NEBOSH International General Certificate

in Occupational Health and Safety

GC3: HEALTH AND SAFETY PRACTICAL APPLICATION

Student Name: SANTHA KUMAR M

Student Number: 00434083

Date of Submission: 6th July 2018


GC3 – The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) SANTHA KUUMAR M

Signature _________

Date 06/07/2018

For completion by a course provider representative (e.g. internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise that
contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out
in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

NB: This declaration must be completed in full submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.
INTERNATIONAL GENERAL
CERTIFICATE Assessor’s marking sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Date of practical application Name of assessor

Course provider Course provider


1446 Gulf Academy Of Safety
number name

Student number 00434083 Student name SANTHA KUMAR M

NEBOSH
Maximum
Assessor’s moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 timescales
15

2 Report - Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 area
5

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of international


3.2 standards
5

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 improve health and safety in the chosen area
15

TOTAL MARKS 100


Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessor’s signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters) _________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderator’s comments:


INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 5 of 25

Student name: SANTHA KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro Construction
& Mining Machinery Limited. Date of inspection: 03/07/2018

Observations

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

1) Impact Hazard Immediate Action 1 Hour


The Backhoe Loader was working Barricade the area and provide
too close to the pedestrian pathway necessary warning signs.
at the construction site.

Consequences Long Term Action 2 Hours


The people walking in the pathway Change the pathway for pedestrians.
may get hit by the arm of the
backhoe loader.
2) Biological Hazard Immediate Action 1 Hour
Presence of Stagnant Water near the Drain the water immediately from the
storage area due to rain. site in case of stagnant water.

Consequences Long Term Action 1 Week


Bacterial infections like Provide proper pathway or road
Legionellosis, LeptoSpirosis and condition to avoid stagnant water.
mosquito Borne diseases can
spread.
3) Slip and Trip Hazard Immediate Action 10 Minutes
Poor Lighting facility in the office Provide temporary lighting in the
room pathway. area and keep warning signs.

Consequences Long Term Action 12 Hours


People may slip and fall and get Provide suitable and proper lighting
injuries and fracture due to lack of according to the area.
visibility.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 6 of 25

Student name: SANTHA KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection: 03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
4) Vehicle Hazard Immediate Action 5 Minutes
Driver was driving the vehicle at Stop the vehicle and replace the
high speed inside the warehouse. driver with competent person.

Consequences Long Term Action 1 Week


Chances of hitting nearby structure, Provide necessary training, provide
people, stacks, etc. information.
5)Entanglement Hazard Immediate Action 20 Minutes
The coal conveyer machine in the Barricade the area and provision of
mining area had no protective guard proper work dress to the workers.
and workers were working near the
conveyer.

Consequences Long Term Actions 1 Week


Entanglement of loose clothes, Provide proper guards to the
loose hair, etc with the rotating conveyer avoid the entanglement
parts and draws the worker onto it. hazard.
6)Fire Hazard Immediate Action 1 Hour
Presence of obstacles like broken Remove the obstacles from the
wood, damaged and unused pathway.
machineries in the 3rd emergency
escape route of the industry.

Consequences Long Term Action 3 Hours


In case of fire the workers and Maintain proper housekeeping.
vulnerable group people feel Dispose the unwanted materials in
difficult to use or cannot use the the disposal area.
escape route and they may be in
great danger due to fire.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 7 of 25

Student name: SANTHA KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection: 03/07/18

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
7)Falling Hazard Immediate Action 5 Minutes
The manhole was open in the Close the manhole as soon as
pathway to the eating area. possible.

Consequences Long Term Action 1 Hour


People who might have not noticed the Barricade the area and provide necessary
manhole have a greater chance of warning signs in case of any work in
falling inside the manhole and take sewer.
severe injury, fracture and fatality.

8)Entry Of Hazards Substance Immediate Action 10 Minutes


Worker from the cleaning Clean the wound with antibiotics and
department working with the open cover the wounds with bandage.
wounds in the waste disposal area.

