B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

I. SWIMMING POOL

1. Balancing Tank Sizing

Area:

Swimming Pool = 102.1 m2

Volume:

= 102.1m2 x 1.5m (Approximately. Ht 1.5m)


= 153.15m3

Bathing Loads:

< 1.5 m deep : 1.394 m2/person


> 1.5 m deep : 1.819 m2/person

Total number of bathers = 75 Persons

Amount of Displaced Water = Wave Displacement + Bather Displacement

a. Wave Displacement = Pool Area x 0.02 m


= 102.1 x 0.02 m
= 2.04 m3

b. Bather Displacement = No. of bathers x 0.05 m3/p


= 75 x 0.05 m3/p
= 3.75 m3

Total Required Volume = 2.04 + 3.75


= 5.79 m3
+ 10% = 6.34 m3

Balancing Tank = (3.0 x 1.5 x 1.5 Depth)

2. Filter Calculation

Total Volume = 153.15 m3

Turnover Rates:
Pool = 6 hrs.

153.15 m3
Total Q =
6 hr
= 25.53 m3/hr
= 425.5 L/min
Say 425.5 L/min (112.4 GPM)

1 of 4
B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

Using 4-pump systems


(3-nos. pump duty; 1-no. standby)

Filter Pump = 141.83 L/min (37.47 GPM)


≈ 8.51 m3/h

Compute for TDH

1.Min.Residual - 15 psi. 34.65 ft.


2.Diff.Pressure - 20 psi. 46.20 ft.
3.Static Head - 4m 13.12 ft.
4.Head Loss due to friction -

4.1 Length of pipe 100m. - 328 ft.

4.2 Fittings – Ø 100 pipe


Quantity Head Loss Sub-Total
(ft)
Elbows 8 14 112
Tee 12 21 252
Gate Valve 7 2.7 18.9
Check Valve 3 22 66
448.90 ft

Friction Head loss Rate = 42.28 ft/1000 ft = 0.04

Total losses at piping = 328 + 448.90 = 776.90 ft

Head loss due to friction = 776.90 x 0.04 = 31.08 ft

TDH = 125.05 ft ≈ 54.13 psi


3.73 bar

Hp 56.2 gpm (125.05 ft)


=
3960 x 0.55

= 7027.81
2,178.00

Hp = 3.23

Based on filter capacity of 37.07 m3/hr/m2

540 gpm
=
158.849 gpm/m2
= 3.40m2 (36.60ft2)

2 of 4
B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

Based on hi-rate filter having an area of 43.0 ft 2


36.60ft2
=
43.0
= 0.851ft2

say = 2.0 nos. 1 filter + 1 spare

3. Back Wash Tank

Vol. = Backwash rate in gpm/ft2 x area of filter in ft2 5 min.


= (20.0 gpm/ft2) (20.0ft2) (5min.)
= 2000 gals
≈ 7.57 m3 (2.5 x 2.1 x 1.5m D)

4. Chlorination

1 lb. of chlorine per 10,000 gals of pool water every 8 hours

Volume of Pool = 153.15 m3

Chlorination ≈ 40457.95gals.

40457.95gals
Chlorination ≈
10,000 gals/1 lb. Chlorine

= 4.05 lbs/8 hrs.


= 0.51 lbs/hrs x 24 hrs/day
= 12.24 lbs/day
Say = 12.5 lbs/day

Assume 5% strength of solution

Chemical
5 = x 100
(Water + Chemical)

12.5 lbs
5 = x 100
(Water + 12.5 lbs)

Water = 237.5 lbs.

237.5 lbs.
Vol. Of H2O =
62.4 lbs/ft3

= 3.81 ft3

3 of 4
B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

5. Pipe Sizing

Velocity = 4 m/s (max)


Turnover = 6 hrs. (main pool)
25.53 m3/hr.

Required cross sec. Area of suction piping

a. Suction Pipe b. Delivery Pipe

Required cross sec. Area of suction piping

Q = AV 25.53 m3/hr
Area =
25.53 m3/hr = A (4 M/s) 4 M/s x 3, 600
0.00709 m3/s = A (4 M/s) Area = 0.00177 m2
A = 0.00177 m2

Dia,
4 x 0.00177 4 x 0.00177
D = D =
3.1416 3.1416

D = 0.0475 m D = 0.0475 m
D = 47.5 mm = 47.5 mm
Say = 50 mm Say = 50 mm