2.0 OBJECTIVE
3.0 PROPOSAL
8.0 METHOD
10. APPENDICES
a) DRAWINGS
b) LOG SHEET
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
2.0 OBJECTIVES
3.0 PROPOSAL
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
8.0 METHOD
8.2 PREPARATION:
8.3 PROCESS
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
8.8 Trial run the motor for 2 hours and couple with the
pump.
8.15 Trial run the pump for 4 hours and maintain the
tank level keeping the pump stroke around 50%.
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
LOG SHEET
Date:
PROJECT :
UNIT :
ACTIVITY:
Signatures
JPL BHEL
Station: JPL, Tamnar JPL Reference no:
Sheet 1 of
Stage II: (4X600 MW) Boiler/Comm./032
Plant Area: Boiler
Signatures
JPL BHEL