Presentasi GP 2018 - GROUP 1
Presentasi GP 2018 - GROUP 1
GREENSHIP PROFESSIONAL
TRAINING
Platinum Target
NOBLE HOUSE Building
• Halim Nuriza Arakhman
• Riza Subrata
• I G. Oka Sindhu Pribadi
• Maria Petronina Achadiat
• CH. Jabar
Perhitungan lahan yang berlaku adalah gambar site plan dan semua
bangunan yang ada pada site plan dianggap ada.
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
TOTAL POINT DAN INVESTASI ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
RESUME POINT
86 Point
Indoor Health and Energy Efficiency and
PLATINUM
Comfort Conservation
9 Point dari 10 Point 6,57 Tahun 23 Point dari 31 Point
Payback
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - REKAPITULASI POIN ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
Total P P P 12.037.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
Luas hijau non struktur = 870,78 m2 = 13,44 % dari total luas lahan
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
Luas hijau non struktur = 955,19 m2 = 14,74% dari total luas lahan > syarat 10%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
Pemindahan jalan dilakukan agar jalan lebih banyak yang diatas basement dan area hijau
non struktur menjadi lebih besar, sehingga:
- Kesempatan untuk penyerapan air hujan lebih besar
- Sumur resapan yang berjumlah banyak dapat ditampung didalam area hijau non
struktur ini (955,19 m)
- Lebih banyak pohon besar dan perdu yang bisa ditanam sehingga lebih sejuk (lebih
baik untuk micro climate)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
TABEL LUASAN PERUBAHAN PERUNTUKAN LAHAN OPEN SPACE (ON GROUND) AKIBAT PERGESERAN JALAN
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Total P P P -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Jenis Tanaman
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Jenis Tanaman
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - PRASYARAT (Area Dasar Hijau) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Tabel Luas Tajuk Tanaman Landscape Site (area hijau non struktur)
Luas tajuk tanaman dewasa = 983,33 m2 > syarat 50% luas area landscape non struktur 477,60 m2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 1 (Pemilihan Tapak) ASD EEC WAC MRC IHC BEM
Melakukan revitalisasi dan pembangunan di atas lahan yang bernilai negatif dan
1 0 0 -
tidak terpakai karena bekas pembangunan atau dampak negative pembangunan.
Total 2 1 1 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 1 (Pemilihan Tapak) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1b
Menurut RDTR Jakarta Selatan, site NOBLE HOUSE terletak pada zona dengan KLB 6,5 > syarat KLB 3
1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 2 (Aksesibilitas Komunitas) ASD EEC WAC MRC IHC BEM
Membuka akses pejalan kaki selain ke jalan utama di luar tapak yang
1 Point
Total 2 2 2 10.000.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 2 (Aksesibilitas Komunitas) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
Terdapat minimal tujuh jenis fasilitas umum dalam jarak pencapaian jalan utama sejauh 1500 m dari tapak.
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 2 (Aksesibilitas Komunitas) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
FASILITAS APARTEMEN OAKWOOD (Ada 5 jenis Fasum dengan jarak 50m dari NOBLE HOUSE)
APOTEK
HSBC CENTURY
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 2 (Aksesibilitas Komunitas) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
FASILITAS APARTEMEN BELLAGIO (Ada 7 jenis Fasum dengan jarak 60m dari NOBLE HOUSE)
CIMB NIAGA ATM CENTER KLINIK TIRTA TIRTA PHARMACY GUARDIAN FAMILY MART
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 2 (Aksesibilitas Komunitas) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
LAIN-LAIN (Ada 4 jenis Fasum dengan jarak 300-400 m dari NOBLE HOUSE)
SECURE PARKING MASJID JAMI AL ISTIQOMAH MEGA KUNINGAN FOOD COURT MEGA KUNINGAN FUTSAL
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 2 (Aksesibilitas Komunitas) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Membuka akses pejalan kaki selain ke jalan utama di luar tapak yang menghubungkannya dengan jalan sekunder
dan/atau lahan milik orang lain sehingga tersedia akses ke minimal tiga fasilitas umum sejauh 300 m jarak pencapaian
pejalan kaki.
BESAR INVESTASI
1. Pedestrian 10m2 x Rp. 350.000,00/m2 = Rp. 3.500.000,00
2. Biaya bongkar dan perapihan pagar = Rp. 500.000,00
3. Pintu, pagar dan gerbang (2 daun pintu) = Rp. 6.000.000,00
TOTAL = Rp. 10.000.000,00
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 3 (Transportasi Umum) ASD EEC WAC MRC IHC BEM
Total 2 2 2 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 3 (Transportasi Umum) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1a
Adanya halte atau stasiun transportasi umum dalam jangkauan 300 m (walking distance) dari gerbang lokasi
bangunan dengan tidak memperhitungkan panjang jembatan penyeberangan dan ramp (1 poin).
PEDESTRIAN 2
HALTE BUS
BELLAGIO Halte Bus di muka Apartment Bellagio
(Jarak 50 m)
Gerbang PEDESTRIAN 2 hanya berjarak 50 m dari Halte Bus Bellagio
< dari syarat 300 m
1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 3 (Transportasi Umum) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Menyediakan fasilitas jalur pedestrian di dalam area gedung untuk menuju ke stasiun transportasi umum
terdekat yang aman dan nyaman dengan mempertimbangkan Peraturan Menteri Pekerjaan Umum
30/PRT/M/2006 mengenai Pedoman Teknis Fasilitas dan Aksesibilitas pada Bangunan Gedung dan Lingkungan
Lampiran 2B (1 poin).
PEDESTRIAN 2
1
NAIK KE
PEDESTRIAN 2 Point
DARI BASEMENT 1
HALTE BUS
BELLAGIO
(Jarak 50 m)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 4 (Fasilitas Pengguna Sepeda) ASD EEC WAC MRC IHC BEM
Total 2 0 2 55.750.000
NLA = 42.339 m2
Standar pengguna gedung = 10 m2/orang
Jumlah pengguna gedung = 42,339/10 = 4.234 orang
Standar kebutuhan = 1 unit parkir sepeda / 20 pengguna gedung
Jumlah yang dibutuhkan = 4.234/20 = 212 unit parkir sepeda
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 4 (Fasilitas Pengguna Sepeda) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 4 (Fasilitas Pengguna Sepeda) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Apabila tolak ukur 1 diatas terpenuhi, perlu tersedianya shower sebanyak 1 unit untuk setiap 10 parkir sepeda
(1 poin).
BESAR INVESTASI
1. 1 rak untuk 3 unit sepeda = Rp. 360.000,00
Harga/unit = Rp. 120.000,00
Harga 100 unit rak sepeda = Rp. 12.000.000,00
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
Total 3 1 3 3.365.000.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1a
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1a
AREA 2 = 300 m2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1a
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1b
Bila tolak ukur 1a dipenuhi, setiap penambahan 5% area lansekap dari luas total lahan mendapat 1 nilai
Terdapat penambahan 5,05% lebih besar dari yang disyaratkan (sebesar 40%)
Syarat minimal penambahan = 5%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Penggunaan tanaman yang telah dibudayakan secara lokal dalam skala provinsi dengan 60% luas tajuk dewasa
terhadap luas area landscape pada ASD 5 Tolok Ukur 1 (1poin).
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Jenis Tanaman pada Site
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Jenis Tanaman pada Podium (Lantai 5)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Hymenocalis caifolia /
bakung
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Tabel Luas Tajuk Tanaman Roof Garden Podium (Lantai 5)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Jenis Tanaman pada Lantai Atap Tower
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Tabel Luas Tajuk Tanaman Roof Garden (Lantai Atap Tower)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 5 (Lansekap Pada Lahan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Tabel Rekapitulasi Luas Tajuk Tanaman Dewasa
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 6 (Iklim Mikro) ASD EEC WAC MRC IHC BEM
Menggunakan green roof sebesar 50% dari luas atap yang tidak
digunakan untuk mechanical electrical (ME), dihitung dari luas tajuk (1 1 1 1 -
poin).
Total 3 1 3 50.550.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 6 (Iklim Mikro) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1b
Menggunakan green roof sebesar 50% dari luas atap yang tidak digunakan untuk mechanical electrical (ME),
dihitung dari luas tajuk (1 poin).
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 6 (Iklim Mikro) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Menggunakan berbagai material untuk menghindari efek heat island pada area atap gedung sehingga nilai albedo
(daya refleksi panas matahari) minimum 0,3 sesuai dengan perhitungan (1 poin).
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 6 (Iklim Mikro) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Rumus Perhitungan Nilai Albedo Tabel Perhitungan Nilai Albedo (Hardscape di Site di Luar Atap)
Besar Investasi:
Nilai Albedo 576,34 = 0,42
1.388 ASUMSI:
→ 0,42 > 0,30 Nilai Albedo Terpenuhi
1 Point 1. Jalan kendaraan memang sudah memakai
beton
2. Rotunda Drop-Off juga sudah memakai
White PC Concrete Pavement
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 6 (Iklim Mikro) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3a
Desain lansekap berupa vegetasi (softscape) pada sirkulasi utama pejalan kaki menunjukkan adanya pelindung
dari panas akibat radiasi matahari (1 poin).
