RIG : BN 11
AFE NUMBER : 2500CP7455
AFE AMOUNT : $48,805.00
PROGRAM NUMBER : DURI0985720190715RLN12
EST. TIME : 5 DAYS
Completion & Workover – DURI09857 – 5G-0302A
Table of Content
A. OBJECTIVES .................................................................................................................................................... 2
1
Completion & Workover – DURI09857 – 5G-0302A
A. Objectives
The program objectives are:
• Maintain Well Control at All Times
• Provide safe and reliable operations
• POH tubing pump, run CBL/ USIT, perform pressure test casing, RIH tubing pump with the same
size and pump depth
2
Completion & Workover – DURI09857 – 5G-0302A
3
Completion & Workover – DURI09857 – 5G-0302A
4
Completion & Workover – DURI09857 – 5G-0302A
3. Completion Interval – Geological Data, Well Pressure, Well Temperature, and Calculated MASP
Pressure and temperature refer to: Fluids data Assumption:
Est. Maximum Formation Temp. at Rindu sand, (447' TVD): 152deg.F Oil Avg. API Duri: 22 deg. API
Est. Maximum Formation Pressure at Pertama sand, (610' TVD): Oil Fluid Gradient: 0.3992 psi/ft
243.9268 psi Gas Gradient: 0.1 psi/ft
Gas/Oil Mixture Gradient: 0.23
Estimate Fract. Gradient: 0.5408 psi/ft
psi/ft
Potential GOR: 0 MSCF/STB
MASP = 45.4psi
Maximum Bullheading or Injection pressure (below fract pressure) = 48.2psi, *use water
Calculated MASP:
Penetrated Top Reservoir Reservoir Reservoir Fluid
press. Hydrocarbon MASP
Reservoir Sand Status depth press. temp. (deg Gradient
(ppg) content (psig)
Sand TVD/MD (psig) F) (psi/ft)
5
Completion & Workover – DURI09857 – 5G-0302A
4. Workover History
- This well indicated has high casing and tubing pressure. Please do same procedure as well
5G0905A caused bubbling near well head during injected water thru annulus.
- Last Rig job was PMP05 (NPN) on 06-Mar-2015 by CPI-98. TOS @ 605 ft (10 ft Sand Fill), COS to
615 ft (PBTD). No well control issue.
- No other rig job or any workover job performed yet on well since drilled.
Date Comments
15/07/19 WCT- Cooling Down Well
WCT is on location to cooling down well. As update on 5 Jul 2019 the
pressure was 5/5 psi. Waiting on rig to execute the well.
07/01/19 BN 08 – LW – No Operation Issue – Pending well,
- Initial SITP/SICP 100/150 psi. Initial cooling down total 1080 bcw,
KCL water 9.6 ppg 360 bbls.
- Oil and hot water in return
- Final SITP/SICP 30/45 psi. Pending the well
5/3/2019 SET BDJ TRUCK PT. ACS - PJM. RUN PRESS 70/70 PSI. BUP W/10 STRKS.
PRESS 80/80-80/80 PSI. LOWERED PLGR 6 INCH. BUP W/10 STRKS. PRESS
300/300-300/300 PSI. FINAL PRESS 70/70 PSI.
2/26/2017 COMPLETED INJECTED STEAM1.5 BBTU @16:30 BY CYCLIC UNIT
11/21/2016 COMPLETED INJECTED STEAM 1.5 BBTU @15:00 BY CYCLIC UNIT
6/20/2016 COMPLETED CYCLIC STEAM INJECT1.5 BBTUs @ 12:30, MOVE CYCLIC
UNIT TO NEW LOCATION
5/24/2015 SET BDJ TRUCK PT. ACS - PJM. RUN PRESS 90/75 PSI. BUP W/3 STRKS.
PRESS 300/200-80/80 PSI. LOWERED PLGR 4 INCH,FISH,HIT AND RESET
STD VLV. BUP W/2 STRKS. PRESS 300/300-300/300 PSI. FINAL PRESS
105/95 PSI. THE WELL RE POP @ 22:15 HRS.
5. General Data
Mechanical Status • Last Tag at 605 ftMD
in Wellbore • No mechanical problem
Installed Wellhead • Casing Head: CPO 13-3/8” – 2M
• Tubing Head: SOW 9-5/8 x Flanged 11” – 2M
Bit History • Surface Section: 17.5” bit to 213’
• Production Section: 9.87” bit to 622’
Primary Cementing • Surface Casing: Full Circ. had 12 bbls cement return.
