12. Spare
13. Spare
There is a laser guided stack profiling system is RTG. It is used to avoid the
hanged container hitting to the stack container when trolley is moving. The
laser guided stack profiling system can be bypassed by this 2 way key
switch.
17
Crane Operator’s Manual
18
Crane Operator’s Manual
19
Crane Operator’s Manual
If the master switch is brought to the opposite direction, the speed will be
electrically reduced to zero first before starting into the other direction.
During this period the brake remains opened all the time.
If the master switch is brought back to its zero position, the speed will be
reduced electrically first until nearly zero before the brakes are applied for
smooth stopping.
There are 2 small push buttons (item 9, 10) on the top of the master switch
for spare.
When the master switch is moved at left or right direction, then it is used to
control the spreader for skew function at CCW or CW direction. The
maximum angle of skew is 5 degree. The headblock pump shall be run
before head for the skew function.
When the spreader is landed and the spreader function is OK, then these
two thumb buttons can be used to control the spreader twistlocks lock or
unlock.
When the RTG is switched on and ready for control, this indictor will be on.
This 2 way key switch is used to switch on or off the main power to
inverters. Only when the RTG is in switch on status can the operator
control the RTG. When the control system is switch off, RTG can not be
operated.
20
Crane Operator’s Manual
Switching on the main supply for inverters with this key switch is possible
only under the following conditions:
This 2-Pos joystick can be used for manual steering of the crane gantry.
Steering of the crane is done by putting different speed levels to the
inverter which drives different side gantry motors.
The crane will turn to counter-clockwise direction when the gantry running
to left with gantry steering “Near side” and will turn to clockwise direction
when the gantry running to right with gantry steering “Near side”.
The crane will turn to clockwise direction when the gantry running to left
with gantry steering “Far side” and will turn to counter-clockwise direction
when the gantry running to right with gantry steering “Far side”.
When there is fault occurred, the red indicator will light. If this fault is
removable, press this push button will reset the control system. If this fault
can not be removed after press this push button, the operator shall inform
the maintenance personnel to solve this fault.
This foot step switch is to control the microphone of the intercom on or off.
21
Crane Operator’s Manual
This push button is used to control the headblock pump and spreader
3-phase power contactor on or off, if the headblock pump and spreader
3-phase power contactor are on, then the green indicator is on. The
headblock pump and spreader 3-phase power contactor must be on before
head for the skew function and spreader function..
When this switch is in AUX, position, the push button Diesel start and
Diesel stop is used to control the auxiliary diesel.
22
Crane Operator’s Manual
This push button is used to retract the spreader to 20 feet position. If the
spreader is in 20 feet position, the green indicator will be on.
This push button is used to retract the spreader to 40 feet position. If the
spreader is in 40 feet position, the green indicator will be on.
This push button is used to retract the spreader to 45 feet position. If the
spreader is in 45 feet position, the green indicator will be on.
This white push button is used to test all the indicators and buzzer inside
operator cabin except those for diesel generator set.
23
Crane Operator’s Manual
24
Crane Operator’s Manual
When the fuel tank level is under half, this red indicator will on as for alarm.
When the fuel tank level is almost empty, this red indicator will on and the
engine will shut down after 10 seconds delay. The delay time can be set in
the engine control panel.
25
Crane Operator’s Manual
When there is any fault in diesel or generator, this indicator will be on and
diesel engine will shut down.
When the crane is powered from diesel engine, this indicator will be on.
When the electricity connecting trolley is connected to the city power rail,
and the engine controller is selected in automation mode, operator can turn
this 2- Pos. selector switch to “On” position to feed the city power to crane.
After the city power is fed to the crane, it is recommended to shut down the
diesel engine for save the fuel.
When the crane is powered from city power, this indicator will be on.
