Design Memorandum - 9962-001-IS-155-PVM-Z-005-03
Design Memorandum - 9962-001-IS-155-PVM-Z-005-03
Design Memorandum - 9962-001-IS-155-PVM-Z-005-03
2 Page 03 of 62: Please indicate NTPC/UPRVUNL drg ref no Noted and indicated
3 Page 03 of 62: whose scope truck tippler?? UPRVUNL scope
Please ref tender drawing no-14A14-DWG-M-050(sh 1 OF 4), uncrushed stockpile is
4 Page 03 of 62: check crushed or uncrushed stockpile of limestone shown before reclaime hopper. As per tender submitted to UPRVUNL also, 15 days
uncrushed limestone storage is considered.
Conveyor will be started from dewatering building and receipt of Gypsum from vaccum
5 Pgae of 4 of 62: bldg or below vaccume belt filter
beelt filter. Same is revised in DM also.
As per amendment no-2 issued during tender, capacity was revised of CHP conveyors.
6 Pgae of 4 of 62: Not inline with specification
Capacity indicated here is inline with amendment2 only.
7 Page 9 of 62: M/s. BHEL to confirm whether the offer safety switches will be SIL certified or not. SIL certified safety switches are not envisaged for CHP / LHP / GHP system.
Page 11 of 62: M/s. BHEL to note that major C&I items include :-
1. Noted and included.
1. DDCMIS
2. Noted and included.
8 2. PLC systems for some of the CHP sub-systems
3. Noted and included.
3. Stockyard level and profile monitoring
Why the above major C&I systems are not a part of the above list ?
Page 14 of 62: As per comments on layout drawing, some additional conveyors have to be As per discussion held at NTPC office on layout and profile, there is no need of extra
9
planned for lime/gypsum transportation. belt conveyors for transportation.
Page 37 of 62 : How will the Stacker - Cum - Reclaimer be controlled ? Will it be controlled via PLC
10 It will be controlled from PLC
or DDCMIS ?
Redundant wireless link or industrial grade redundant soft link between CHP DDCMIS
Page 39 of 62:Is Fibre optic cabling envisaged from Stacker Reclaimer to main CHP control room ?
11 & Stacker reclaimer PLC will be considered. Actual arrangement will be submitted
If so then how is it envisaged to be laid between SR machine and CHP control room ?
during detail engg.
As per FGD specificatio caluse no 2.7/ sheet 68 of 185 pull cord switch and belt sway
12 Page 49 of 62: Location of pull cord and belt sway switch shall be 20 mtr & 30 mtr respectively.
switch shall be 30mtr & 50mtr.
This approval status shall be interpreted as laid down in the contract and
it shall not relive the contractor form the contractual obligation.
Reviewed & Submitted for
CAT I - Approval
CAT II & III - Information
CAT IV - Reference
Name
Lovekush Verma
Engineer
Bharat Heavy Electricals
Limited
ISG-PE CHP
Bangalore -560012
NTPC LIMITED
REVIEW CONSULTANT A GOVERNMENT OF INDIA ENTERPRISE
CONSULTANT
INDEX
1.0.1 The site is situated at Panki adjacent to existing Panki Thermal Power Station, Panki, Uttar
Pradesh. Project data is as per enclosed Annexure – ‘1’
1.2.0 PREFACE
1.2.1 This document is to draw out Design memorandum/ Technical specifications for Coal
handling plant for 1 X 660 MW at Panki Thermal Power Station, Panki, Uttar Pradesh.
1.2.2 The plot plan drawing No 9962-001-IS-155-PVM-F-002 and Coal Flow/ Limestone flow/
Gypsum Flow diagram drawing No 9962-001-IS-155-PVM-L-001 of Coal handling/
Limestone handling and gypsum handling plant is considered.
3
The Coal handling plant for Panki Thermal Power Station will commence receipt of coal
from wagon tippler house as per the layout drawing and will terminate it on coal bunkers.
