Centre Name:
OVERVIEW
Well Control Incidents
DR-SF-PNP-01.01.01
Factors that affect Explain hydrostatic pressure and factors that can affect
hydrostatic pressure. it.
DR-SF-PNP-02.01.02
Hydrostatic pressure
Calculate hydrostatic pressure at a given depth.
calculations.
Formation pressure
DR-SF-PNP-02.02.01
Fracture Pressure
DR-SF-PNP-02.03.01
BARRIERS
Barrier Concept
From a given situation, identify examples of primary
DR-SF-PNP-03.01.01
Barrier terminology –
Describe the terms ‘primary” and ‘secondary’ barriers
‘primary’ and ‘secondary’
elements.
barrier elements.
RISK MANAGEMENT
Well Control and Emergency Drills
DR-SF-PNP-04.01.01
The Management of
Explain why a MOC process is required.
Change (MOC) process.
DR-SF-PNP-04.01.04
CAUSES OF KICKS
General
DR-SF-PNP-05.01.01
Gas Cutting
DR-SF-PNP-05.04.01
Lost Circulation
DR-SF-PNP-05.05.01
Tripping
DR-SF-PNP-05.07.01
Kick Indicators
DR-SF-PNP-06.02.01
Shallow Gas
DR-SF-PNP-06.03.01
CIRCULATING SYSTEM
Definition and Principles
DR-SF-PNP-07.01.01
The importance and use Explain how gas behaves as it is circulated up the well
of the gas laws. (No calculations) using Boyle’s law (P1V1 = P2V2).
SHUT-IN PROCEDURES
General Principles
DR-SF-PNP-09.01.01
Hang Off
DR-SS-PNP-09.03.01
Interpretations
DR-SF-PNP-09.05.01
Recording shut-in well Explain why pressures are recorded after the well has
pressures. been shut-in to establish stabilised pressures.
Observations
DR-SF-PNP-09.06.03
Kill Sheets
DR-SF-PNP-10.02.01
Calculations
DR-SF-PNP-10.05.01
Calculate:
- Pipe volumes and capacity
- Annular volumes and capacity
- Open hole volumes and capacity
Oilfield calculations.
- Displacement volumes and capacity
- Volume and length calculations when tripping
pipe
- Circulation strokes and times.
The Wait and Weight Outline the Wait and Weight Method:
Method of well kill Circulate out influx while displacing the well with kill
operations. fluid.
How returns are Explain how to monitor returns when running and
monitored when tripping pulling casing:
large diameter tubulars - Monitor the trip tank
(reduced annular - Monitor fill up
clearance). - Casing running sheet.
BLOWOUT PREVENTERS
BOP Stack Configuration
DR-SF-EQP-01.01.01
The operating principles Explain why and when to use blind/shear rams:
of BOP blind/shear - Cuts the pipe in the hole (inside the BOP)
equipment. - Closes and seals the well.
Annular Preventers
DR-SF-EQP-01.04.01
Diverters
DR-SF-EQP-01.07.02
AUXILIARY EQUIPMENT
Mud Gas Separators (MGS)
DR-SF-EQP-04.01.01
Vacuum Degasser
DR-SF-EQP-04.02.01
TESTING
BOP and Equipment Testing
DR-SF-EQP-05.01.01
Inflow Testing
DR-SF-EQP-05.02.01
On behalf of the centre I accept that the above information cross referenced as evidence is true and accurate and I agree to be audited
against it.
I also accept that if the information is not true and accurate that the centre accreditation may be suspended by IWCF.