PEDESTRIAN 2
1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 6 (Iklim Mikro) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3a
Tanaman Rambat:
Passiflora edulis f. edulis Sims/
DETAIL PEDESTRIAN 1 DETAIL PEDESTRIAN 2 Markisa tanpa buah
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 6 (Iklim Mikro) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3a
PERHITUNGAN BIAYA
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
2 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD - 7 (Manajemen Air Limpasan Hujan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
BESAR INVESTASI
Harga Investasi:
18 x Rp. 20.000.000,00 = Rp. 360.000.000,00
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - REKAPITULASI POIN ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT1 (Pemasangan Sub-Meter) ASD EEC WAC MRC IHC BEM
Tujuan
Memantau penggunaan energi sehingga dapat menjadi dasar penerapan manajemen energi yang lebih baik.
Total P P P 533.811.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT1 (Pemasangan Sub-Meter) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT1 (Pemasangan Sub-Meter) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT1 (Pemasangan Sub-Meter) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
Total P P P 16.412.085.520
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
SHGC = 0.81
81% of solar heat
transmitted
VLT = 88
VLR = 8 88% of visible light
8% of visible light transmitted
reflected
Original:
Single glazed clear
Tebal = 8mm
U-Value f= 5.7 W/m2K
SCk (SHGC) = 0.81
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
S7
1. ORIGINAL
Sisi Utara LUAS FASADE SISI UTARA
Luas Dinding Luas Kaca Luas Fasade
Sisi m2 m2 m2
U1 1,208.58 1,208.58
U2 28.80 300.66 329.46
S1 U3 8,614.91 8,614.91
S2
U4 229.19 229.19
TOTAL 1,237.38 9,144.76 10,382.14
S3 S6
S4 S5
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
B7
TOTAL - 246.54 246.54
B1
B2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
S7
Sisi Selatan S2
S3
S4
S1
S2
LUAS FASADE SISI SELATAN
Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
Sisi m2 m2 m2 X Y X Y
S1 6,753.65 6,753.65 1.00 3.80
S2 756.99 756.99 1.00 3.80
S3 545.60 58.94 604.54
S4 619.52 619.52
S5 36.90 36.90
S6 1,304.00 1,304.00
S3
S6 S7 1,751.69 1,751.69 0.85 6.00
S4 S5 TOTAL 545.60 11,281.69 11,827.29
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
Sisi Timur
Sisi Tenggara LUAS FASADE SISI TIMUR
Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
Sisi m2 m2 m2 X Y X Y
T1 186.15 186.15
T2 640.59 640.59
T3 30.02 30.02
T4 2,719.90 2,719.90 1.00 3.80
T5 1,320.38 1,320.38 1.00 6.00
TOTAL - 4,897.04 4,897.04
T4 T5
LUAS FASADE SISI TENGGARA
Luas Dinding Luas Kaca Luas Fasade
Sisi m2 m2 m2
Tg1 94.44 94.44
Tg2 169.99 169.99
T3 TOTAL - 264.43 264.43
T2
T1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
ORIGINAL
PERHITUNGAN SC
Orientasi Utara Barat Selatan Timur Tenggara Barat Daya
SCeff R SCeff R SCeff R SCeff R R SCeff R SCeff SCeff SCeff
Peneduh H 1.00 0.96 1.00 0.26 0.84 1.00 0.26 0.83 0.92 1.00 0.26 0.84 0.96 1.00 1.00
3.80 3.80 3.80
Peneduh V 1.00 1.00 0.17 1.00 0.17 1.00 0.17 1.00 1.00
6.00 6.00 6.00
SCk (SHGC) 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81
SC (SCk x
SCeff) 0.81 0.78 0.68 0.67 0.75 0.68 0.78 0.81 0.81
SF 130.00 243.00 243.00 97.00 97.00 112.00 112.00 97.00 176.00
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
Orientasi Uf Af ΔT Uf x Af x ΔT A Orientasi Qf1 Orientasi Utara 0.81 9,144.76 130.00 962,943.23 10,382.14 92.75 92.75
Utara 5.70 9,144.76 5.00 260,625.66 10,382.14 25.10
Barat B3 0.78 1,609.31 243.00 304,090.07 5,116.44 59.43 124.72
Barat 5.70 4,884.65 5.00 139,212.53 5,116.44 27.21
Selatan 5.70 11,281.69 5.00 321,528.17 11,827.29 27.19 B5 0.68 2,020.35 243.00 334,039.01 5,116.44 65.29
Timur 5.70 4,897.04 5.00 139,565.64 4,897.04 28.50
Tenggara 5.70 264.43 5.00 7,536.26 264.43 28.50 Selatan S1 0.67 6,753.65 97.00 440,426.45 11,827.29 37.24 41.86
Barat Daya 5.70 246.54 5.00 7,026.39 246.54 28.50
S2 0.75 756.99 97.00 54,718.57 11,827.29 4.63
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
Tantangan
- 94% kaca
- Arah bangunan Timur-Barat
- Open space office
- Percobaan penurunan OTTV dengan beberapa
alternatif perubahan fasade.
Alternatif Solusi
- Mengganti original single glazing menjadi double
glazing fasade yg memiliki SCk (SHGC) rendah,
sehingga SC (koefisien peneduh sistem fenestrasi)
jg rendah.
- Mencari jenis kaca dengan U-Value rendah
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
Spesifikasi Material
- Harga kaca Asahimas utk Stopray Smart double glazing
- Penambahan peneduh dgn bahan ACP atau
menggunakan rangka baja dan aluminium utk sunscreen
(grill)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN KONDUKSI KACA Utara 0.35 9,144.76 130.00 416,086.58 10,382.14 40.08 40.08
Orientasi Uf Af ΔT Uf x Af x ΔT A Orientasi Qf1 Orientasi Barat B3 0.34 1,609.31 243.00 131,396.94 5,116.44 25.68 53.89
Utara 4.10 9,144.76 5.00 187,467.58 10,382.14 18.06
Barat B5 0.29 2,020.35 243.00 144,337.84 5,116.44 28.21
4.10 4,884.65 5.00 100,135.33 5,116.44 19.57
Selatan 4.10 11,281.69 5.00 231,274.65 11,827.29 19.55 Selatan S1 0.29 6,753.65 97.00 190,307.73 11,827.29 16.09 18.09
Timur 4.10 4,897.04 5.00 100,389.32 4,897.04 20.50
Tenggara 4.10 264.43 5.00 5,420.82 264.43 20.50 S2 0.32 756.99 97.00 23,643.83 11,827.29 2.00
Barat Daya 4.10 246.54 5.00 5,054.07 246.54 20.50
Timur T4 0.29 2,719.90 112.00 89,560.87 4,897.04 18.29 28.44
PERHITUNGAN OTTV Barat Daya 0.35 246.54 176.00 15,186.86 246.54 61.60 61.60
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
VLR = 5
5% of visible light PERHITUNGAN KONDUKSI DINDING
reflected VLT = 42
Orientasi α Uw Aw Tdek α x Uw x Aw x Tdek A Orientasi Qw Orientasi
42% of visible light
0.86x0.21
transmitted Utara 0.18 0.52 1,237.38 10.00 1,158.19 10,382.14 0.11
Design 2: Barat 0.18 0.52 231.79 10.00 216.96 5,116.44 0.04
Single glazed Selatan 0.18 0.52 545.60 10.00 510.68 11,827.29 0.04
Tebal = 8mm Timur 0.18 0.52 - 10.00 - 4,897.04 -
Tenggara 0.18 0.52 - 10.00 - 264.43 -
U-Value f= 4.1 W/m2K
Barat Daya 0.18 0.52 - 10.00 - 246.54 -
SCk (SHGC) = 0.35
Alasan Peneduh di Barat, krn untuk mengurangi sinar Barat
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
Horizontal Sunscreen
Vertical Sunscreen
Penambahan lebar horizontal dan
vertical Sunscreen dari 1 m menjadi 1,5 m,
dengan material grill/frame dari baja dan
dibungkus ACP
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN OTTV Barat Daya 0.35 246.54 176.00 15,186.86 246.54 61.60 61.60
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 3: SUNERGY BLUE GREEN + STOPRAY SMART (Double Glazing) di Barat, Timur, Selatan, Barat Daya + Penambahan Lebar
Peneduh di Barat
PERHITUNGAN SC
Orientasi Utara Barat Selatan Timur Tenggara Barat Daya
SCeff R Sceff R Sceff R SCeff R R SCeff R SCeff SCeff SCeff
U-Value = Peneduh H 1.00 0.95 1.50 0.39 0.77 1.00 0.26 0.83 0.92 1.00 0.26 0.84 0.96 1.00 1.00
3.80 3.80 3.80
1.6 W/m2K Peneduh V 1.00 1.50 0.25 1.00 0.17 1.00 0.17 1.00 1.00
6.00 6.00 6.00
SCk (SHGC) 0.35 0.21 0.21 0.35 0.35 0.21 0.21 0.35 0.21
SC (SCk x
SCeff) 0.35 0.20 0.16 0.29 0.32 0.18 0.20 0.35 0.21
SHGC = 0.21 SF 130.00 243.00 243.00 97.00 97.00 112.00 112.00 97.00 176.00
Tebal = 8mm Alasan Peneduh di Barat, krn untuk mengurangi sinar Barat, dan penggantian Stopray Smart di sisi