The Coal handling plant will include Wagon tipplers, accessories for unloading uncrushed
coal, all conveyors for in plant conveying and handling, storage of crushed coal, crushers
for size reduction, Stacker / Reclaimer and Reclaim hoppers for stacking and reclaiming &
Trippers for Bunker filling operation. Dust extraction & suppression systems, Ventilation
systems, Elevators and Sump pumps at appropriate locations will be provided as per the
coal flow diagram and plot plan. Bull dozer & Payloaders will be supplied as per
specification.
The limestone handling system will start form reclaim hopper and will terminate it on
limestone silo. LHP will include all conveyors for in plant conveying and handling, storage
of uncrushed limestone, crushers for size reduction and Reclaim hoppers. Dust extraction
& suppression systems, Ventilation systems and Sump pumps at appropriate locations will
be provided as per flow diagram.
The gypsum handling system will commence receipt of gypsum from vacuum belt filter
and will end at gypsum storage shed through conveyor. 3
Firefighting system, Bunker level indicators and Locomotive for the entire CHP will be
covered in the separate package of other BHEL unit, if applicable.
1.2.3 It has been decided to bring coal to the plant site through rail transportation by BOXN
wagons for which new railway track to be laid. However, the work of execution of related
to railway track will be done separately and not in the scope of this specification.
1.3.1 The Flow diagram and Plot Plan of CHP/LHP & GHP are as per Flow Diagram No 9962-001- 3
IS-155-PVM-L-002 & Plot Plan No-9962-001-IS-155-PVM-F-002 respectively. The CHP /
LHP & GHP has been designed on the basis of the following assumptions:
Coal handling System:-
a) Maximum size of Indian coal : (-) 300 mm
b) Size of crushed coal : (-) 20 mm
c) Maximum moisture content present in the coal : 15% (Max)
d) Hard Groove Index (HGI) : 48-65 (for design)
e) Crushed coal storage yard is required for : 12 days 2
f) Height of crushed coal stockyard : 12 meters
g) Bulk density of coal calculation : 0.8 & 1.2T / M³ for Volume and load
respectively.
h) Belt Speed (approx.) : 3.2 meters / second
i) Belt width : 1400 mm (except reversible Belt Feeder)
2
j) Belt width : 1600 mm (for reversible Belt Feeder)
k) Number of working hours : 08 hours per day
l) Angle of repose of coal : 37 degrees
m) Capacity of coal handling system :Rated : 1500 TPH
Designed : 1650 TPH
1.3.2 The CHP consists of two (2) identical and parallel (Coal) streams for main path (1 Working+
1 Standby), each having rated capacity of 1500 TPH commencing from “Wagon Tippler 1 &
2 (WT-1 & WT-2)” up to & including Bunker feeding Tripper conveyors with Bunker sealing
arrangement. Wagon Tippler and pit will be designed as per RDSO G-33 rev-01 standards.
Kindly refer flow Diagram for Coal handling Plant ( Drg No:- 9962-001-IS-155-PVM-L-002/IS- 1
1-FL-713-100-M001) for details.
1.3.3 Coal of (-)300 mm size will be received at Panki TPS site by BOX-N wagons. From BOX-N
wagons coal will be unloaded on Wagon Tippler Hopper.
1.3.4 Coal received by BOX-N wagons, will be unloaded in Wagon Tippler Hopper by Wagon
Tippler. From W.T. Hopper coal will be evacuated by Apron Feeder and will be fed to
Conveyor# BC-1A or 1B through diverter gate for onward conveying to JT-1. Each Wagon
Tippler hopper is having 290 M3 each (water filled volume) capacity with 50 mm guniting
on the walls. For placing Wagons on the Tippler table, side arm charger will be provided
with a capacity to haul 60 loaded Wagons of 140T gross weight each at a time. After
unloading wagons, it will be placed on wagon shifter and pushed to return railway line
with the help of wagon pusher.
1.3.5 In JT-1 coal from Conveyor # BC- 1A or 1B will either be fed through flap gate to
Conveyor# BC- 2A or to Conveyor# BC-2B for conveying coal to Crusher House( CRH-1).