History • Production Casing: Had 10 bbls cement return to surface. Float held
No CBL Data
6
Completion & Workover – DURI09857 – 5G-0302A
7
Completion & Workover – DURI09857 – 5G-0302A
• Maximum pore pressure is 8.61ppg, which is slightly high than water, but for
initial killing will use water at first then stabilized shut in pressure will be use
to calculate KF. Please prepare estimate 9 – 9.5ppg KF.
Expect low/high fluid losses from Rindu sand, up to 20 BPH
Mitigation for Fluid Loss:
- Refer to IBU SMO Loss circulation SOP section 2.2
- There are 2 tanks available in rig site with both have maximum 200 bbls
capacity or total for 2 tanks are 400 bbls. With average pump rate 2-5 bpm, 2
tanks could supply water for 80 – 200 minutes depends on the fluid loss and
supply water from killing line.
- Each of area has dedicated stand pipe or central gathering station (either
treated formation water or fresh water): Stand pipe 5U and 6L Brine and Mud
Fluid loss are provided by third party contractor (PT. Matra Unikatama).
control plan - With 1 load of vacuum or tanker capacity is 60 bbl., we need 7 load to full the
tank. We need the vacuum to re-fill up rig tank every 12 – 30 minutes to get
continues pumping (assuming no fluid in the tank).
- Based on assessment, the access road to location is good enough for vacuum
truck to reach the location. The availability of vacuum truck to be discussed
with operation team in Pre-Operation Meeting.
- If polymer is needed. Chemical for mixing polymer will be provided by service
company (Matra Unikatama) which base is located within 30 KM from the
field.
TCT/PCT N/A
Hydrates
N/A
Suppression
9. Barrier
No Operatio Procedure Internal Barrier External Barrier
n
1. Routine POH Plunger and 1) Kill Weight Fluid 1) Kill Weight Fluid
Sucker Rod 2) Rod BOP 2) Tubing hanger
2. Non- N/D or N/U Tree Kill Weight Fluid inside 1) Kill Weight Fluid
Routine wellbore 2) Tubing Hanger
3. Routine N/U or N/D BOPE 1) Kill Weight Fluid 1) Kill Weight Fluid
2) Stab-in FOSV/IBOP 2) Tubing hanger
4. Routine Tripping with OE, 1) Kill Weight Fluid 1) Kill Weight Fluid
or other DHT with 2) Stab-in FOSV/IBOP 2) BOP
definite diameter
8
Completion & Workover – DURI09857 – 5G-0302A
9
Completion & Workover – DURI09857 – 5G-0302A
10
Completion & Workover – DURI09857 – 5G-0302A
11
Completion & Workover – DURI09857 – 5G-0302A
12
Completion & Workover – DURI09857 – 5G-0302A
HO Completion
Engineering
Team -
Recommendation
DC Eng SMO
Rumbai - 2019.
NO PROCEDURE
13
Completion & Workover – DURI09857 – 5G-0302A
Time
(hrs)
1 MIRU RIG. 12
2 N/D PRODUCTION LINE. 2
3 CHECK SICP AND SITP, RECORD IN WELLVIEW. LINE UP LINES FROM CASING AND
TUBING TO TANK. BLEED OF CASING AND TUBING PRESSURE TO 0 PSI (OR AS
LOWEST AS POSSIBLE). CONTINUE TO KILL THE WELL.
Make sure to kill the well properly before commencing workover operation and
also maintain primary well Control at all time (WSEA 3A and 3B)
Last killing history: Used ttl 1080 bbls water 8.33 ppg and ttl 520 bbls KCL water up
to 9.6 ppg. SICP : 45 psi, SITP :30 (Unsuccessful killing)
If found clay problem in previous job, please use 2-8% KCl in killing fluid
STEP 1:
Pump water with 2-6 bpm every ~100 bbls. Shut in, check pressure and bleed off.