U-Value f= 1.6 W/m2K Barat, Timur, Selatan, Barat Daya, agar mengurangi panas di sebagian besar sisi bangunan (tdk
SCk (SHGC) = 0.21 keseluruhan)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 4: SUNERGY BLUE GREEN + STOPRAY SMART (Double Glazing) di Barat, Timur, Selatan, Barat Daya + Penambahan Lebar
Peneduh di Barat + PARAPET Barat, Timur, Selatan
SHGC = 0.35
SHGC = 0.21 35% of solar heat
21% of solar heat transmitted
transmitted
VLT = 29 VLR = 5
VLR = 28 29% of visible light 5% of visible light
28% of visible transmitted reflected VLT = 42
light reflected
Design 4: 42% of visible light
Barat, Timur, Selatan, Barat Daya: transmitted
ASAHIMAS Stopray - Double glazing Utara, Tenggara:
clear (low-e, air, clear) ASAHIMAS Sunergy - Single glazed
Alasan Peneduh di Barat, krn untuk mengurangi sinar Barat, dan penggantian
Stopray Smart di sisi Barat, Timur, Selatan, Barat Daya, agar mengurangi panas
Tebal = 8mm Tebal = 8mm
di sebagian besar sisi bangunan (tdk keseluruhan), dan Parapet di sisi Barat, U-Value f= 1.6 W/m2K U-Value f= 4.1 W/m2K
Timur, Selatan (tdk keseluruhan), agar bentuk bangunan lebih dinamis SCk (SHGC) = 0.21 SCk (SHGC) = 0.35
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 4: SUNERGY BLUE GREEN + STOPRAY SMART (Double Glazing) di Barat, Timur, Selatan, Barat Daya + Penambahan Lebar
Peneduh di Barat + PARAPET Barat, Timur, Selatan
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 4: SUNERGY BLUE GREEN + STOPRAY SMART (Double Glazing) di Barat, Timur, Selatan, Barat Daya + Penambahan Lebar
Peneduh di Barat + PARAPET Barat, Timur, Selatan
LUAS FASADE SISI UTARA LUAS FASADE SISI SELATAN
Luas Dinding Luas Kaca Luas Fasade Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
Sisi m2 m2 m2 Sisi m2 m2 m2 X Y X Y
U1 1,208.58 1,208.58 S1 2,026.10 4,727.56 6,753.65 1.00 3.80
U2 28.80 300.66 329.46 S2 756.99 756.99 1.00 3.80
U3 8,614.91 8,614.91 S3 545.60 58.94 604.54
U4 229.19 229.19 S4 619.52 619.52
TOTAL 1,237.38 9,144.76 10,382.14 S5 36.90 36.90
S6 1,304.00 1,304.00
S7 1,751.69 1,751.69 0.85 6.00
TOTAL 2,571.70 9,255.60 11,827.29
LUAS FASADE SISI BARAT
Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
LUAS FASADE SISI TIMUR
Sisi m2 m2 m2 X Y X Y
B1 231.79 231.79 Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
B2 281.40 281.40 Sisi m2 m2 m2 X Y X Y
B3 482.79 1,126.52 1,609.31 1.50 6.00 T1 186.15 186.15
B4 245.07 571.83 816.90 T2 640.59 640.59
B5 606.11 1,414.25 2,020.35 1.50 3.80 T3 30.02 30.02
B6 89.52 89.52 T4 815.97 1,903.93 2,719.90 1.00 3.80
67.17 67.17 T5 396.11 924.27 1,320.38 1.00 6.00
TOTAL 1,565.76 3,550.68 5,116.44 TOTAL 1,212.08 3,684.96 4,897.04
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 5: STOPRAY SMART (Double Glazing) di Semua Sisi + Penambahan Lebar Peneduh di Barat + PARAPET Barat, Timur, Selatan
U-Value =
1.6 W/m2K Design 5:
Barat, Timur, Selatan, Barat Daya, Utara,
Tenggara:
ASAHIMAS Stopray - Double glazing clear (low-
SHGC = 0.21 e, air, clear)
21% of solar heat
Tebal = 8mm
transmitted
U-Value f= 1.6 W/m2K
VLT = 29 SCk (SHGC) = 0.21
VLR = 28 29% of visible light
28% of visible transmitted Alasan Peneduh di Barat, krn untuk mengurangi sinar Barat, dan penggantian Stopray
light reflected
Smart di semua sisi agar mengurangi panas di semua sisi bangunan, dan Parapet di sisi
Barat, Timur, Selatan (tdk keseluruhan), agar bentuk bangunan lebih dinamis
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 5: STOPRAY SMART (Double Glazing) di Semua Sisi + Penambahan Lebar Peneduh di Barat + PARAPET Barat, Timur, Selatan
Luas Dinding Luas Kaca Luas Fasade Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
Sisi m2 m2 m2 Sisi m2 m2 m2 X Y X Y
U1 1,208.58 1,208.58 S1 2,026.10 4,727.56 6,753.65 1.00 3.80
U2 28.80 300.66 329.46 S2 756.99 756.99 1.00 3.80
U3 8,614.91 8,614.91 S3 545.60 58.94 604.54
U4 229.19 229.19 S4 619.52 619.52
TOTAL 1,237.38 9,144.76 10,382.14 S5 36.90 36.90
S6 1,304.00 1,304.00
S7 1,751.69 1,751.69 0.85 6.00
TOTAL 2,571.70 9,255.60 11,827.29
LUAS FASADE SISI BARAT
Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
Sisi m2 m2 m2 X Y X Y
LUAS FASADE SISI TIMUR
B1 231.79 231.79 Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
B2 281.40 281.40 Sisi m2 m2 m2 X Y X Y
B3 482.79 1,126.52 1,609.31 1.50 6.00 T1 186.15 186.15
B4 245.07 571.83 816.90 T2 640.59 640.59
B5 606.11 1,414.25 2,020.35 1.50 3.80 T3 30.02 30.02
B6 89.52 89.52 T4 815.97 1,903.93 2,719.90 1.00 3.80
67.17 67.17 T5 396.11 924.27 1,320.38 1.00 6.00
TOTAL 1,565.76 3,550.68 5,116.44 TOTAL 1,212.08 3,684.96 4,897.04
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 6: STOPRAY VISION (Double Glazing) di Semua Sisi + PARAPET Barat, Timur, Selatan
U-Value =
1.5 W/m2K
SHGC = 0.27
27% of solar heat
transmitted
VLT = 49
VLR = 19 49% of visible light
19% of visible transmitted Design 6:
light reflected
Barat, Timur, Selatan, Barat Daya, Utara, Tenggara:
ASAHIMAS Vision - Double glazing clear (low-e, air, clear)
Tebal = 8mm Alasan Peneduh di Barat, krn untuk mengurangi sinar Barat, dan penggantian
U-Value f= 1.5 W/m K2 Stopray Vision di semua sisi agar mengurangi panas di semua sisi bangunan,
dan Parapet di sisi Barat, Timur, Selatan (tdk keseluruhan), agar bentuk
SCk (SHGC) = 0.27 bangunan lebih dinamis
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
DESIGN 6: STOPRAY VISION (Double Glazing) di Semua Sisi + PARAPET Barat, Timur, Selatan
LUAS FASADE SISI UTARA LUAS FASADE SISI SELATAN
Luas Dinding Luas Kaca Luas Fasade Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
Sisi m2 m2 m2 Sisi m2 m2 m2 X Y X Y
U1 1,208.58 1,208.58 S1 2,026.10 4,727.56 6,753.65 1.00 3.80
U2 28.80 300.66 329.46 S2 756.99 756.99 1.00 3.80
U3 8,614.91 8,614.91 S3 545.60 58.94 604.54
U4 229.19 229.19 S4 619.52 619.52
TOTAL 1,237.38 9,144.76 10,382.14 S5 36.90 36.90
S6 1,304.00 1,304.00
LUAS FASADE SISI BARAT S7 1,751.69 1,751.69 0.85 6.00
TOTAL 2,571.70 9,255.60 11,827.29
Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
Sisi m2 m2 m2 X Y X Y
B1 231.79 231.79 LUAS FASADE SISI TIMUR
B2 281.40 281.40
Luas Dinding Luas Kaca Luas Fasade Sirip H Sirip V
B3 482.79 1,126.52 1,609.31 1.50 6.00
Sisi m2 m2 m2 X Y X Y
B4 245.07 571.83 816.90
T1 186.15 186.15
B5 606.11 1,414.25 2,020.35 1.50 3.80
T2 640.59 640.59
B6 89.52 89.52
T3 30.02 30.02
67.17 67.17
T4 815.97 1,903.93 2,719.90 1.00 3.80
TOTAL 1,565.76 3,550.68 5,116.44
T5 396.11 924.27 1,320.38 1.00 6.00
TOTAL 1,212.08 3,684.96 4,897.04
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN KONDUKSI KACA Utara 0.27 9,144.76 130.00 320,981.08 10,382.14 30.92 30.92
Orientasi Uf Af ΔT Uf x Af x ΔT A Orientasi Qf1 Orientasi Barat B3 0.26 1,126.52 243.00 70,215.24 5,116.44 13.72 27.69
Utara 1.50 9,144.76 5.00 68,585.70 10,382.14 6.61
B5 0.21 1,414.25 243.00 71,447.23 5,116.44 13.96
Barat 1.50 3,550.68 5.00 26,630.12 5,116.44 5.20
Selatan 1.50 9,255.60 5.00 69,416.96 11,827.29 5.87 Selatan S1 0.22 4,727.56 97.00 102,766.17 11,827.29 8.69 10.23
Timur 1.50 3,684.96 5.00 27,637.17 4,897.04 5.64
Tenggara 1.50 264.43 5.00 1,983.23 264.43 7.50 S2 0.25 756.99 97.00 18,239.52 11,827.29 1.54
Barat Daya 1.50 246.54 5.00 1,849.05 246.54 7.50
Timur T4 0.23 1,903.93 112.00 48,362.87 4,897.04 9.88 15.36
PERHITUNGAN OTTV Barat Daya 0.27 246.54 176.00 11,715.58 246.54 47.52 47.52
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
N
Spesifikasi Kaca Tebal SHGC SC U-Value VLT VLR OTTV Spesifikasi Fasade
o
I Original