There is a reflector board on the city power conduct bar. When the crane
moves to the position that the detecting laser is on the front of the reflector
board and the distance from laser to the reflector board is between
26
Crane Operator’s Manual
There are some limit switches installed on the city power bar for the crane
to judge the position. When the crane PLC judges the collector trolley is in
the city power change area, this indicator is light.
27
Crane Operator’s Manual
There are some limit switches installed on the city power bar for the crane
to judge the position. When the crane PLC judges the collector trolley is in
the city power bar connected area, this indicator is light.
When the collector trolley is extended and up, this indicator is light.
When all the wheel are in 16°position, this indicator is light. Then the
crane can rotate.
When the 1#, 3#wheel are in 0°position and 2#,4# wheels are in 90°
position, this indicator is light. The crane shall be in this position when it is
not in operation for long time.
This black push button is used to control the floodlights except gantry
floodlights on or off.
This black push button is used to control the gantry floodlights on or off.
This push button can be used to switch on or off all walkway lights in RTG.
28
Crane Operator’s Manual
In the middle of each girder, there is a stow pit for trolley anchorage. When
the trolley is stowed, this indicator is light.
This box provides elementary information about the RTG and spreader status
with regard to twistlock movements. It is placed near the cabin ground level
located inside the operator’s view even while he is basically watching the load.
All indication elements of this box will be described below according to their
label.
29
Crane Operator’s Manual
There is a touch panel in the cabin. This touch panel is used to showing the
crane operating or alarm status to operator.
30
Crane Operator’s Manual
31
Crane Operator’s Manual
32
Crane Operator’s Manual
Before starting the diesel engine, from full speed to idle speed for 2 minutes,
checking the diesel lubricant oil and then engine will automatically stop.
coolant to ensure no any problem exists
with current operation. Switch on the After the diesel is running stably in speed
battery isolator and then check the battery 1800rpm, the operator shall check if the
voltage from the Gen-set controller on indicate of the generator voltage and
engine control panel. frequency are 480VAC, 60Hz (the
operator can check the diesel speed and
If the lubricant oil and the
voltage from the Gen-set controller
“InteliGen” display). If the diesel is running
coolant level is low,
in a working speed stably but the output
maintenance staff should be
voltage and the frequency are not right,
called to refill the lubricant oil or maintenance staff should be called to
coolant. If the battery voltage is adjust the diesel-generator set. If the
lower than 24V, maintenance indicates are OK, switching on the main
staff should be also called to power switch. The GCB ON/OFF button
on the bottom line of the controller
check and recharge the battery.
“InteliGen” shall be pressed for the engine
Engine can be controlled in this Gen-set power contactor is energized and connect
control Panel. the engine power to crane.
First, the “POWER OFF/ON” key selector After finishing doing these steps, operator
switch shall be put to ON position, the shall retract the engine room inside
engine controller “InteliGen” is powered. platform, or the gantry can not move by
Then this engine controller “InteliGen” can the interlock of the inside platform limit
control the engine start or stop. switch. Then operator can go upstairs to
the cabin to continue his work.
There are four modes in the controller
“InteliGen”: STOP, MANUAL, AUTO,
TEST. Please note: the seamless
changeover between city power and
engine power can only when the mode is
selected in AUTO mode.
33
Crane Operator’s Manual
When select AUTO, the engine is (2) All emergency safety limits and
controlled by the selector switch on switches must be in their normal state
auxiliary panel in cabin, please see item 5: (un-actuated). This includes over
Diesel (seamless) Off/On. Put this speed switches (hoist over speed
selector switch at ON will start the engine switch) and over travel limit switches
running in idle speed for 2 minutes, then (trolley forward over travel, trolley
engine will automatically running in full reverse over travel), not any BYPASS
speed 1800 RPM. Put this selector switch activated.
at OFF will decelerate the engine from full (3) There are no faults or warnings
speed to idle speed for 2 minutes, then presented.
engine will automatically stop.