1.3.6 Suspended Electro-Magnet (SEM-1,2) will be provide at PH-1 over conveyor# BC-2A/B.
Inline Magnetic Separators (ILMS-1, 2) will be provided on conveyer#BC-2A/2B head end
for removal of metallic ferrous tramp from “as received” coal. Two (2) nos. Belt Weighers
(BW-1 & 2), Metal detector (MD-1&2) & Two (2) Nos. Coal Scooper (CS-1&2) will also be
provided, one each on conveyer #BC-2A and 2B for measurement of coal flow rate.
1.3.7 Conveyor# BC-2A will feed coal through diverter gate, Rod Gate and Rack & Pinion gate to
both the Vibrating Grizzly Feeders VGF-1A and VGF-1B in Crusher House. Vibrating Grizzly
Feeder VGF-1A will feed the oversize fraction (+) 20mm coal to Ring Granulator CR-1A.
Undersized (-) 20mm coal will be fed to reversible Belt Feeder RBF-1A. Similarly, Vibrating
Grizzly Feeder VGF-1B will feed (+) 20mm coal to Ring Granulator CR-1B and (-) 20mm coal
to Reversible Belt Feeder BF-1A. Crushed product of CR-1A and CR-1B will be fed to RBF-
1A.
1.3.8 Similarly, Conveyor# BC- 2B will feed coal through diverter gate, rod gate, Rack & Pinion
Gate to both Vibrating Grizzly Feeders VGF-2A and VGF-2B in Crusher House. VGF-2A will
feed the oversize fraction (+) 20mm coal to Ring Granulator, CR¬2A and the under size
fraction, (-) 20 mm coal to Reversible Belt Feeder, RBF-2A. Similarly, VGF-2B will feed the
oversize fraction, (+) 20 mm coal to Ring Granulator CR¬2B and the under size fraction (-)
20 mm coal to Reversible Belt Feeder RBF-1B. Crushed product of CR-2A and CR-2B will be
fed to RBF-1B.
1.3.9 RBF-1A & RBF-1B will feed coal to any one of the Crusher House outgoing Conveyor# BC-
3A/3B or 3C/3D through diverter gate. Conveyor# BC-3A & 3B will convey crushed coal to
JT-2 while Conveyor# BC- 3C & 3D will convey crushed coal to JT-8 as shown in flow
diagram.
1.3.10 In JT-2 Conveyor No.# BC 3A or 3B will feed the coal through diverter gate to Conveyor
No.# BC 4A or 4B. Conveyor# BC- 4A/4B is fitted with Fixed Tripper, FT-1 and FT-2 at JT-3
as indicated in Flow Diagram.
1.3.11 Conveyor# BC-4A/4B conveying coal to JT-3, will either feed direct to it-self Conveyor# BC-
4A/4B or will feed coal Yard Conveyor# YBC-1B, for stacking purpose when bunker feeding
is not required. Uni-directional Stacker Cum Reclaimer (S/R) machine, mounted on Yard
Conveyor# YBC-1B and working in conjunction, will stack crushed coal on either side in
long stock piles.
1.3.12 Conveyor # BC-4A/4B receiving coal in JT-3, will convey coal to JT-4 through fixed tripper
FT-1 & FT-2 and will feed Conveyor# BC-5A or 5B at JT-4 through diverter gate. Inline
1.3.20 The Coal handling plant is provided with two streams of conveyors except yard conveyor
out of which one stream of conveyor will be working while the second stream will be
treated as stand by.
1.3.21 Since coal will be received from different sources, coal stacking will be done by horizontal
spreading and reclaiming will be done by vertical cutting, thus permitting blending of coal
maintaining an almost uniform composition after crushing for onward feeding the steam
generator.
1.3.22 The Coal handling plant is also provided with sump pumps, Electric hoists/manual hoist,
Dust suppression system (DFDS, PWDS), Dust extraction system (DE), Air conditioning
system and mechanical ventilation system at the strategic locations.