Asahimas-Indoflot Clear Original, horizontal dan vertical dan horizontal Sunscreen di Barat,
(single glazing) 8 mm 81 0.93 5.7 88 8 102.39 Selatan, Timur
II Designed
Asahimas-Sunergy Blue Kaca Sunergy dng vertical dan horizontal Sunscreen di Barat, Selatan,
1 Green SNBN 8 mm 35 0.41 4.1 42 5 51.96 Timur
Asahimas-Sunergy Blue Kaca Sunergy, penambahan lebar vertical dan horizontal sunscreen di
2 Green SNBN 8 mm 35 0.41 4.1 42 5 51.55 Barat
Asahimas-Stopray Smart Kaca Sunergy dan Stopray di Barat, Timur, Selatan, Barat Daya, vertical
3 30/20 (double glazing) 8 mm 21 0.24 1.6 29 28 42.63 dan horizontal sunscreen di Barat
Asahimas-Sunergy Blue
Green SNBN 8 mm 35 0.41 4.1 42 5
Asahimas-Stopray Smart Kaca Sunergy dan Stopray di Barat, Timur, Selatan, Barat Daya, vertical
4 30/20 (double glazing) 8 mm 21 0.24 1.6 29 28 31.46 dan horizontal sunscreen di Barat + parapet Barat, Selatan, Timur
Asahimas-Sunergy Blue
Green SNBN 8 mm 35 0.41 4.1 42 5
Asahimas-Stopray Smart Kaca Stopray Smart di seluruh fasade, vertical dan horizontal sunscreen
5 30/20 (double glazing) 8 mm 21 0.24 1.6 29 28 22.68 Barat + parapet Barat, Selatan, Timur
Asahimas-Stopray Vision Kaca Stopray Vision di seluruh fasade, vertical dan horizontal sunscreen
6 (double glazing) 8 mm 27 0.31 1.5 49 19 26.88 Barat + parapet Barat, Selatan, Timur
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN INVESTASI
Barat 67,798,500.00
275,000.00 Tenggara - 264.43 264.43 520,000.00 137,503,600.00
Daya - 246.54 246.54
0.06 0.94
TOTAL 2,014.77 30,719.11 32,733.88 15,973,937,200.00
WWR = 94%
0.06 0.94
WWR = 94%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN INVESTASI
Luas Dinding Luas Kaca Luas Fasade Harga Kaca /m2 Harga
Luas Total Harga Total Biaya
Total Biaya (Kaca) Peneduh
Orientasi Peneduh Peneduh Keseluruhan
Sunergy Blue Green (Rp) /m2
m2 m2 m2 (m2) (Rp) (Rp)
(Rp) (Rp)
Utara 1,237.38 9,144.76 10,382.14 520,000.00 4,755,275,200.00 4,755,275,200.00
Barat 231.79 4,884.65 5,116.44 520,000.00 2,540,018,000.00 675,000.00 1095 739,125,000.00 3,279,143,000.00
0.06 0.94
WWR = 94%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN INVESTASI
DESIGN 3: SUNERGY BLUE GREEN + STOPRAY SMART (Double Glazing) di Barat, Timur, Barat Daya + PENAMBAHAN LEBAR
PENEDUH BARAT
Luas Dinding Luas Kaca Luas Fasade Harga Kaca /m2 Harga Kaca/m2 Harga Total Harga Total Biaya
Total Biaya (Kaca) Luas Peneduh
Orientasi Sunergy Blue Green Stopray Smart Peneduh /m2 Peneduh Keseluruhan
m2 m2 m2 (Rp) (m2)
(Rp) (Rp) (Rp) (Rp) (Rp)
0.06 0.94
WWR = 94%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN INVESTASI
DESIGN 4: SUNERGY BLUE GREEN + STOPRAY SMART (Double Glazing) di Barat, Timur, Selatan, Barat Daya + PARAPET Barat, Timur,
Selatan + PENAMBAHAN LEBAR PENEDUH BARAT
Luas Dinding Luas Kaca Luas Fasade Harga Kaca /m2 Harga Kaca /m2 Harga Total Biaya Harga Total Harga Total Biaya
Total Biaya (Kaca) Luas Peneduh
Orientasi Parapet/m2 Parapet Peneduh /m2 Peneduh Keseluruhan
Sunergy Blue Green Stopray Smart (Rp) (m2)
m2 m2 m2 (Rp) (Rp) (Rp) (Rp) (Rp)
(Rp) (Rp)
Utara 1,237.38 9,144.76 10,382.14 520,000.00 4,755,275,200.00 4,755,275,200.00
Barat 1,565.76 3,550.68 5,116.44 900,000.00 3,195,613,800.00 110,000.00 172,233,380.00 675,000.00 1095 739,125,000.00 4,106,972,180.00
0.20 0.80
WWR 80%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN INVESTASI
DESIGN 5: STOPRAY SMART (Double Glazing) di Semua Sisi + PARAPET Barat, Timur, Selatan + PENAMBAHAN LEBAR
PENEDUH BARAT
Luas Dinding Luas Kaca Luas Fasade Harga Kaca /m2 Harga Total Biaya Harga Peneduh Total Harga Total Biaya
Total Biaya (Kaca) Luas Peneduh
Orientasi Parapet/m2 Parapet /m2 Peneduh Keseluruhan
Stopray Smart (Rp) (m2)
m2 m2 m2 (Rp) (Rp) (Rp) (Rp) (Rp)
(Rp)
Utara 1,237.38 9,144.76 10,382.14 900,000.00 8,230,284,000.00 8,230,284,000.00
Barat 1,565.76 3,550.68 5,116.44 900,000.00 3,195,613,800.00 110,000.00 172,233,380.00 675,000.00 1095 739,125,000.00 4,106,972,180.00
0.20 0.80
WWR 80%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
PERHITUNGAN INVESTASI
DESIGN 6: STOPRAY VISION (Double Glazing) di Semua Sisi + PARAPET Barat, Timur, Selatan + PENAMBAHAN LEBAR
PENEDUH BARAT
Luas Dinding Luas Kaca Luas Fasade Harga Kaca /m2
Harga Parapet Total Biaya Harga Peneduh Total Harga Total Biaya
Total Biaya (Kaca) Luas Peneduh
Orientasi Stopray Vision /m2 Parapet /m2 Peneduh Keseluruhan
(Rp) (m2)
m2 m2 m2 (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
Barat 1,565.76 3,550.68 5,116.44 900,000.00 3,195,613,800.00 110,000.00 172,233,380.00 675,000.00 1095 739,125,000.00 4,106,972,180.00
0.20 0.80
WWR 80%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - PRASYARAT2 (Perhitungan OTTV) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Tujuan
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Tujuan
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Tujuan
TOTAL 20 20 10 13 4.772.908.690
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Building Data
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Building Data
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Building Data
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
RTTV
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
RTTV
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
Building Envelope
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
PEOPLE / OCCUPANT
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
PEOPLE / OCCUPANT
Cooling Load
FRESH AIR / VENTILATION
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
FRESH AIR / VENTILATION
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
LIGHTING SYSTEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
LIGHTING SYSTEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
LIGHTING SYSTEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
LIGHTING SYSTEM
4.01 W/m2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
LIGHTING SYSTEM
Design
Baseline
Ballast Electronic
3x7.5W LED T5
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Media control
Lux, present sensor Skema natural lighting mengontrol lampu
A. Lampu 24 off, 29 on
B. Lampu 16 off, 24 on
C. Lampu 38 off, 25 on
Area lampu
Yang dikontrol
E. Lampu 16 off, 24 on F. Lampu 30 off, 16 on Design OTTV Kaca Transmit = 29% dan Reflek 28%
D. Lampu 27 off, 28 on Data pendukung ada difolder lampiran 2d Lighting
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
A. Lampu 24 off, 29 on LIGHTING SYSTEM
B. Lampu 16 off, 24 on
C. Lampu 38 off, 25 on
Baseline 35W/m2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
A. Lampu 13 off, 40 on LIGHTING SYSTEM
B. Lampu 8 off, 32 on
C. Lampu 20 off, 43 on
Design OTTV 3 22.68W/m2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
Cooling Load
PLUG LOAD
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
AIR DISTRIBUTION
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 1 (Langkah Penghematan Energi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 2 (Pencahayaan Alami) ASD EEC WAC MRC IHC BEM
Tujuan
Mendorong penggunaan pencahayaan alami yang optimal untuk mengurangi konsumsi energi dan mendukung desain bangunan yang memungkinkan
pencahayaan alami semaksimal mungkin.
Penggunaan cahaya alami secara optimal sehingga minimal 30% luas lantai
yang digunakan untuk bekerja mendapatkan intensitas cahaya alami minimal
sebesar 300 lux. Perhitungan dapat dilakukan dengan cara manual atau
1 2 2 1.458.000.000
dengan software.
