Tap Change Bolt Steel Bolt: No. List of Item To Be Checked
Tap Change Bolt Steel Bolt: No. List of Item To Be Checked
4 The distances required for transformer cooling have been respected on all sides
5 The transformer room is clean and not liable to flooding
6 The room is properly ventilated, with a clean air inlet at the bottom of the wall and an outlet at the top
7 The plastic cover remained in place up to commissioning day
8 There is no condensation or foreign bodies on the transformer (dust, greasy substances, conducting particles...)
9 Energised parts are at the minimum required distance from surrounding exposed conductive parts.
10 The MV and LV cables are supported, and are at the correct distance from the MV windings
12 The connection to the transformer's LV bars includes flexible leads, which are not subjected to mechanical stress
14 There are no breaks or short circuits in the temperature sensor circuit
15 The temperature sensors are correctly connected to the temperature controller
16 The temperature controller is correctly connected to the control panels, tripping sequences are set and checked
17 The fans and their related relay circuit are working properly
18 The overload protection devices on the HV or LV side have been set
Result
YES NA
HV / LV
MΩ
.m]
ue
YES NA
YES NA
YES NA
YES NA
YES NA
cles...) YES NA
YES NA
YES NA
YES NA
al stress YES NA
YES NA
YES NA
hecked YES NA
YES NA
YES NA