Area Hard Barrication Jsa
Area Hard Barrication Jsa
Location:-
Date :
ELCB and proper fuse in main supply board to be there. only approved scaffolds to
be used for working at height ,Trained persons to be deployed at work competent
supervisor to be present at all time during hot work activities.
Use of good insulation of welding supply & erecting cable.
Joint free cable to be used
Inspected welding machine to be used
Hot work permit to be taken from concern project and safety dept.
Proper earthling to job and welding machine.
Proper access & platform shall be provided.
Remove all flammable & combustible materiel from work area.
Fire extinguisher to be kept available near by working area.
Safety shoes, safety helmet, safety goggle, Reflective jacket, cotten hand gloves,
FBSH to be used. Area under working to be properly cordoned off.
Ensure unauthourised entry, ensure safe distance between man and Farana
Ensure TPI inspected cherrypicker should be used for height work
Before lifting of material with lifting equipment supervisor inspect all tied slings are
in proper way,then only material to be lifted.
Inspectd self tapping screw m/c used
Ensure proper anchorage point and lifeline for height work
No person stand below the lifted load Precautaions to be taken to prevent load swing.
Tied with guide rope