1.3.23 For tunnel/Underground portions ventilation system 15 air changes for supply fan & 7 air
changes for exhaust fan is considered.
1.3.24 The LHP consists of two (2) identical and parallel (Lime stone) streams (1 Working+ 1
Standby), each having rated capacity of 75 TPH commencing from “Reclaim hoppers# RH 1
to 4” up to & including bucket elevator. Kindly refer flow Diagram for Limestone Handling
Plant for details.
1.3.25 Limestone of (-)250 mm size will be received at Panki TPS site by truck. From Truck,
Limestone will be unloaded on stockyard (15 days storage).
1.3.26 Four (04) nos Reclaim Hoppers (RH) of capacity 20T each have been considered for feeding
Limestone from stock piles by dozing with Bull Dozers. Lime Stone from Reclaim Hoppers
will be fed to Conveyor No.# Conv-1A/1B through Vibrating Feeders, Rod Gate and Rack &
Pinion gate fitted at the bottom of the Reclaim Hoppers opening. Two Belt weigher (BW-
1&2) will be installed be on conv-1A/B.
1.3.27 In TP-1 Lime Stone from Conv- 1A or 1B will either be fed to Conv- 2A or 2B trough
flapgate for conveying Lime Stone to Crusher House(CRH). Two Inline Magnetic Separator
(ILMS-1&2) will be installed over conv-2A/B.
1.3.28 Conv- 2A & 2B will feed Lime Stone to reversible Belt feeder# RBF-1, which will feed the
limestone to the Vibrating screen SCR-1A or SCR-1B through ROD gate and Rack & Pinion
Gate by reversing the direction of RBF-1. Vibrating Screen SCR-1A or SCR-1B will feed the
oversize fraction (+) 20mm coal to Hammer Mill Crusher#HCR-1A or HCR-1B. Undersized (-
) 20mm coal will be fed to Belt Feeder# BF-1 or BF-2.
1.3.29 Further Lime Stone will be feed to the Bucket Elevator through BF-1A & BF-1B. BE-1A & 1B
will convey Lime Stone to LimeStone Silo through flapgate as shown in flow diagram.
1.3.31 Auxiliary systems such as Dust Suppression, Dust extraction, Ventilation / Air-conditioning
arrangement will be provided in the following areas:
Sl.
No. Auxiliary System location
a Mechanical Ventilation 1. CHP Conveyor tunnels for BC-1A/B including W.T
System with supply & complex.
exhaust fans 2. Conveyor tunnels for BC-2A/B
(Please ref DBR- including JT-1. 1
IS-4-DC-713-110-M050) 3. Reclaim Hopper with RC-1A/1B tunnel
4. LHP Conveyor tunnel#Conv-1A/1B including
Sl.
No. Auxiliary System location
reclaim hopper complex.
c Dry Fog type DS Wagon Tippler, All JTs, CRH and Vibrating feeder
System(Please Ref. DBR-IS-4- discharge at ERH in CHP and LHP
DC-713-110-M053)
d Mechanical dry MCC Rooms
Pressurization System
(Please ref DBR-
IS-4-DC-713-110-M050)
e Propeller type exhaust fan Battery room
f Air-condition System (Split CHP Main control room consisting of control desk
Type) and DCS panel, CHP other MCC DCS RIO panel
(Please ref DBR- rooms, operter cabin at crusher house and
IS-4-DC-713-110-M051) travelling tripper floor, Wagon tippler control room,
Stacker operator cabin.
g Dust extraction system Crusher house in CHP & LHP
h Bunker dust extraction At bunker roof for bunker cells
system
(Please ref DBR-
IS-4-DC-713-110-M054)
I Service water system Conveyor galleries, JTs, Crusher house, WT hopper
(Please ref DBR-IS-4-DC-713- area and conveyor tunnels, Pump house, tripper
110-M052) floor, MCC rooms
J Potable water Tank MCC rooms, control room, JTs, ST, Pump House,
(Please ref DBR-IS-4-DC-713- Tripper floor and crusher house
110-M052)
K Service air One point at each following building:
(Please ref DBR-IS-4-DC-713- WT complex, Tripper floor Crusher House and JTs.
