ABC Corporation is looking to automate the correspondence process for the software application, cde.
Customer service agent use cde SYSTEM to process the new applications but to mail the confirmation
letter, they manually print the letter and mail it the customer. The current process is a manual control
which requires the processor to select the proper template and manually copy the required information
from cde. They would need to print two copies with any necessary attachments. One to mail out & one
for record. They would need to manually create an air bill for each letter on the FedEx/UPS/USPS
website. Finally, the processor would then have to physically walk the paperwork to the record room to
have the letter recorded in the record room. This entire process takes an average of 2 hours for each
letter generated by the CSR.
This manual process leaves us vulnerable to human error. It’s sometimes difficult to locate these letters
in the record room, in the event of an audit. Keying errors can occur when manually entering all the
required data into the letter template. Templates can also be incorrectly altered while creating a letter,
which could cause errors on that letter, in addition to subsequent letters that would require that same
template. Also, manually creating an air bill for each letter can be very time consuming.
Purpose of this project is to automate the entire process of Confirmation letter generation and its
record management. The project will integrate the cde System with the printer and will enable users to
automatically select the template, attach images (application form etc) and send letters to printer which
will automatically create the air bill for the address on the application form. Current phase will cover
acceptance/confirmation letters only.
This project will save the time, will help in record management and will help ABC Corp in getting rid of
the above mentioned errors/issues. For more on benefits of this project, please refer to next section in
this document.
Efficient tracking of air bills and cost associated All airbills will be stored on company’s finance
with them. folders and team will be able to access them and
use for computation with ease. It will also
provide ability to sort bills based on vendors and
state.
To Reduce the labor cost by 50% over a period Cost should be reduced by over 50% in 2 years
of 2 years
C. High-Level Requirements
High-Level High-Level Requirement Description Priority
Requirement #
csr-irv-01 System needs to allow the processor to High
determine the type of letter template
based upon the application type and state.
D. Assumptions
It will be a user procedure to accept the application.
It will be a user procedure to initiate the process of printing the letters using print option in the
system.
User will verify the information on application.
System will use the information entered on the application for printing.
Admin Team will provide the list of updated zip codes.
HTTP://AKHILENDRA.COM/
E. Constraints
System cannot determine the accuracy of the data entered on the application, it will remain a
manual procedure where it will be manually handled by user.
System cannot handle special characters due to technical limitations therefore alternatives need
to be developed to handle those scenarios.
Project budget cannot exceed $100000 but printer may need software upgrade to support this
project.
System still depends upon the user to select the correct template.
Users need to manually look up the State form to print and attach to the letter when necessary
1. System integration with printer may fail if printer’s software is not upgraded.
2. Project can be used to upgrade the system to handle special character.
3. Incorrect zip code table may result in mailing the letters to wrong address.
4. Overall cost of the project may go up as it involves multiple systems.
5. Timeline may not be met due to integration issue.
Milestone
Task Name START
Date
Project Start 6/21/2018
Evaluation & Solution Recommendations 7/1/2018 7/4/2018
Develop Project Charter 7/2/2018 7/5/2018
Deliverable: Submit Project Charter 7/7/2018
Project Sponsor Reviews Project Charter 7/17/2018 7/19/2018
Project Charter Signed/Approved 7/27/2018 7/29/2018
Create Preliminary Scope Statement 8/6/2018 8/8/2018
Determine Project Team 8/16/2018
Project Team Kickoff Meeting 8/26/2018 8/28/2018
Develop Project Plan 9/5/2018 9/7/2018
Submit Project Plan 9/15/2018 9/17/2018
Milestone: Project Plan Approval 9/25/2018
Project Kickoff Meeting 10/05/2018 10/07/2018
Verify & Validate User/System
10/15/2018 10/17/2018
Requirements
HTTP://AKHILENDRA.COM/
H. Summary budget
I. Stakeholder List