Consequences Long Term Actions 1 Week


Entry of chemical and biological Provide sufficient time so that the
hazardous substance through open wound will heal.
wound and causes ill-health.
9) Exposure to wooden dust Immediate Action 30 Minutes
Proper ventilation and respiratory Provision of respiratory protective
protective equipment was not provided equipment to the worker.
to the worker working at the carpentry
department.
1 Week
Consequences Long Term Action
Some of the wooden dust causes Provision of ventilation and rest
asthma and hard wood dust can cause intervals.
nose cancer.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 8 of 25

Student name: SANTHAKUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection: 03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
10) Ergonomic ill-health Immediate Action 10 Minutes
A worker was using a brick to insert Provide the worker with the proper work
the nail in the construction area due to equipment.
absence of proper work equipment.

Consequences Long Term Action 3 Days


Use of wrong equipment for a Provide sufficient work equipment with
particular work would lead to work proper design and adjustable work
related upper limb disorder (WRULD). equipment.

11) Trip Hazard Immediate Action 2 Hours


The tiles were broken and there was a Provide proper carpets in the security
damaged carpet in the security room. area.

Consequences Long Term Action 1 Week


Security guards may trip and fall and Fix the damaged tiles and provide
get injured while walking in the area. carpets which are suitable.

12) Electric Hazard Immediate Action 10 Minutes


Found broken switches and broken Provide warning sign boards to avoid
switch box at the eating and resting using the broken switches.
area.

Consequences Long Term Action 1 Day


Broken switch and switch box can give Fix the broken switches and switch box
shock to the workers who are using it. with new and good quality switches and
switch boards.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 9 of 25

Student name: SANTHA KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection:03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
13) Noise Hazard Immediate Action 15 Minutes
Worker using a circular cutting saw in Protecting the receiver with earplug or
the construction site makes more noise. earmuff and PPE.

Consequences Long Term Action 5 Days


Exposure to this noise causes Interrupt the pathway by insulation,
temporary tinnitus and permanent isolation and absorption.
tinnitus and other health effect like
hypertension, headache, fatigue.

14) Good Findings Due to presence of good welfare facility


Presence of welfare facility all around workers can be safe and feel free from
the industries and they are present in hazardous substance.
suitable location.

15) Fire hazard Immediate Action 1 Hour


Found a worker smoking near the Strict action against the particular
storage area. worker and keep necessary warning
signs.

Consequences Long Term Action 1 Week


Smoking can cause major fire accident Provision of separate smoking area for
once it comes in contact with fuel the workers.
sources.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 10 of 25

Student name: SANTHA KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection:03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
16) Vehicle Hazard Immediate Action 1 Day
Found damaged road ways at the main Controlling the speed of the vehicle
entry and exit of industry and absence using traffic warden and safety signals.
of pedestrian platform.

Consequences Long Term Action 5 Days


More chances of overturning of the Fix the road ways with good quality
vehicle and loss of control over the products.
vehicle and collision with the nearby
structure and people.

17) Vibration Hazard Immediate Action 1 Day


Found a worker using the jack Protecting the receiver with PPE.
hammer at the construction area and he Provision of proper resting interval.
is exposed to vibration.

Consequences Long Term Action 3 Days


Vibration can cause severe back pain, Interrupt the pathway by insulating
blood pressure, damages in central materials like anti-vibration mats.
nervous system, circulatory and
digestive problems.

18) Effects of Hot Temperature Immediate Action 10 Minutes


Found few workers working in the hot Provide isotonic drinks, regular rest
sun at the construction site without any intervals to the workers.
cooling jacket.

Consequences Long Term Action 1 Week


Exposure to hot temperature causes Provide shelter, provide training,
dehydration, heat stress, heat stroke, information and instruction about
skin burns. exposure to hot temperature.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 11 of 25

Student name: SANTHAN KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection:03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
19) Ergonomic Ill-Health issue Immediate Action 1 Day
In the designing department room, the Provide rest intervals to the worker and
computers screen cannot be adjusted reduce the exposure to the display
according to the user and the chairs screen.
provided to the users are not height
adjustable chairs and the chair has no
footrest.