110-M052)
L CHP/LHP/GHP operation hrs Annexure-3
2
The proposed CHP/LHP/GHP will also be provided with safety switches for conveyor, necessary
instrumentation and control system for sequential operation, illumination of conveyor galleries /
tunnels, transfer points, crusher house, reclaim hoppers etc.
2.0.1 The major equipment for the coal handling plant are listed below:
The major equipment for the LHP & GHP are listed below
Note:- Any other associated equipment/ items/ item of work required for successful completion,
installation, and operation of the CHP, LHP & GHP package shall be under scope of BHEL.
1
2.0.3 Buildings we have considered for FGD:
SLNO DESCRIPTION QTY UNIT
1. Reclaim hopper complex 1 No.
2. Shed for reclaime hopper complex 1 No.
3. Storage Shed for Limestone 1 No
4. Storage shed for gypsum 1 No
5. CONV. 1A/B WITH TUNNEL & Gallery 1 No.
6. CONV.2A/B WITH GALLERY 1 No.
7. CONV.3A/B WITH GALLERY 1 No.
8. CRUSHER HOUSE FOR LHP 1 No.
9. PENT HOUSE FOR CONV. NO. 1A & 1B 1 No. 1
10. RANSFER POINT (TP)-1 1 No.
2.0.4 The Scope of work covers Design, Engineering, Manufacturing, Supply, Delivery to site,
unloading, storage & security at site, Local transportation at site, Erection and
Commissioning, and PG Test of CHP is not limited to the following, including Mechanical,
Civil & Structural, Electricals, and Control & Instrumentation.
2.0.5 Sump pumps (1W+1S) will be provided at W.T complex, (1W+1S) at JT-1, (1W+1S) at JT-12
and (1W+1S) at ERHC of each having capacity 40CMH and discharge head of 30mwc to
handle Coal particle in slurry form and to discharge the same to the nearest drain along
with necessary piping with fittings. 8 Nos (4W+4S) of Sump Pump for each Coal stock piles
will be provided. 1
2.0.6 Two (02) Nos. of Rotaside, Side Discharge Type Wagon Tippler with side arm charger with
capacity to haul 60 loaded Wagons at a time, shifter and pusher.
1
2.0.7 Travelling tripper will be provided with two way chute (i.e. one side discharge and one
central discharge).
2.0.8 Coal Chutes details: Parent plate for transfer Coal will be 20mm thick SAILHARD/ Equal.
The minimum side plate angle of chutes will be 60 degree from horizontal. Discharge hood
of head pulley will be of 5mm thick M.S. (IS2062) with neoprene rubber curtain [minimum
10thk]. Direct impact of material on conveyor or belt will be avoided by providing an
inclined surface at the feeding point to guide the material in the direction of belt travel. In
chute layout - inspection door, poking holes etc. shall be provided suitably and the
discharge chute shall enclose the snub pulley.
2.0.9 Tramp iron chutes and collecting trolley for ILMS. WhereILMS is provided, chute made out
of non magnetic material (parent plate) of minimum 10mm thk SS-304 steel for a distance
of 1.5m [minimum] from magnet face shall be provided.
2.0.10 Suitable coupling guard will be provided for the drive arrangement of all equipments
covered under the scope of work including belt conveyors / trippers / crushers /screens /
Stacker and Reclaimer etc.
2.0.11 Three (03) No. Elevator rope.& sheave type (Goods cum Passenger) of 2000 kg capacity
with adequate number of landings at crusher house, JT-6 and JT-7.
2.0.12 Pump house and over ground water tank with effective capacity of one hour of total flow
requirement for dry for dust suppression and half an hour for plain water DS & service
water.