Maximum total volume to be pumped is 1500 bbls 36
STEP 2:
a. IF steam still in return, shut in another injector nearby or Suspect contributed
steam, continue cooling down for another 500 bbls with maximum pump rate
b. IF no steam in return, measure fluid return weight and calculate required KF using
below formula:
KF (ppg) = 8.33 (ppg) + 0.5 ppg (SF) + (Shut-in Pressure (psi)*)/(0.052 x TVD top of
perforation (ft))
Pump KF with maximum 2 times wellbore volume
STEP 3:
Pump polymer 40-80 smf with LCM 40-80 ppb, XX bbls maximum 2 times wellbore
volume
For any other issue or option during initial killing, please discuss with CE and TL Ops
IF well still flowing, discuss with CE and TL Ops for pending job option
4 DISCONNECT STUFFING BOX, RELEASE POLISH ROD, POH PLUNGER AND SUCKER
ROD STRING
History: 2-1/4" PLGR ON 21 JTS 3/4" S.ROD + 18' P.ROD (ALL S.ROD F/PIPE RACK -
BY USING 3/4" SHEAR COUPLING). INSTALLED 1-1/4" PLSH ROD
14
Completion & Workover – DURI09857 – 5G-0302A
5 N/D X-MAS TREE, INSTALL FOSV, AND N/U BOP (ENSURE WELL SECURE). PERFORM
FUNCTION TEST AND PRESSURE TEST BOP.
Low pressure test BOP'S to 250 psi and high pressure test to 650 PSI or 500 + MASP
hold 5 minutes each. Record on Borton chart (WSEA 9B) 6
History: 2-1/4" TP (1052043) ON 17 JTS 2-7/8" NUE TBG. INSTALLED TBG D.NUT
AND SET TP @ 683'
15
Completion & Workover – DURI09857 – 5G-0302A
Note,
1. If TOF is not clear please Run IB, next job will be decided based on IB result.
2. Do not conduct back off tubing for WPF Rig (if need to back off tubing, please
suspend job and move out rig)
3. Please do inspect pulled tubing string condition (every tubing, nozzles, mandrel
and cup packer). Report for any anomaly
4. Notes in the tour report if there is any anomaly such as fluid cut, sand fill, scale,
etc
5. Please discuss with Fisherman and TL Operation if any deviation.
In case Rig did not successful to pull out stuck tubing pump and have to pending
well, make sure to TIH tubing pump (instead of OE tubing) so Rig still able to
perform pressure test Xmas tree (all tree, connections, stuffing box, or sample cock
whichever applicable) to 500 psi + MASP as per stated in WSEA 10-L
Reference,
Fishing in Casing
Fishing in Liner
Fishing tool per hole size
7 ROUND TRIP WITH CASING SCRAPPER TO TBA AND LINER SCRAPPER TO PBTD
16
Completion & Workover – DURI09857 – 5G-0302A
Reference,
Loss Circulation SOP page 11-12
10 CONDUCT PRESSURE TEST CASING
Before performing Pressure test please isolate lower zone by setting packer
(serco/DCS) or dump sand and cement cap if necessary. Pressure Test casing with
300 PSI and hold for 5 mnts.
Evaluate cement bond quality from TBA to Surface to identify cause of Bubbling.
Send CBL -USIT/URS result to PE and CE. If found bad bonding (CE will decide) 12
conduct Squeeze improve bonding. Please see improve bonding job contingency
plan. Conduct injectivity test before Improve Bonding.
17
Completion & Workover – DURI09857 – 5G-0302A
Install tubing hanger and pressure test to 650 psi or 500 psi + MASP hold 5 mnts as
per WSEA 10 H.
2
RIH with new tubing pump 2.25 inch and set pump at 583 ft
Perform pressure test Xmas tree (all tree, connections, stuffing box, or sample cock
whichever applicable) to 500 psi + MASP as per stated in WSEA 10-L.
1
Conduct test pumping 300 psi - 10 minutes to make sure pump can be normally
operated
If it is OK- Continue R/D Rig,
If leaking - Re POH Tubing Pump & check, change TP if needed
15 N/U PRODUCTION LINE. 1
16 RDMO
Ensure to do Proper Handover with PMT. 2
Note: Ensure to write down handover information in the tour report.
Before performing Pressure test please isolate lower zone by setting packer
(serco/DCS) or dump sand and cement cap if necessary. Pressure Test casing with
300 PSI and hold for 5 mnts.
this plan.
18
Completion & Workover – DURI09857 – 5G-0302A
WOC
WOC as per design and monitor cement surface sample 6
Please make sure isolation (packer or cement) can be tested to 1000 psi for 15 min
5% decline or 30 mins 10% decline alloved as per WSEA 10D
19
Completion & Workover – DURI09857 – 5G-0302A
20