Hamburg Facilities of MAN Diesel & Turbo SE: Key Figures (2011)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

Hamburg Facilities of MAN Diesel & Turbo SE

Key figures (2011):


Incoming orders:
ca. 118 Mio. EUR
Employees: ca. 342
MAN Diesel & Turbo SE < 1 >
MARC Turbo-Generator Program

Modular
ARrangement
Concept

MARC 1 MARC 2 MARC 4 MARC 6

terminal output terminal output terminal output terminal output


1.5 to 3.5 MWel 4 to 10 MWel 9 to 20 MWel 16 to 40 MWel

flange diameters flange diameters flange diameters flange diameters


live steam: 125 live steam: max 200 live steam: max 250 live steam: max 300
exhaust: max 700 exhaust: max 1200 exhaust: max 1500 exhaust: max 2400

max live steam max live steam max live steam max live steam
65 bar(a) / 450 °C 90 bar(a) / 520 °C 120 bar(a) / 520 °C 120 bar(a) / 530 °C

12,000-14,000 rpm 10,000-12,000 rpm 7,000-10,000 rpm 5,000-7,000 rpm

MAN Diesel & Turbo SE < 2 >


Modular Arrangement Concept

Supervision cubicle Generator


Steam Turbine
C-10 C-01 H-00

Control oil module

Lubrication oil
Turbine drainage
module
system
MAN Diesel & Turbo SE < 3 >
Reference Installation Oberpullendorf

Turbo-Generator MARC 1-C02


Location Oberpullendorf / A
Customer Ortner
Operator Ortner
Scope of Supply turbo-generator
Application biomass
Year of Installation 2007

Technical Data
Inlet Pressure 27 bar(a)
Inlet Temperature 450 °C
Inlet Flow 10.1 t/h
Exhaust Pressure 0.1 bar(a)
Power Output 2,330 kWel
Speed 13,000 min-1

P-900168

MAN Diesel & Turbo SE < 4 >


Reference Installation Dinslaken

Turbo-Generator MARC 1-H01


Location Dinslaken / Germany
Engineering Seeger Engineering
Customer/Operator Stadtwerke Dinslaken
Scope of Supply turbo-generator +
re-cooling plant
Application biomass
Year of Installation 2007

Technical Data
Inlet Pressure 46 bar(a)
Inlet Temperature 460 °C
Inlet Flow 13 t/h
Exhaust Pressure 0.8 bar(a)
Power Output 2,500 kWel
Speed 14,000 min-1
P-900179

MAN Diesel & Turbo SE < 5 >


Reference Installation Sachsenburg

Turbo-Generator MARC 2-C10


Location Sachsenburg/Austria
Engineering Seeger Engineering
Customer/Operator Hasslacher Energie
Scope of Supply turbo-generator +
sec. cooling cycle
Application biomass
Year of Installation 2007

Technical Data
Inlet Pressure 64 bar(a)
Inlet Temperature 480 °C
Inlet Flow 25.3 t/h
Extraction Pressure 2.0 bar (a)
Exhaust Pressure 0.16 bar(a)
Power Output 6,040 kWel
P-900173
Speed 11,200 min-1
MAN Diesel & Turbo SE < 6 >
Reference Installation Falun

Turbo-Generator MARC 2-H02


Location Falu / Sweden
Customer Kvaerner Power
Operator Falu Energi & Vatten
Scope of Supply TG + condenser
Application biomass
Year of Installation 2006

Technical Data
Inlet Pressure 70 bar(a)
Inlet Temperature 500 °C
Inlet Flow 38 t/h
Exhaust Pressure 0.65 bar(a)
Power Output 8,730 kWel
Speed 11,200 min-1 P-900118

MAN Diesel & Turbo SE < 7 >


Reference Installation Kösching

Turbo-Generator MARC 4-C13


Location Kösching / Germany
Customer Binder Holz Deutschland
Operator Binder Holz Deutschland
Scope of Supply turbo-generator
Application biomass
Year of Installation 2007

Technical Data
Inlet Pressure 95 bar(a)
Inlet Temperature 495 °C
Inlet Flow 60.5 t/h
Extraction Pressure 1.7 bar(a)
Exhaust Pressure 0.11 bar(a)
Power Output 15,070 kWel
Speed 8,600 min-1 P-900175

MAN Diesel & Turbo SE < 8 >


Reference Installation Fechenheim

Turbo-Generator MARC 4-C12


Location Frankfurt / Germany
Customer MCE group
Operator Mainova (utility)
Scope of Supply turbo-generator
Application biomass
Year of Installation 2004

Technical Data
Inlet Pressure 65 bar(a)
Inlet Temperature 450 °C
Inlet Flow 52.7 t/h
Extraction Pressure 11.8 bar(a)
Exhaust Pressure 0.11 bar(a)
Power Output 13,060 kWel
Speed 8,600 min-1 P-900075

MAN Diesel & Turbo SE < 9 >


Reference Installation Burtonville

Turbo-Generator MARC 4-H02


Location Burtonville / Belgium
Customer Industrie du Bois Vielsalm
Operator Industrie du Bois Vielsalm
Scope of Supply turbo-generator +
2 heating condensers
Application biomass
Year of Installation 2007

Technical Data
Inlet Pressure 64 bar(a)
Inlet Temperature 480 °C
Inlet Flow 90 t/h
Exhaust Pressure 1 0.91 bar(a)
Exhaust Pressure 2 0.59 bar(a)
Power Output 20,040 kWel
Speed P-900180 8,500 min-1
MAN Diesel & Turbo SE < 10 >
Reference Installation Hamburg
Turbo-Generator MARC 6-C03
Location Hamburg / Germany
Customer Prokon Nord
Operator MVB Müllverwertung Borsigstraße GmbH
Scope of Supply turbo-generator
Application biomass
Year of Installation 2005

Technical Data
Inlet Pressure 89 bar(a)
Inlet Temperature 520 °C
Inlet Flow 90 t/h
Exhaust Pressure 0.11 bar(a)
Power Output 23,130 kWel
Speed 6,000 min-1
P-900078

MAN Diesel & Turbo SE < 11 >


Reference Installation Hengelo

Turbo-Generator MARC 6-C03


Location Hengelo / The Netherlands
Customer Standardkessel Lentjes
Operator Twence Afvalverwerking
Scope of Supply turbo-generator
Application biomass
Year of Installation 2007

Technical Data
Inlet Pressure 66 bar(a)
Inlet Temperature 460 °C
Inlet Flow 79 t/h
Exhaust Pressure 0.09 bar(a)
Power Output 21,000 kWel
Speed 6,000 min-1 P-900158

MAN Diesel & Turbo SE < 12 >


Reference Installation Alkmaar

Turbo-Generator MARC 6-C04


Location Alkmaar / NL
Customer HVC Alkmaar
Operator HVC Alkmaar
Scope of Supply turbo-generator
Application biomass
Year of Installation 2007

Technical Data
Inlet Pressure 88 bar(a)
Inlet Temperature 500 °C
Inlet Flow 101 t/h
Exhaust Pressure 0.1 bar(a)
Power Output 28,920 kWel
Speed 5,700 min-1 P-900174

MAN Diesel & Turbo SE < 13 >