2
2.0.13 Coal Run-off pit pump of CSSP
2.0.14 Crossovers has been considered in conveyor galleries at approx. 100m distance.
a. For Surfaces
Primer coat: 1x75 micron DFT
Intermediate coat: 1x100 micron DFT
Finishing coat with Acrylic Aliphatic P.U. Paint(Full Glossy): 2x50 micron DFT
The total minimum DFT will be 275 micron.
b. Surfaces structural steel items / components fabricated at Workshop
Primer coat: 1x75 micron DFT
Intermediate coat: 1x100 micron DFT
Before dispatch to site one coat with Acrylic Aliphatic P.U. Paint(Full Glossy): 1x50
micron DFT
Post transport to site and erection at site one coat with Acrylic Aliphatic P.U.
Paint(Full Glossy): 1x50 micron DFT
The total minimum DFT will be 275 micron.
2.0.16 Consumables like lubricants; oils etc for initial fill, flushing, cleaning, refill and topping up
to for a period of six (6) months from the date of handing over of coal handling plant as per
Vol-III, Chapter-19 of Coal Handling System.
2
2.0.17 Finished Grade Level of CHP buildings
The finished grade level of JT-5, JT-6 and JT-7 in Power Block area is R.L. = 125.80 M.
The finished grade level at CHP area is R.L.= 126.00 M.
The finished grade level of WT-1&2 and TP-1 is R.L.= 126.00 M.
The finished grade level of Reclaim Hoppers is R.L.= 126.00 M
3.0.0 EXCLUSIONS (as per Tender Specification and subsequent resolution/ correspondence
and BHEL internal scope division):
The following supply and services are excluded from our scope of work.
a) Locomotive shed.
b) Locomotives
c) Wagons
d) Any type of boundary wall.
e) Illumination of railway yard
f) Railway Track except WT table, SAC, shifter & pusher .
NOTES:
1 Minimum six (6) impact idlers are considered at every feeding point with maximum
400mm spacing.
2 Self Aligning return idler will be provided for conveyors at every 30Meters.
Type of Carrying Return Impact Transition Self Aligning Self Aligning
Idler 2 Carrying Return
Roller 152.4mm 139.7mm 190mm 152.4mm 152.4mm 139.7mm
diameter D.D.
3 139.7mm 3
tube
No. of 3 1 3 3 3 1
Rolls
Angle of 35 deg. 10 deg. 35 deg. 35 deg. 35 deg. 10 deg.
Troughing
Max. 1200mm 3000 mm 400 mm As per 12000 mm & 30000mm &
Spacing (600mm in the (1500mm CEMA 5th 5000mm 10000mm
mm region of convex in the edition from either from either
Curve) region of ends. ends.
convex 0
Curve)
4.06.00 Hopper Chutes & Skirt Board
General Information
Material Handled Coal
Bulk density for volume calcn. 0.8 T/Cu.M.
Bulk density for weight calcn. 1.2 T/Cu.M.
Lump Size (-) 300 mm, (-) 20 mm, as applicable.
Belt Width 1400 mm
Maximum Moisture Content 15% (max)
Flow Rate (Rated/Design) 1500/1650 TPH.
Belt Speed (Approx.) 3.2 m/sec.
Pulley Dia As per IS/Manufacturer.
Pulley Width Belt Width + 200 mm 2
Minimum Valley angle 60º.
Rack EN-8/equal
Pinion EN-9/equal
Drive Shaft EN-8
Bearing
Type Dust-tight anti-friction bearing
Life 50,000 hours (Min.) (L-10)
Method of lubrication Single shot, pressure Lubrication.
Electromagnet Belt
Drive Unit Geared motor of Adequately sized with 10%
margin.
Belting EP type FR Garde complete with built- in ribs and
zero speed switch
Pan Size
a) Screen area a)Min. 0.75 sq m per 100TPH feed
b) Pan width b)To match with crusher rotor length without
deflector plates
Bearings
a) Type a)Double spherical roller suitable for vibrating
b) Lubrication screens.
c) Life b)Grease
c)8000 hours minimum
Liners on solid deck
-Type Replaceable
-Thickness 16 mm minimum
Capacity adjustment Not required.
