EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
Pressure relief valves shall be installed on all knock out drums in SAES-K-403,
A3
accordance with SAES-J-600. Para. 6.5
The extension piping (inlet pipe) of the relief valve shall be kept to the
SAES-K-403,
A4 minimum length possible, and provided with welded gussets at the
Para. 6.5
attachment to the vessel.
Suction piping downstream of the suction drums and pulsation
suppression devices of compressors operating at or within 5°C of the gas
SAES-K-403,
A5 saturation temperature shall be heat traced, either with steam,
Para. 6.6
electrically or a heat transfer fluid, and insulated to ensure that
condensation of liquids does not occur.
Page 1 of 2
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Reciprocating Compressor Suction and Discharge Process
SAIC-K-2026 25-May-05 MECH-
Piping
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
For hydrogen service (molecular weight less than 12), all block valves SAES-K-403
A14
shall be of the double block arrangement Para 6.15
All vent lines to flare shall include a check valve to prevent the possibility SAES-K-403
A17
of reverse flow from the flare header. Para 6.19
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-K-403 -- Reciprocating Compressors, (30 June, 2003)
Page 2 of 2