Khusus untuk pusat perbelanjaan, minimal 20% luas lantai nonservice
4 4
mendapatkan intensitas cahaya alami minimal sebesar 300 lux
Jika butir satu dipenuhi lalu ditambah dengan adanya lux sensor untuk
2 otomatisasi pencahayaan buatan apabila intensitas cahaya alami kurang dari 2 2
300 lux didapatkan tambahan 2 nilai
TOTAL 4 4 4 4 1.458.000.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 2 (Pencahayaan Alami) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 2 (Pencahayaan Alami) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 2 (Pencahayaan Alami) ASD EEC WAC MRC IHC BEM
Area lampu
Yang dikontrol
E. Lampu 16 off, 24 on F. Lampu 30 off, 16 on Design OTTV Kaca Transmit = 29% dan Reflek 28%
D. Lampu 27 off, 28 on Data pendukung ada difolder lampiran 2d Lighting
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 3 (Ventilasi) ASD EEC WAC MRC IHC BEM
Tujuan
Mendorong penggunaan ventilasi yang efisien di area publik (non nett lettable area) untuk mengurangi konsumsi energi.
TOTAL 1 1 0 0 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 3 (Ventilasi) ASD EEC WAC MRC IHC BEM
Lantai Dasar
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 3 (Ventilasi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 3 (Ventilasi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 3 (Ventilasi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 4 (Pengaruh Perubahan Iklim) ASD EEC WAC MRC IHC BEM
Tujuan
Memberikan pemahaman bahwa pola konsumsi energi yang berlebihan akan berpengaruh terhadap perubahan iklim.
TOTAL 1 1 1 1 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 4 (Pengaruh Perubahan Iklim) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 5 (Energi Terbarukan Dalam Tapak) ASD EEC WAC MRC IHC BEM
Tujuan
Mendorong penggunaan sumber energi baru dan terbarukan yang bersumber dari dalam lokasi tapak bangunan.
TOTAL 5 5 0 5 924.000.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 5 (Energi Terbarukan Dalam Tapak) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 5 (Energi Terbarukan Dalam Tapak) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 5 (Energi Terbarukan Dalam Tapak) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
EEC - 5 (Energi Terbarukan Dalam Tapak) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD EEC WAC MRC IHC BEM
Water Conservation
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - REKAPITULASI POIN ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT1 (Meteran Air) ASD EEC WAC MRC IHC BEM
Total P P P -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT1 (Meteran Air) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT1 (Meteran Air) ASD EEC WAC MRC IHC BEM
M2
Closet
Rainwater
Used water
M4
Siram
Taman M5 Saluran
Overflow
Kota
Sumur Tangki Clean Water Sewage Treatment Plant
resapan Penampungan Tank (CWT) Grey Water
Sewage Treatment Plant
Air Hujan Black Water
Make up
water
M1 Row Water
PDAM
Tank (RWT) Sumpit Sewage Pit
Basement Basement
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
Total P P P -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
NB : Persentase Jenis diambil dari data persentase unit pada table STATUS SANITARY
JUMLAH UNIT 8
perhitungan sanitary fixture JUMLAH KELOMPOK 8
PERSENTASE UNIT 100%
PERSENTASE KELOMPOK 3%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
Asumsi Air WC flush tank (L/hari) 33024,29 18163,36 100% 14860,93 Lantai 12
Lantai 13
1
1
7
7
Lantai 14 1 7
% Jumlah Flush Valve 3% Lantai 15 1 7
Lantai 16 1 7
Persentase WC yang disiram dengan air daur ulang/ air alternatif Lantai 26
Lantai 27
1
1
7
7
Lantai 28 1 7
33,42% Lantai 29 1 7
Lantai 30 1 7
Jenis air yang digunakan : make up water Lantai 31 1 7
Lantai 32 1 7
Total Air untuk WC (L/hari) 33024,29 19455,21 100% 13569,08 STATUS SANITARY
JUMLAH UNIT 29 214
JUMLAH KELOMPOK 243
PERSENTASE UNIT 11,93% 88,07%
PERSENTASE KELOMPOK 96,81%
KELUARAN AIR :
STATUS SANITARY
Persentase Keran 66,58% JUMLAH UNIT
JUMLAH KELOMPOK
29
243
214
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
KELUARAN AIR :
STANDART 4 4
STATUS SANITARY
Jumalah Total 16935,53259 10584,70787 JUMLAH UNIT
JUMLAH KELOMPOK
8
132
124
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
KELUARAN AIR :
STANDART 8 8
Keran Tembok (diluar keran wudhu) L/menit L/menit (%) (L/hari) LANTAI
Basement 4 3
Basement 3
Basement 2
T30ARQ13N 8 7 55% Basement
Ground
1
Lantai 3
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
KELUARAN AIR :
STANDART 8 8
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
KERAN
KELOMPOK SANITARY
KHUSUS
KELUARAN AIR :
STANDART 8
Lantai 3
Lantai 4
Lantai 5
Lantai 6 2
Lantai 7 2
Lantai 8 2
Lantai 9 2
Lantai 10 2
Lantai 11 2
Lantai 12 2
Lantai 13 2
Lantai 14 2
Total air untuk Keran Wudhu (L/hari) 16935,53259 14818,59102 100% 2116,941574 Lantai 15
Lantai 16
2
2
Lantai 17 2
STATUS SANITARY
JUMLAH UNIT 54
JUMLAH KELOMPOK 54
PERSENTASE UNIT 100,00%
PERSENTASE KELOMPOK 100,00%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
STATUS SANITARY
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
Cooling Tower
Apakah menggunakan make up water untuk cooling tower?
Persentase kebutuhan cooling tower yang difasilitasi air selain sumber utama 65,00%
Total air dari cooling tower yang menggunakan sumber air utama terhadap total penghuni (L/hari.orang) 5,25
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
Persentase kebutuhan lansekap yang difasilitasi air selain sumber utama 100%
Total air dari lansekap yang menggunakan sumber air utama terhadap total penghuni (L/hari.orang) 0
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - PRASYARAT2 (Perhitungan Penggunaan Air) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 1 (Pengurangan Penggunaan Air) ASD EEC WAC MRC IHC BEM
Total 8 6 8 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 1 (Pengurangan Penggunaan Air) ASD EEC WAC MRC IHC BEM
30,51%
PERSENTASE KONSUMSI DARI BASELINE
Satuan
Standar
100%
Makin
Besar
Reduksinya
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 2 (Fitur Air) ASD EEC WAC MRC IHC BEM
Total 8 6 8 1.912.749.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 2 (Fitur Air) ASD EEC WAC MRC IHC BEM
WC FLUSH KERAN
KELOMPOK SANITARY WC FLUSH TANK PETURASAN KERAN TEMBOK KERAN WESTAFEL SHOWER
VALVE KHUSUS
KELUARAN AIR :
STANDART 6 6 6 4 4 8 8 8 8 8 8
DESIGN 6 3,3 3,3 2,5 2,5 7 7 5 7 7 6
TYPE CE9/TV150NW CW660NJ/ UW447 T30ARQ T23B13V7 T23BQ13 TX465SM
CW823NJ U57M TX115LRS T205M
V12J SW660J JNM 13N NB N Z
TABEL LANTAI
Basement 4
Basement 3
2
2
2
2
3 2
2
Basement 2 2 2 2
Basement 1 2 2 2 10
Ground 1 10 4 7 1
PERHITUNGAN Lantai 3
Lantai 4
4
4
4
4
2
2
Lantai 5 1 7 4 3 7 1
Lantai 6 1 7 4 1 1 7 2 1
Lantai 7 1 7 4 1 1 7 2 1
WATER Lantai 8
Lantai 9
Lantai 10
1
1
1
7
7
7
4
4
4
1
1
1
1
1
1
7
7
7
2
2
2
1
1
1
Lantai 11 1 7 4 1 1 7 2 1
Lantai 12 1 7 4 1 1 7 2 1
Lantai 13 1 7 4 1 1 7 2 1
FIXTURE Lantai 14
Lantai 15
Lantai 16
1
1
1
7
7
7
4
4
4
1
1
1
1
1
1
7
7
7
2
2
2
1
1
1
Lantai 17 1 7 4 1 1 7 2 1
Lantai 18 1 7 4 1 1 7 2 1
Lantai 19 1 7 4 1 1 7 2 1
Lantai 20 1 7 4 1 1 7 2 1
Lantai 21 1 7 4 1 1 7 2 1
Lantai 22 1 7 4 1 1 7 2 1
Lantai 23 1 7 4 1 1 7 2 1
Lantai 24 1 7 4 1 1 7 2 1
Lantai 25 1 7 4 1 1 7 2 1
Lantai 26 1 7 4 1 1 7 2 1
Lantai 27 1 7 4 1 1 7 2 1
Lantai 28
Lantai 29
NOBLE HOUSE Building 1
1
7
7
GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
4
4
1
1
1
1
7
7
2
2
1
1
Basement 1 2 2 2 10
Ground 1 10 4 7 1
Lantai 3 4 4 2
WAC - 2 (Fitur Air)
Lantai 4
Lantai 5 1
4
7
4
4 3
ASD EEC WAC
2
7
MRC IHC BEM
1
Lantai 6 1 7 4 1 1 7 2 1
Lantai 7 1 7 4 1 1 7 2 1
Lantai 8 1 7 4 1 1 7 2 1
Lantai 9 1 7 4 1 1 7 2 1
Lantai 10 1 7 4 1 1 7 2 1
Lantai 11 1 7 4 1 1 7 2 1
Lantai 12 1 7 4 1 1 7 2 1
Lantai 13 1 7 4 1 1 7 2 1
Lantai 14 1 7 4 1 1 7 2 1
Lantai 15 1 7 4 1 1 7 2 1
TABEL
Lantai 16 1 7 4 1 1 7 2 1
Lanjutan
Lantai 17 1 7 4 1 1 7 2 1
Lantai 18 1 7 4 1 1 7 2 1
Lantai 19 1 7 4 1 1 7 2 1
Lantai 20 1 7 4 1 1 7 2 1
Lantai 21 1 7 4 1 1 7 2 1
PERHITUNGAN Lantai 22
Lantai 23
1
1
7
7
4
4
1
1
1
1
7
7
2
2
1
1
Lantai 24 1 7 4 1 1 7 2 1
Lantai 25 1 7 4 1 1 7 2 1
Lantai 26 1 7 4 1 1 7 2 1
Lantai 27 1 7 4 1 1 7 2 1
WATER Lantai 28
Lantai 29
1
1
7
7
4
4
1
1
1
1
7
7
2
2
1
1
Lantai 30 1 7 4 1 1 7 2 1
Lantai 31 1 7 4 1 1 7 2 1
Lantai 32 1 7 4 1 1 7 2 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 2 (Fitur Air) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 2 (Fitur Air) ASD EEC WAC MRC IHC BEM
WC Flush Tank L/flush L/flush (%) (L/hari) Asumsi air keran tembok (L/hari) 12701,65 11113,94 100% 1587,71
CW823NJ 6 3,3 12%
CW 660 J / SW 660 J 6 3,3 88% Keran Wastafel L/menit L/menit (%) (L/hari)
TX115LRS 8 5 96%
T205M 8 7 4%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 2 (Fitur Air) ASD EEC WAC MRC IHC BEM
Total air untuk Keran Wudhu (L/hari) 16935,53 14818,59 100% 2116,94
PENGGUNAAN WATER
66,96%
2 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 3 (Daur Ulang Air) ASD EEC WAC MRC IHC BEM
Total 3 0 0 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 3 (Daur Ulang Air) ASD EEC WAC MRC IHC BEM
M2
Closet
Rainwater
Used water
M4
Siram
Taman M5 Saluran
Overflow
Kota
Sumur Tangki Water Clean Water Sewage Treatment Plant
resapan Penampungan Treatment Tank (CWT) Grey Water
Sewage Treatment Plant
Air Hujan Black Water
Make up
water
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 3 (Daur Ulang Air) ASD EEC WAC MRC IHC BEM
Cooling Tower
Apakah menggunakan mak e up water untuk cooling tower ?