Before operating the crane,
If the above procedure can not crane stowage pins on the
carry out, maintenance staff nearside and farside gantry
should be called to check the need to be released.
diesel-generator set and their
control panel. 4.4.2 Control power on
Normally, the operator can leave After entry into operator’s cabin and sit in
the main power switch at ON
the chair, following action shall be taken to
turn on the control power.
position.
(1) Put the key selector switch "Crane
After finished all the jobs in the switch ON/OFF" on the right console
engine room, the operator to ON position.
should fold the engine side (2) The white indicator "Crane switch on"
platform to home position. To will light up.
fold the side platform, the rope
4.4.3 Start spreader and headblock
drum can be used.
Switch on spreader 3-phase power supply
4.4 Put the Crane into Operation and running headblock pump by pressing
the green illuminated pushbutton
4.4.1 Permission “Headblock pump ON/OFF” on the right
control console vertical penal. After the
A number of permissions are required to
green light is lit up, the spreader and
be present before the crane control can
headblock are ready for operation.
be started.
4.4.4 Ready for operation
(1) Make sure all emergency stop
pushbuttons are released.
34
Crane Operator’s Manual
(1) Put the load on the ground and 4.6.1 Operation from operator’s cabin
release it from the spreader.
When the crane control power is switched
(2) Raise the spreader to a position on from the operator’s cabin, the speed of
around 15 meters above ground and the main hoist corresponds to the master
retract the spreader to the 20’ switch on the right console. This master
position. switch is used for main hoist directions
(3) Move trolley to parking position, which and speed reference, forward to lower the
align with the operator’s cabin access load and reverse to raise the load. The
gate. master switch will spring return to center
position when release it. The operator
(4) Stow the crane properly, details
may stop the motion at any time by
please refer to 2.2.3.
returning the master switch to the center
(5) Turn off the crane control power by position. The main hoist drive will
put the key selector switch “Crane accelerate or decelerate at full capability
switch ON/OFF” on the right control in order to achieve the speed requested
console to OFF position. by the master switch.
(6) Turn off the floodlights if they are on.
During operation if you
(7) Close the door and windows of the
observe that the spreader
operator’s cabin after getting off.
cable is not spooling
4.6 Main Hoist Operation correctly, please stop
immediately and ask a
maintenance technician for
35
Crane Operator’s Manual
36
Crane Operator’s Manual
operate at higher speed when handling Main hoist is equipped with a slack rope
light load, and lower speed when lifting limiting device which senses rope tension
heavy load. and prevent the main hoist from paying
out wire ropes when the hoist ropes go
4.6.4 Working limits slack.
Control system provides smart slowdown In the hoisting direction the device limits
and stop to prevent travel into the end the hoisting speed to approximately 20%
stops. At the end stops, the motion is still rated base speed until the weight of load
operable in the opposite direction. The is fully supported by the hoist wire ropes.
automatic smart slowdown feature will
minimize the low speed travel distance Always pay attention to the
near the end stops, and increase the
wire ropes. Do not rely on
overall performance of the hoist,
the slack rope protection only.
especially when utilizing the full hoisting
height. While ropes go slack, hoist up
slowly and make sure the
4.6.5 Over travel back-out ropes not being hooked by
(1) The operator must press and hold the An overload condition will be detected if
“Overdrive bypass” red push button the load under the spreader or cargo
on the right control console vertical beam exceeds 110% of rated load. An
panel. indicator “Overload” mounted on the
spreader status indication box in the front
(2) Reset the control power from the
bottom position of operator.
operator’s cabin.
(3) Lower the spreader to back out the A hoist overload condition will disable all
over travel condition. In this progress, motions, and only lowering at slow speed
the main hoist speed is limited. is allowed.
(4) Stop hoist motion and release the The main hoist resets to normal speed
“Overdrive bypass” red button. once the overload condition removed.
37
Crane Operator’s Manual
maintenance mode
When spreader is removed from the
headblock, operator can select
maintenance mode to hoist the headblock. Fig. 4-20 Trolley motor
The spreader cable should be insert the
dummy socket on headblock before head. Trolley travel can be operated from the
The hoist speed is limited in maintenance operator’s cabin.
mode.
