Professional Documents
Culture Documents
Session 10-3 Conformance Test Introduction -GTE ZN 按模板修改 钟楠
Session 10-3 Conformance Test Introduction -GTE ZN 按模板修改 钟楠
CTTL-Terminal GTE
Zhong Nan
Content
• General
• GCF and PTECRB Certification
• Conformance Test Content and specification
General
Operat
or/
Carrier
GCF
Industry
PTCRB
Government
GCF (Global Certification Forum)
500
400
300
Number of Certified Devies
200
North
100 America
0
2012 2013 2014
Asia
Europe
North America
2,000
1,500 Total
1,000
500
0
2010 2011 2012 2013 2014
End Products
Device type in 2013
Modules
Integrations
Notebooks End Products
Modules
Integrations
Notebooks
Certification procedure of PTCRB
• Manufacture
• Certification Request Submission
• Required information
• Selection of Accredited Test Lab
• Declarations
• Accredited Test Laboratory PTCRB Certified Devices
• Execute Test 3,500
3,000
• Report 2,500
ECO Certifications
2,000
1,500
Initial/Variant
1,000 Certifications
500
0
2010 2011 2012 2013 2014
Certification Technical Requirement
NAPRD03 GCF-CC
NAPRD03 GCF-CC
Version
• Format
• V x.y.z
• Applicability – The first number indicates the main
version number
• UEs submitted for certification are – The middle number is the major
required to complete the execution of all revision number
applicable tests approved and published – The last number is the minor revision
number
in one of the two most recent versions of
NAPRD03 as of the date the mobile is to
complete certification.
PTCRB/GCF technical requirements
Test cases
Category based on tests which have been specified by an
"A": appropriate SO and validated on commercially available
Category Test fully available and fully validated, testing at an test equipment
"A": accredited test laboratory required Category based on tests which have been specified by an
Category Testing at an accredited test laboratory with exceptions "B": appropriate SO and validated on commercially available
"B": test equipment with exceptions
Category Test is downgraded and is not a certification requirement Category based on tests which have been specified by an
"D": "C": appropriate SO and validated on commercially available
Category "E” Test case is validated and results are provided to CTIA. Failure test equipment, but do not yet meet the Work Item or Test
of DUT to pass test case will not cause loss of certification. Case certification entry criteria
Category "N” Not applicable Category based on tests which have been specified by an
Category "P” New test case not yet validated or a test case that has been "D": appropriate SO from which validation or full status has
downgraded for more than 45 days.
been removed
Category based on tests which have been specified by an
"P” appropriate SO and not validated on commercially
available test equipment
Category Test not applicable
"N”
PTCRB/GCF technical requirements
Test Frequency Band
ALL • the mobile shall be tested in all
required Bands
• that the applicable test case (e.g.
Single protocol testing) must be tested
according to the rules
I-RAT Single • shall be tested in a single band
combination.
Test Platform
• Accredited labs must use approved test platforms as listed
on TC Database
Content
• General
• GCF and PTECRB Certification
• Conformance Test Content and specification
General
Conformance Test
Operat OTA
or/ Performance Test
Carrier Field Trail
GCF
Industry
PTCRB
Conformance Test
Government OTA
RSE
Test Content
PTCRB/GCF technical
Test Specification
requirements
AE AUDIO STK
PROTOCOL SIM
RF UICC
PICS and Test Plan
Test Plan
•List of all the test cases need to be reported
Test Content
RF
• transmission and reception
• Phase error
• Frequency error
• Power
• Channel rejection
• Blocking
• Radio resource management
• Cell Re-selection
• Handover GSM WCDMA LTE
• Re-establishment
• 3GPP TS 51.010-1 • 3GPP TS34.121-1 • 3GPP TS36.521-1 –
• Random Access • Chapter 12-14, 16, RF
21,22 • 3GPP TS36.521-3 –
RRM
Test Content
UICC
• Physical characteristic
• Electrical characteristic
• Logical test
AE
• OMA-ETS-MMS-1_3 • OMA-ETS-DM-V1_2
• PoC • OMA-ETS-SUPL-V1_0/V2_0
• IMTC-3G 324M VT • ETSI TS 102 694/102 695 SWP/HCI
Questions:
1. Which part of all the conformance test content have the longest
test duration?
2. What rules does the test lab follow to decide the test frequency and
test cases?
(Trainer information)
Trainer: Zhong Nan
E-mail: zhongnan@catr.cn
Department: CTTL GTE
Address: No.1212 Floor 12,Shouxiang Science Building,No.51 Xueyuan
Road, Haidian District, Beijing, P.R.China 100191
THANK YOU !
中国信息通信研究院 http://www.caict.ac.cn