Persentase kebutuhan cooling tower yang difasilitasi air selain sumber utama 65,00%
Total air dari cooling tower yang menggunakan sumber air utama terhadap total penghuni (L/hari.orang) 5,41
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 4 (Sumber Air Alternatif) ASD EEC WAC MRC IHC BEM
Menggunakan lebih dari satu sumber air dari ketiga alternatif diatas 2 2 2 -
Total 2 6 8 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 4 (Sumber Air Alternatif) ASD EEC WAC MRC IHC BEM
WATER RECYCLING
Clean Water
Roof Drain Roof Tank
M2
Rainwater
To Unit
Overflow
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 4 (Sumber Air Alternatif) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 4 (Sumber Air Alternatif) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 5 (Penampungan Air Hujan) ASD EEC WAC MRC IHC BEM
Total 3 0 3 1.935.000.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 5 (Penampungan Air Hujan) ASD EEC WAC MRC IHC BEM
Rainwater Harvesting
Kapasitas tanki yang direncanakan 105000 Liter
Curah Hujan (I) 50 mm
0,95
Koefisien Limpasan (C)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 5 (Penampungan Air Hujan) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 5 (Penampungan Air Hujan) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 6 (Efisiensi Penggunaan Air Lansekap) ASD EEC WAC MRC IHC BEM
Total 2 0 0 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
WAC - 6 (Efisiensi Penggunaan Air Lansekap) ASD EEC WAC MRC IHC BEM
M2
Closet
Rainwater
Used water
M4
Siram
Taman M5 Saluran
Overflow
Kota
Sumur Tangki Clean Water Sewage Treatment Plant
resapan Penampungan Tank (CWT) Grey Water
Sewage Treatment Plant
Air Hujan Black Water
Make up
water
M1 Row Water
PDAM
Tank (RWT) Sumpit Sewage Pit
Basement Basement
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - REKAPITULASI POIN ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - PRASYARAT (Refrigeran Fundamental) ASD EEC WAC MRC IHC BEM
Total P P P -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - PRASYARAT (Refrigeran Fundamental) ASD EEC WAC MRC IHC BEM
Impact to Ozone
MRC - 3
Tidak menggunakan bahan perusak
ozon /ODP = 0 pada sistem pendinginan 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - PRASYARAT (Refrigeran Fundamental) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - ASSUMPTION ASD EEC WAC MRC IHC BEM
GFA : 84.743
No Uraian Kuantitas Satuan Harga Satuan Jumlah Harga
I Total Biaya Owner 84.743 m2 8.000.000 677.945.235.616
a Biaya Perencanaan (Konsultan) 84.743 m2 80.000 (6.779.452.356)
b MK 36 Bulan 200.000.000 (7.200.000.000)
c Perizinan 1 Ls 10.000.000.000 (10.000.000.000)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 1 (Penggunaan Gedung dan Material Bekas) ASD EEC WAC MRC IHC BEM
“Menggunakan material bekas bangunan lama dan/atau dari tempat lain untuk
mengurangi penggunaan bahan mentah yang baru, sehingga dapat mengurangi limbah
pada pembuangan akhir serta memperpanjang usia pemakaian suatu bahan material”
Total 2 0 0 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 1 (Penggunaan Gedung dan Material Bekas) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
“Mengurangi jejak ekologi dari proses ekstraksi bahan mentah dan proses
produksi material”
Total 3 2 2 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
August, 10 2019
2023
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
2023
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
ISO 14001:2015
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
2021
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
A STRUKTUR
Semen Semen Padang 1 ls ISO 14001 52.363.825.025 Total material yang memiliki sertifikat ISO 14001
Besi Beton Krakatau Steel 1 ls ISO 14001 76.914.223.701 yang masih berlaku sampai konstruksi berjalan
B ARSITEKTUR adalah Rp. 234.161.081.045 atau setara 76% dari
Homogenous Tile Niro 1 ls ISO 14001 9.322.936.206 total biaya material konstruksi Gedung Noble
Marmer / Granit Niro 1 ls ISO 14001 16.315.138.361 House (> 30%)
Cat
Gypsum Board
Rangka Aluminium Furing
Dulux
Gyprox
Gyprox
1 ls
1 ls
1 ls
ISO 14001
ISO 14001
ISO 14001
3.884.556.753
20.199.695.113
10.876.758.907
1 Point
C MEKANIKAL ELEKTRIKAL
Pipa Plumbing Wavin 1 ls ISO 14001 10.488.303.232
Sanitair TOTO 1 ls ISO 14001 10.488.303.232
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
“Material Daur Ulang adalah material yang telah digunakan sebelumnya dan didapat dari proses
pemilahan kemudian diolah menjadi material baru, bagian yang didaur ulang merupakan bahan
baku utama dari material tersebut”
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
A STRUKTUR
Besi Beton Daur Ulang Besi Bekas (scrap) PT. Krakatau Steel (Persero) Cilegon, Banten 76.914.223.701
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3
“Material berbahan baku dari Sumber Daya Terbarukan adalah material yang berasal dari
hasil pertanian baik berupa tanaman maupun hewan dengan masa panen jangka pendek
(maks. 10 tahun)”
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 2 (Material Melalui Proses Ramah Lingkungan) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3
A ARSITEKTUR
Wood Plastic Composite (WPC) Kayu Sengon CV Jaya Teak Furnindo Jepara, Jawa Tengah 1.942.278.376
(6-8 tahun)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 4 (Kayu Bersertifikat) ASD EEC WAC MRC IHC BEM
Total 2 2 2 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 4 (Kayu Bersertifikat) ASD EEC WAC MRC IHC BEM
Typical Office
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 4 (Kayu Bersertifikat) ASD EEC WAC MRC IHC BEM
B1 Floor
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 4 (Kayu Bersertifikat) ASD EEC WAC MRC IHC BEM
Sertifikat FSC – PT. Sumalindo Sertifikat SVLK – PT. SLJ Global Sertifikat SVLK – PT. Jaya Teak Furnindo
Material Pintu Kayu Material Pintu Kayu Material WPC Dinding
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 4 (Kayu Bersertifikat) ASD EEC WAC MRC IHC BEM
A ARSITEKTUR
Pintu Kayu PT. Sumalindo Lestari Jl. Cipto Mangunkusumo, SVLK, FSC 3.107.645.402 62%
Samarinda
Wood Plastic Composite (WPC) CV Jaya Teak Furnindo Jl. Kecapi RT 2 RW 1, Jepara SVLK 1.942.278.376 38%
TOTAL 5.049.923.778
Point Gained
1 Material kayu yang digunakan pada proyek Kantor ini semua bersertifikat Sistem
Verifikasi Legalitas Kayu (SLVK) 100% dari total material kayu 1 Point
2 62% dari total material kayu menggunakan kayu bersertifikat dari Forest Stewardship
Council (FSC) 1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 5 (Material Prafabrikasi) ASD EEC WAC MRC IHC BEM
Total 3 3 3 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 5 (Material Prafabrikasi) ASD EEC WAC MRC IHC BEM
Hollow Core Slab Tangga Precast Arsitek Interior (WPC, Pintu & Jendela)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 5 (Material Prafabrikasi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 5 (Material Prafabrikasi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 5 (Material Prafabrikasi) ASD EEC WAC MRC IHC BEM
Pek. Arsitektur
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 5 (Material Prafabrikasi) ASD EEC WAC MRC IHC BEM
NO MATERIAL METODE JUMLAH HARGA (Rp) % NO MATERIAL METODE JUMLAH HARGA (Rp) %
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 6 (Material Regional) ASD EEC WAC MRC IHC BEM
Total 2 2 2 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
MRC - 6 (Material Regional)
Singapore Serawak
Pekanbaru
Pontianak
Samarinda
Padang
Banjarmasin
Jakarta
Denpasar
Rad. 1000 km
Radius
MRC - 6 (Material Regional) ASD EEC WAC MRC IHC BEM
Ex. GYPROC
Gn. Putri - Jabar
Cikarang - Jabar
1 Ls
1 Ls
16.315.138.361 35%
20.199.695.113 65%
1 Marmer / Granit
sebesar 94%
3 Plafond
Gypsum Board
Ex. NIRO
Ex. GYPROC
Gn. Putri - Jabar
Cikarang - Jabar
1 Ls
1 Ls
116.315.138.361
Point
20.199.695.113 65%
35%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - REKAPITULASI POIN ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
Tujuan
Menjaga dan meningkatkan kualitas udara di dalam ruangan dengan melakukan introduksi udara luar ruang sesuai dengan kebutuhan laju
ventilasi untuk kesehatan pengguna gedung
Tolak Ukur SUB MAX BASELINE TARGET INVESTMENT
POINTS POINTS POINTS POINTS (IDR)
Desain ruangan yang menunjukkan adanya
potensi introduksi udara luar minimal sesuai
P P P -
dengan Standar ASHRAE 62.1-2007 atau Standar
ASHRAE edisi terbaru.