Material of Construction:
i) Solid deck ST – 42, IS:2062
ii) Liner plates SAILHARD/ TISCRAL or superior wear resistant
plate
ii) Grizzly Screen Plates. SAILHARD/ TISCRAL or superior wear resistant
plate
iii) Support Springs. Spring Steel (Helical only)
ii) Shafts Forged Steel
4.22.00 Ring Granulator
General Information
Quantity Four (4) nos.
Material to be crushed ROM Coal
Stability Factor:
a) For operating condition with max. 1.3
operating
wind velocity
b) For non-operating condition with 1.2
max. non-operating
wind velocity
Max. Wheel Load permissible with 275 KN
impact
Carriage:
a) Supporting Arrgt. Three Point support system with 4 corners to
take-up irregularity of track as per specification.
b) Long Travel Speed 0 - 40m/min A.C sq. cage VVFC. Peak speed shall
be used for travelling one end of the stockpile to
other While stacking the speed shall be limited to
0 – 20 m/min. 1
slewing speed, 0-0.2 rpm (Hydraulic) or 150 starts/hr (electric
3 drive )
luffing range (approx.), +11° above & -11° below horizontal 1
luffing speed, 3m/min @centre line of Bucket Wheel
1
wheel diameter (min.) 630 mm (Tread dia.)
Primary Sampler -
i) Type Swing Hammer Type collecting sample
ii)No of Cuts per Hours Not less than 20 [per conveyor].
iii)Cutter opening Min 100mm
iv) Material SS-304
v) Quantity 2 Nos.
vi) The cycle time will be adjustable yes
through timer.
Primary Sample Belt Feeder
i) Type Reversible
ii) QTY 2 NOs per set
Iii Belting Standard duty x 315/3 x EP belt, Covers: 3mm
topx1.5mm bottom, F.R grade. Belt Width = To
suit capacity , Speed (VARIABLE) : To suit
iv)Idler 63.5 mm OD x 3.65 thk x ERW tube(IS:9295) x 20Ф
bright bar shaft, life lubricated design x deep
grooved ball bearing having Bearing life (L-10) of
minimum 60000hrs.
v)Pulley 5mm thk(min) shell (MS, IS:2062) x EN-8 shaft
with antifriction bearings having Brg. life (L-10) of
minimum 60000hrs.Neoprene rubber lagged head
and tail pulley, lagging thk; 6mm thk (minimum).
Shaft/ hub connection: key fitted.
vi) Can requirement 2 NOs per set
vii) Capacity As per system requirement 1
viii) Belt width & speed During detail engineering
xi) Components During detail engineering.
Sample Crusher -
A) Crushed (as fired) feed coal size (-) 20 mm
B) Output Size 100% (-) 6mm and 95% (-)8 mesh/ As per ASTM.
i) Type Impact type hammer mill /equal, single stage
crushing required
ii) Capacity 0.5 T/Hr
ii) Frame M.S.
iv)Drive V-belt drive & electric motor including Suitable
vibration isolation system
1
vi) The product output size will be adjustable type.
vii) Capacity As per system requirement.
Clamping arrangement of wagons Hydraulic and suitable for all types of wagon,
considering different height and length of wagon
without changing the attachment physically.
Mode of control Semi-automatic/manual, PLC control for remote
operation & control shall be provided.
Lubrication Arrangement. Motorized group Lubrication system of proven
design shall be provided.
EOT Crane 20 T/6.3 T EOT Crane common for both W.T.
4.29.00 Side Arm Charger
Type Rail Mounted, Rack & Pinion Type
Quantity Two NOs
Type of Drive Hydraulic motors (operated by Power Pack)
driving a set of pinions onto ground drive rack.
Hauling Capacity 60 Nos. wagon, each having gross wt. of 140 t
Operating Speed (Forward & Forward: ~ 0.6 m/s (To Suit) ; Reverse: ~1.2 m/s
Reverse) (To Suit)
Travel Brake EHT brake
Spacing
Carrying idlers 1.2 m (0.6 m for convex curves and in the paddle
feeder travel range).
Return idlers 3.0 m (for convex curves not more than 1.5 m.)