4.7.1 Operation from operator’s cabin
Spreader mode
When the crane control power is switched
Spreader mode is the normal mode of on from the operator’s cabin, the speed of
RTG operation. When this mode is trolley travel corresponds to the master
selected, all spreader functions are switch on the left console. This master
enabled. switch is used for trolley travel directions
and speed reference, forward to move
See section 4.9.1 for spreader operation.
trolley to farside and reverse to move
Cargo mode trolley to nearside. The master switch
will spring return to center position when
When operator wants to lift other cargo
release it. The operator may stop the
but not container, he can select cargo
motion at any time by returning the master
mode to do it.
switch to the center position. Trolley
4.7 Trolley Travel Operation drive will accelerate or decelerate at full
capability in order to achieve the speed
requested by the master switch.
38
Crane Operator’s Manual
Control power is not on, or not Fig. 4-22 Cabin gate limit switch
reset from the operator’s cabin.
Operator is not in seat.
Trolley travel forward or reverse
end-of-travel reached.
Trolley is anchored.
Trolley access gate is not
properly closed.
Cabin gate is not properly
closed.
39
Crane Operator’s Manual
minimize the low speed travel distance 4.8 Gantry Travel Operation
near the end stops, and increase the
overall performance of the trolley.
40
Crane Operator’s Manual
41
Crane Operator’s Manual
The crane is provided with anti-collision gantry motion is running. These devices
systems to prevent collision to container, will be automatically actuated whenever
obstacle or to other crane. the gantry is traveling.
42
Crane Operator’s Manual
43
Crane Operator’s Manual
This motion will rotate the spreader or manual control panels are used
container either clockwise or for maintenance use only, there
counterclockwise. only exist interlocks of wheel
The skew function is controlled by the lockpins unlock for wheel turning
master switch: Skew left/Skew right on manually, the operation should
right control console. The motion will stop be attended by two maintenance
when operator release the master switch. staff in the same time. One is
operator and the other should be
Green Illumination Push Button: Spreader
home position on the right control console the observer.
will re-center the spreader and bring it to
its home position. The lamp lights to The operation of these two panels are the
indicate that the spreader is in home same, please refer to the following for the
position. operation procedure.
44
Crane Operator’s Manual
45
Crane Operator’s Manual
46
Crane Operator’s Manual
47
Crane Operator’s Manual
There totally 4 air conditioners supplied Fig. 5-10 Air conditioner outdoor unit
with the crane. 3 of them are installed in
the electrical room. 2 air conditioners in 5.3 Communication System
electrical room can start to work
To permit internal communication,
automatically after power on while the
intercom stations (telephones) are
other one is as spare. The forth one is
provided on the crane at following
installed in the operator cabin. It can be
locations: operator’s cabin, electrical room,
controlled by the operator manually. The
each side under sill beam, outside engine
remote controller is located on the wall.
room and trolley platform.
The temperature can be set according to
the willing of operator.
48
Crane Operator’s Manual
49
Crane Operator’s Manual
5.6 Outlets
50
Crane Operator’s Manual
In the event of an emergency, safe egress can climb through or over the hand rails to
from the operator’s cabin is possible, reach girder walkway.
anywhere along the trolley runway.
(1) From the platform of operator’s cabin,
The operator in the cabin needs to reach through the ladder attached near the
the top of the trolley by climbing onto the outside cabin, to the top of trolley
cabin roof using the fixed ladder platform.
positioned at the cabin landing adjacent to (2) From the trolley platform, across the
the door. From the trolley, the operator handrail, to the normal walkway
Operating Instructions
For
51
12 UNITS OF ERTGs
____________________________________
________________________________
___________________________________
_________________________________
Tel: 86-21-58396666
Fax: 86-21-58399555
http://www.zpmc.com