Total P P P -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
Sumber GBCI
Sumber GBCI
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
Hasil perhitungan
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
Lantai Dasar
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - PRASYARAT (Introduksi Udara Luar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 1 (Pemantauan Kadar CO2) ASD EEC WAC MRC IHC BEM
Tujuan
Memantau konsentrasi karbon dioksida (CO2) dalam mengatur masukan udara segar sehingga menjaga kesehatan pengguna gedung.
Total 1 0 1 456.984.990
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 1 (Pemantauan Kadar CO2) ASD EEC WAC MRC IHC BEM
Lantai tipical
Investasi CO2 Sensor sebesar @2.820.895
27 lantai x 6 buah = 162 buah A A A
TOTAL Investasi = Rp. 456.984.990
A A A
B
C CO2 Sensor
Ruangan dengan kepadatan tinggi dilengkapi sensor CO2 untuk mengatur C → 500 – 1.000 PPM
jumlah ventilasi udara luar sehingga konsentrasi C02 Terdeteksi maka kirim
tidak lebih dari 1.000 ppm, sensor diletakkan 1,5 m di atas lantai dekat return Signal trigger to B
air grille atau return air duct
“Mengurangi tereksposnya para pengguna gedung dan permukaan material interior dari
lingkungan yang tercemar asap rokok sehingga kesehatan pengguna gedung dapat
terpelihara”
Total 2 0 2 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 2 (Kendali Asap Rokok di Lingkungan) ASD EEC WAC MRC IHC BEM
Ground Floor
1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 2 (Kendali Asap Rokok di Lingkungan) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
“Mengurangi polusi udara ruang dari emisi material bangunan yang dapat mengganggu
kenyamanan dan kesehatan pekerja konstruksi dan pengguna gedung”
Total 3 3 3 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
“VOC atau Volatile Organic Compounds merupakan emisi berupa gas yang terdiri atas senyawa kimia
organik yang mudah menguap. VOC dari material bangunan terbukti dapat menyebabkan iritasi mata,
hidung tenggorokan, sakit kepala dan berpotensi menyebabkan kanker
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 1
1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
“Formaldehida atau dikenal dengan Formalin dalam bentuk cairnya merupakan emisi gas yang mudah
terbakar dan berbau tajam. Formaldehida pada produk kayu komposit/laminating adhesive dapat
menyebabkan mata berair, panas pada hidung dan tenggorokan, batuk, sesak napas bahkan kanker.
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Pekerjaan Arsitektur dengan Material Kayu
Wood Plastic Composite (WPC) Wallpaper
Typical Office
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 2
Standar kadar emisi Formaldehida GBCI Sertifikat WPC Supplier (CV. Jaya Teak Furnindo)
1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3
“Mercury atau Air Raksa pada lampu berbahaya bagi kesehatan manusia terkait dengan metabolism
tubuh (merusak system syaraf, janin dalam kandungan dan kecerdasan anak-anak).
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3
3x7.5W LED T5
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3
Bebas Mercury
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3
“Asbestos adalah material silika yang terbentuk secara alami ataupun terkandung dalam bahan material
konstruksi bangunan yang dapat menyebabkan berbagai macam penyakit seperti kangker dan paru-paru.
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 3 (Polutan Kimia) ASD EEC WAC MRC IHC BEM
TOLOK UKUR - 3
Bebas Asbes
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 4 (Pemandangan ke Luar Gedung) ASD EEC WAC MRC IHC BEM
Tujuan
Mengurangi kelelahan mata dnegan memberikan pemandangan jarak jauh dan menyediakan koneksi visual ke luar gedung.
Total 1 1 1 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 4 (Pemandangan ke Luar Gedung) ASD EEC WAC MRC IHC BEM
Area office
Lantai 6 sd 19 Low Zone
Area Core
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 4 (Pemandangan ke Luar Gedung) ASD EEC WAC MRC IHC BEM
Kaca Kaca
NLA = 42.338 m2
Nett Gross Office Area = 40.529 m2
Total 40.529m2/42.338m2 menjadi 95% dan cukup
memenuhi dari yang diisyaratkan yaitu 75%
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 5 (Kenyamanan Visual) ASD EEC WAC MRC IHC BEM
Tujuan
Mencegah terjadinya gangguan visual akibat tingkat pencahayaan yang tidak sesuai dengan akomodasi mata.
Total 1 1 1 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 5 (Kenyamanan Visual) ASD EEC WAC MRC IHC BEM
LIGHTING SYSTEM
Kenyamanan Visual
Ruang kerja dibatasi dengan
350 lux dan temperature
Berkisar di 3.300K-5.000K
Kondisi ini akan digambarkan pad gambar perencanaan dan
Temperatur diambil 4.000K didetailkan di teknikal spesifikasi konsultan perencanaan
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 6 (Kenyamanan Termal) ASD EEC WAC MRC IHC BEM
Tujuan
Menjaga kenyamanan suhu dan kelembapan udara ruangan yang dikondisikan stabil untuk meningkatkan produktivitas
pengguna gedung.
Tolak Ukur MAX BASELINE TARGET INVESTMENT
POINTS POINTS POINTS (IDR)
Total 1 1 1 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 6 (Kenyamanan Termal) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
IHC - 7 (Tingkat Kebisingan) ASD EEC WAC MRC IHC BEM
Tujuan
Total 1 1 0 -
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - REKAPITULASI POIN ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
(UU-18/2008)
SAMPAH SEJENIS SAMPAH RUMAH TANGGA
Sampah yang berasal dari kawasan komersial, kawasan industri, kawasan khusus, fasilitas sosial, fasilitas
umum, dan atau fasilitas lainnya
KAWASAN KOMERSIAL
Meliputi pertokoan, rumah makan, pasar, perkantoran, hotel, dan lain-lain.
Jenis sampah yang ditimbulkan antara lain kertas, kardus, plastik, kayu, sisa makanan, kaca, logam,
limbah berbahaya dan beracun, dan sebagainya
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
Tempat Sampah
Tempat Sampah Kolektif
Area Perkantoran dan
Tiap Lantai
Area Publik
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
Tempat Sampah
Tempat Sampah Kolektif
Area Perkantoran dan
Tiap Lantai
Area Publik
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
Di Basement (B1)
terdapat TPS sebagai
tempat pengumpul
sampah sementara dari
Gedung Noble House.
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
Asumsi jumlah pengguna di gedung seluas NLA 42.339 m2 adalah 42.340 m2 / 10 m2/org = 4.234 org.