Loading point Minimum six (6) with 400 mm spacing.
Self-aligning troughing idlers At 10 m distance from head & Tail pulleys with
intermediate spacing 15m
Self – aligning return idlers At 10 m distance from Head & Tail pulleys with
intermediate spacing 20m. (Not required for
conveyors more than 400m c/c long where 2
roll return idlers are provided).
Bearings
Carrying Ball Bearings of deep groove type or seize
resistance type of min. 35 mm size, lubricated for
life.
Return Ball Bearings of deep groove type or seize
resistance type of min. 25 mm size, lubricated for
life.
Material
Roller ERW Steel tube min. wall thickness 4.0 mm
CHUTES:-
Min. angle 60 deg
Cross section Square/rectangular with rounded corners.
=0.895m2
Cross section of chute assumed
Length of chute L = 1m
Width of chute W = 1m
Area = 1m²
which is more than 5 times of material cross sectional area
=0.075m2
Cross section of chute assumed
Length of chute L = 0.6m
Width of chute W = 0.5m
Area = 0.3m²
which is more than 4 times of material cross sectional area
of conveyors
l. CAN/ CASA- Canadian Standard Association.
M422M87:
Total power consumption path-wise at 1500 TPH capacity is required at the input terminals of
drive motors of the following equipment at the rated capacity performance requirements.
For calculating power consumption path-wise all Conveyors, Belt Feeders, Wagon Tippler, Apron
Feeder, Vibrating Grizzly Feeder, Crushers, Magnetic Separators, Stacker Cum Reclaimer, as
applicable connected to one stream are considered. Paths are defined as mentioned below:
Flow Path 1 From Wagon Tippler to Boiler Bunker through TBC-1A or 1B.
(Direct Stream)
Flow Path 2 From coal piles 1 & 2 to furthest Boiler Bunker via Stacker Reclaimer on
Flow Path 4 From Wagon Tippler to crushed coal stock piles CCS#1 & 2 through
(Stacking Stream) Stacker-Reclaimer on YBC-1B with Stacker at extreme position.
Flow Path 5 From Wagon Tippler to crushed coal stock piles CCS#2 & 3 through
(Stacking Stream) Stacker-Reclaimer on YBC-1A with Stacker at extreme position.
At the outlet of the dust extraction system, the dust concentration shall not exceed 50mg/Nm3.
Coal handling plant for 1X660 MW Panki Thermal Power Station of Uttar Pradesh Rajya
Vidyut Utpadan Nigam Limited (UPRVUNL) proposed plant as described in the NIT specs.
Salient features of the Project site are,
Stockpile-CHP
Inputs CCS#1 CCS#2 CCS#3
Total length of stock pile at base L MTRS. 230 230 170
Total width of stock pile at base B MTRS. 35 54 35
Angle of repose of stock pile (coal) DEG 37 37 37
Height of stock pile H MTRS. 12 12 12 1
Density of Coal in (Compacted coal) T/ cu. M 0.8 0.8 0.8
No. of stock Piles Nos. 1 1 1
Calculations
Length (a) a MTRS. 15.92 15.92 15.92
Length (b) b MTRS. 3.15 22.15 3.15
Length (c) c MTRS. 198.15 198.15 138.15
1. Calculation of Volume for 'A' Portion
Where, A = A1 + A2 + A3 + A4
V1 = Total volume of A (i.e cone) is given
as, = (1/3 xΠ x a² x h)
V1 in Cu.M 3186.72 3186.72 3186.72
2. Calculation of Volume for 'B' Portion
Where, B = B1 + B2
V2 = Total volume of B is given as, =
2x(1/2 X (a x b) x h )
V2 in m³ = 602.12 4232.92 602.12
3. Calculation of Volume for 'C' Portion
V3 = Total volume of Trepezoid C is given
as, = (B + b)/2 x h x c
V3 in m³ = 45357.85 90536.26 31623.51
Then,
Total Volume of Stockpile = V1 + V2 + V3 49146.69 97955.89 35412.35