KMV PROJECTS LTD

CHECKLIST FOR QUALITY CONTROL


ACTIVITY : SOLING

Project : Date :
Location :

NOTE : Please mark as y for yes or n for no in the appropriate box or enter readings as per requirements
SL . NO. To be checked YES NO Remarks /clarifications
1 Name,date and number of the drawing
PRE - EXECUTION CHECKS
Area to be soled is levelled , rammed/well
2 compacted [ ] [ ]
safety measures for the neighbouring
3 activities [ ] [ ]
Check During Execution
4 Aggregate gradation ok [ ] [ ]
suitability of aggregate to carry the
5 intended load [ ] [ ]
point of height indicator installed , depth
6 of soling adequate [ ] [ ]
The voids between the soling stones are
7 filled with quarry dust
8 Level of soling is maintained

Contractor's Site Engineer's signature


Contractor's QA/QC Site Engineer's signature or remarks if any

Client's representative's signature or remarks if any