Consequences Long Term Action 1 Week


Due to non-adjustable display screen Provide Proper seating facility and
people will get eye problems and adjustable screen. Conduct regular eye
stress. No proper blood circulation to test.
the legs due to absence of footrest. The
chairs which are used can cause work
related upper limb disorder (WRULD).

20) Manual Handling Hazard Immediate Action 15 Minutes


The workers are not maintaining the Provide mechanical aids to the workers
correct posture while carrying the load to reduce the work efforts.
from the brick storage area at the
construction site.

Consequences Long Term Action 1 Week


Not maintaining the proper posture Provide necessary training, information
may lead to severe back pain, hernia and instruction to the workers. Increase
and work related upper limb disorder number of workers.
(WRULD).
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 12 of 25

Student name: SANTHA KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection:03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
21) Lack Of Security System Immediate Action 2 Days
Absence of CCTV cameras at the Provide temporary security guard around
perimeter fencing of the construction the fencing area.
area.

Consequences Long Term Action 1 Week


Unauthorized people may enter into Provide the fencing area with good
the construction site. CCTV cameras.

22) Fire Hazard Immediate Action 2 Hours


Absence of fire detectors and fire Do not allow any ignition source to enter
alarm at the mining machines service into the area.
area.

Consequences Long Term Action 5 Days


In case of fire the people may not Provide fire detectors and fire alarms in
know the hazard and they may in great the area.
danger of getting exposed in fire.
23) Collapse Of Scaffolding Immediate Action 30 Minutes
The scaffolding used at the Barricade the area and remove the
construction site was very old and it excessive weight from the scaffolding.
was over loaded with materials.

Consequences Long Term Action 1 Week


At any time the scaffolding may break Buy a new and good quality scaffolding
and can collapse. The materials falling and never over load the scaffolding.
from height can cause serious injury to
workers working below and fall of
men from the scaffolding.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 13 of 25

Student name: SANTHAKUMAR Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection:03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
24) Good Findings Immediate first-aid can be done to the
Presence of First-aid facility for all the workers who gets injured in case of any
department and they were sufficient for accident.
all the workers working in the
department. First-aid facilities were
also there for visitors.

25) Fall From Height Immediate Action 1 Hour


People who were working at the Use the netting system or ask the worker
heights at the construction area were to stop the work temporarily.
using expired safety harness.

Consequences Long Term Action 1 Week


In case of any accident these safety Buy new and good quality safety
harness may fail to protect the worker harness.
and the worker may fall from height
and get serious injury.
26) Damaged Ventilation Immediate Action 15 Minutes
Found a local exhaust ventilation Provide respiratory protective equipment
which was damaged in the mining to the workers.
area.

Consequences Long Term Action 3 Days


The workers working in the mining Fix the damaged local exhaust
area will be exposed to silica and other ventilation and regular heath checks to
solid dust particles. Exposure to silica the workers.
causes silicosis. The silicosis leads to
tuberculosis.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
Sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 14 of 25

Student name: SANTHA KUMAR M Student number: 00434083


Place inspected: Larsen & Toubro
Construction & Mining Machinery Limited Date of inspection:03/07/2018

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
27) Cutting Hazard Immediate Action 30 Minutes
Found some broken glass pieces in the Clean the demolition area and dispose
demolition area. the broken glasses carefully.

Consequence Long Term Action 1 Day


These glass pieces may cut and Provide suitable footwear and cloths to
penetrate into the skin of the workers the workers and provide regular
and it may lead to entry of hazardous inspection.
substance.
28) Hazards of Crane Immediate Action 1 Hour
There was no proper barricade while Barricade the area.
operating the crane in the crane
operation area.

