1 ALH-202 133.680 NEED ISOLATED GIR WITH SOIL REPLACEMENT/S.B.C REQUIRED AT LEAST REACH TO (12T/M2)
4 ALH-237 348.740 FIRST PREFERENCE NEED RAFT GIR WITH SOIL REPLACEMENT/(S.B.C REQUIRED AT LEAST REACH TO (12T/M2 TO 13T/M2)/SECOND PREFERENCE PILE GIR UPTO HARD STRATA
5 ALH-248 417.700 NEED RAFT GIR WITH SOIL REPLACEMENT/S.B.C REQUIRED AT LEAST REACH TO (12T/M2 TO 13T/M2)
6 ALH-254 454.917 NEED RAFT GIR WITH SOIL REPLACEMENT/S.B.C REQUIRED AT LEAST REACH TO (12T/M2 TO 13T/M2)
7 ALH-250 432.905 FIRST PREFERENCE NEED RAFT GIR WITH SOIL REPLACEMENT/(S.B.C REQUIRED AT LEAST REACH TO (13T/M2 TO 14T/M2)/SECOND PREFERENCE PILE GIR UPTO HARD STRATA
8 ALH-260 497.720 OUR ACTUAL CHAINAGE IS 497.720 INSTEAD OF 497.760 SO DO NECESSARY ACTION