Diperoleh perkiraan perhitungan sampah dalam sehari sebagai berikut:
Timbulan sampah total = 0,75/ liter orang x 4.234 orang = 3.175,5 liter
Sampah organik = 40% x 3.175,5 liter = 1.270,2 liter
Sampah anorganik = 50% x 3.175,5 liter = 1.587,5 liter
Sampah B3 = 10% x 3.175,5 liter = 317,6 liter
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - PRASYARAT (Dasar Pengelolaan Sampah) ASD EEC WAC MRC IHC BEM
NLA = 42.339 m2
Jumlah Pembuang Sampah : 42.339 / 10 = 4.234 org
Timbulan Sampah / Hari : (4.234 x 0,75) / 1000 = 3,18 m3
Jadwal pengangkutan sampah 2 x seminggu : 3,18 x 2 hari = 6,35 m3
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 1 (GP Sebagai Anggota Tim Proyek) ASD EEC WAC MRC IHC BEM
GREENSHIP PROFESSIONAL
1. Memberi masukan dan meyakinkan ke Owner, untuk mengikuti sertifikasi Green Building
2. Memberi input dan masukan selama proses desain untuk mencapai target yang diinginkan
3. Membantu mengurus Dokumen dan Administrasi serta Formulir-formulir dalam proses sertifikasi.
4. Mengawasi jalanya pelaksanaan pembangunan agar sesuai dengan point-point yang sudah ditetapkan
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 1 (GP Sebagai Anggota Tim Proyek) ASD EEC WAC MRC IHC BEM
SERTIFIKAT GP
contoh
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 1 (GP Sebagai Anggota Tim Proyek) ASD EEC WAC MRC IHC BEM
BIAYA INVESTASI GP
Harga 1 GP Arsitek:
No Jenis Jumlah Jangka Waktu (bulan)
Salary Total Tahap Perencanaan – Konstruksi
Tahap Perencanaan
1 1 orang 2 15,000,000.00 30,000,000.00
(GP Arsitek)
2
Tahap Konstruksi
1 orang 20 15,000,000.00 300,000,000.00
1 GP ME:
(GP Arsitek)
Testing Commissioning
Tahap Commissioning
3 (GP Mekanikal) 1 orang 6 15,000,000.00 30,000,000.00
TOTAL 360,000,000.00
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
PANEL INTERIOR
Tiang Pancang
Hollow Core Slab
Tangga Precast Balok Precast Wood-Plastic Composite (WPC) utk Pintu Jendela
di Rg Tenant dan Toilet
• Pengikatan Kontrak Kerja dengan suplier beton dengan cara volume terpasang berdasarkan gambar kerja.
Menggunakan kansteen, balok precast, kolom precast, tangga precast, dan hollow core slab dalam MRC 4: Kayu Bersertifikat
pekerjaan konstruksi. Masuk di dalam Fit Out Agreement BEM 6
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
contoh contoh
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
Limbah Padat
Pengumpulan sampah
dilakukan di project site sesuai Kemudian sampah ditempatkan pada
dengan jenis dan sifat sampah tempat pembuangan sampah
sementara (TPS)
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
ME / SE
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
Limbah Cair
Menjaga kualitas seluruh air yang timbul dari aktivitas konstruksi agar
tidak mencemari drainase kota
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
contoh
contoh
1 Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
contoh
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 2 (Polusi dari Aktivitas Konstruksi) ASD EEC WAC MRC IHC BEM
SOP
SURAT PERNYATAAN DENGAN contoh STANDAR OPERASIONAL PROSEDUR
KONTRAKTOR S.O.P contoh
PENGELOLAAN LIMBAH
KONSTRUKSI BANGUNAN
2018
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 3 (Pengelolaan Sampah Tingkat Lanjut) ASD EEC WAC MRC IHC BEM
TOTAL 2 2 2 -
Strategi untuk mencapai target :
MELAKUKAN KERJASAMA DENGAN PIHAK KE-3 UNTUK MENGOLAH
LIMBAH ORGANIK DAN ANORGANIK
Nobel House Internusa bekerja sama dengan:
1. PT. Shinko Teknik Indonesia (STI) untuk mengangkut dan mengolah sampah organik dan anorganik
2. PT. Arah Environmental Indonesia (AEI) untuk mengangkut dan mengolah sampah B3.
Untuk usaha ini tidak dibutuhkan biaya investasi, bahkan bisa mendapatkan keuntungan, mengingat limbah tersebut
masih mempunyai nilai ekonomi tinggi.
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 3 (Pengelolaan Sampah Tingkat Lanjut) ASD EEC WAC MRC IHC BEM
Limbah organik yang berasal dari area perkantoran dan area publik
Gedung Noble House
Sampah organik diolah lebih lanjut Sampah organik diangkut oleh Pihak Ketiga
oleh pihak ketiga untuk dijadikan menggunakan mobil box kecil yang cukup masuk ke
kompos basement TPS Gedung Noble House
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 3 (Pengelolaan Sampah Tingkat Lanjut) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 3 (Pengelolaan Sampah Tingkat Lanjut) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 4 (Sistem Komisioning yang Baik dan Benar) ASD EEC WAC MRC IHC BEM
ASHRAE GUIDELINE 0-2005 “THE COMMISSIONING PROCESS” DAN ASHRAE GUIDELINE 1.1-2007
Strategi untuk mencapai target: “HVAC&R TECHNICAL REQUIREMENTS FOR THE COMMISSIONING PROCESS” UNTUK SISTEM TATA
UDARA DAN AC U.S. General Services Administration (GSA)
Menyiapkan prosedur, form-form dan tabel-tabel spesifik “The Building Commissioning Guide”:
menurut peralatan yang terpasang dan dengan merujuk standar ❖ Heating, Ventilating and Air Conditioning (HVAC)
manufaktur, sehingga dapat dilakukan testing commissioning ❖ Automatic Temperature Control System (ATC)
dengan baik dan benar. ❖ Electrical Systems
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 4 (Sistem Komisioning yang Baik dan Benar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 4 (Sistem Komisioning yang Baik dan Benar) ASD EEC WAC MRC IHC BEM
Scope of Commissioning
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 4 (Sistem Komisioning yang Baik dan Benar) ASD EEC WAC MRC IHC BEM
Commissioning Team
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 4 (Sistem Komisioning yang Baik dan Benar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 4 (Sistem Komisioning yang Baik dan Benar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 4 (Sistem Komisioning yang Baik dan Benar) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 5 (Penyerahan Data Bangunan Hijau) ASD EEC WAC MRC IHC BEM
No Uraian Waktu
1 Appropriate Site Development 7 September 2018
2 Energy Efficiency Measure 14 September 2018
3 Water Conservation 21 September 2018
4 Material Resources and Cycle 2 September 2018
5 Indoor Health and Comfort 16 September 2018
6 Building Environment Management 23 September 2018
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 6 (Kesepakatan dalam Melakukan Fit Out) ASD EEC WAC MRC IHC BEM
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 6 (Kesepakatan dalam Melakukan Fit Out) ASD EEC WAC MRC IHC BEM
SURAT PERNYATAAN
contoh contoh
STANDAR OPERSIONAL PROSEDUR
S.O.P
1
Point GEDUNG NOBLE HOUSE
IHC P, 1, 2, 3, 6 ttg
Kualitas Udara
2018
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 7 (Survey Pengguna Gedung) ASD EEC WAC MRC IHC BEM
Tahun 2020
No Materi
Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1 Survei - 1
2 Survei - 2
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
BEM - 7 (Survey Pengguna Gedung) ASD EEC WAC MRC IHC BEM
2
Point
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
ANALISA INVESTASI & PAYBACK PERIOD
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
Perbandingan Payback Period, Nilai Investasi, dan Efisiensi di Tiga OTTV di Bawah 35 W/m2
OTTV di Bawah Baseline 35 W/m2
No Uraian OTTV 1 (31,46 W/m2) OTTV 2 (26,88 W/m2) OTTV 3 (22,68 W/m2)
Dengan Solar Panel Tanpa Solar Panel Dengan Solar Panel Tanpa Solar Panel Dengan Solar Panel Tanpa Solar Panel
I Investasi utk Traget Platinum
1 ASD 3.871.037.000,00 3.871.037.000,00 3.871.037.000,00 3.871.037.000,00 3.871.037.000,00 3.871.037.000,00
2 EEC
a non OTTV 8.490.719.690,00 7.566.719.690,00 7.888.719.690,00 6.964.719.690,00 7.688.719.690,00 6.764.719.690,00
b OTTV 12.836.593.320,00 12.836.593.320,00 16.412.085.520,00 16.412.085.520,00 16.412.085.520,00 16.412.085.520,00
3 WAC 3.847.749.000,00 3.847.749.000,00 3.847.749.000,00 3.847.749.000,00 3.847.749.000,00 3.847.749.000,00
4 MRC 0,00 0,00 0,00 0,00 0,00 0,00
5 IHC 456.984.990,00 456.984.990,00 456.984.990,00 456.984.990,00 456.984.990,00 456.984.990,00
6 BEM 3.919.576.178,00 3.919.576.178,00 3.919.576.178,00 3.919.576.178,00 3.919.576.178,00 3.919.576.178,00
Total Investasi 33.422.660.178,00 32.498.660.178,00 36.396.152.378,00 35.472.152.378,00 36.196.152.378,00 35.272.152.378,00
Payback Period (Investasi/Efisiensi per tahun) / tahun 6,68 6,65 6,79 6,76 6,57 6,54
Prosentase Investasi terhadap Biaya Konstruksi 4,93% 4,79% 5,37% 5,23% 5,34% 5,20%
Biaya Konstruksi 677.945.235.616,00
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
PERBANDINGAN PAYBACK PERIOD,
NILAI EFISIENSI di Tiga OTTV under 35 W/m2
37.000.000.000 5.511.939.313,00 5.500.000.000
36.500.000.000
5.400.000.000
36.396.152.378,00
36.000.000.000 36.196.152.378,00
5.362.816.551,00 5.300.000.000
35.500.000.000
5.200.000.000
OTTV 1 (31,46 W/m2) terendah 35.000.000.000
NOBLE HOUSE Building GROUP 1 - Greenship Professional (GP), Angkatan 2 Thn 2018
THANK YOU
“THE GREAT TEAM
FIND A WAY TO WIN”