Consequences Long Term Action 2 Hours


The worker who dint notice the Provide necessary warning signs and
operation of crane may enter the area check the load before starting the
and gets exposed to hazards of crane operation.
(i.e) fall of material from crane due to
not securing the load with tag lines.
29) Good Finding It will help the organization to develop.
The relationship between worker and
the organization is good. Workers are
happy to work here.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICAITON
Sheet number 15 of 25

Student name: SANTHA KUMAR M student number: 00434083


Location: Larsen & Toubro Construction
& Mining Machinery Limited Review Date:23/07/2018

INTRODUCTION

 The inspection was carried out in Larsen & Toubro Construction & Mining
Machinery Limited Bangalore, Karnataka. Construction and service of construction
equipments and mining machineries is done here.
 The inspection was carried out on 3rd July 2018. The inspection was carried out from
10 AM to 10:45 AM. The temperature was 30ºC in the industry.
 There were 3 work shift and around 800 people work for 8 hours in a single shift.
About 2400 people are currently working there. There are 4 entrance and 4 exit for the
company.
 The main purpose of the inspection is to identify the possible hazards and give the
suitable control measures to avoid the accident and to protect the workers. Also the
inspection was carried out to comply with the legal requirements and to avoid
financial and property damage.
 Work areas like assembly line, storage area, construction area, mining area, parking
area, service area, office, roadways for the vehicle, packing and shipping area, other
work departments, etc are covered in this inspection.
 Work equipments in the construction site, mining area, and service centre like jack
hammer, drilling machines, hammer, screwdriver, electric sander, spanner, chisel,
grinding machines, metal cutting saw, etc and other work equipments were inspected.
 Mechanical handling and mobile work equipment in the construction area, mining
area and service centre like conveyor, fork-lift, hoist, crane, backhoe loader,
bulldozer, crane, truck, road roller, tractor, etc were well inspected.
 The welfare facilities like drinking water, toilet facility, washing facility, transport,
resting and eating, first-aid, lockers, etc and work environment requirements like
space, seating, ventilation, light, temperature noise, emergency escape routes, etc
were also inspected.
 Several hazards were found while inspecting the industry, so I came up with the
suitable control measures to avoid the hazard before happening.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

GC3 – THE HEALTH AND sheet number 16 of 25


SAFETY PRACTICAL APPLICATION
Student number: 00434083
Student name: SANTHA KUMAR M

Location: Larsen & Toubro Construction


Review Date:23/07/2018
& Mining Machinery Limited

EXECUTIVE SUMMARY

During the inspection I found some major hazards which can be fixed easily and quickly in
order to avoid major accidents in the company. Fixing these hazards will improve the health
and safety in the company.

The men working at the heights of the construction area are using old expired safety harness.
In case of any accident these safety harness will not hold them. Provide them with good
quality and new safety harness.

Obstacles like broken wood, unused machines, damaged wires were found in the
3rd emergency escape route of the industry. Due to presence of obstacles the people mainly
the vulnerable group cannot use the 3rd escape route during fire accident and they will be
exposed to fire. Remove the obstacles and maintain good housekeeping in the escape routes.

I found vehicle travelling at high speed in warehouse which leads to collision with nearby
structure, people and stacking. Take strict action on the driver and only competent person
with valid driving licence must be used.

Also found the absence of fire alarm and smoke detectors in the mining machinery service
area. People may not know the fire hazard and people will get severe injuries due to fire.
Provide fire alarms and smoke detectors in the particular area as soon as possible.

The broken switches were found in the resting and eating areas, while using them they
produce shock to the user. Remove the broken switches and fix new and good quality
switches.

The backhoe loader was operated too close to the pedestrian pathway without any barricade
or signboards and the people were using the pathway. If the arm of the backhoe loader hits
the people it leads to severe injury, sometimes fatality. So change the pathway for pedestrians,
barricade the area and provide necessary sign boards.
INTERNATIONAL GENERAL
CERTIFICATE Candidate report template

GC3 – THE HEALTH AND sheet number 17 of 26


SAFETY PRACTICAL APPLICATION
Student number: 00434083
Student name: SANTHA KUMAR M

Location: Larsen & Toubro Construction Review Date:23/07/2018


& Mining Machinery Limited

MAIN FINDINGS

1) Falling Hazard And Recommendation


While inspecting the safety equipments, I found that the workers working at height of the
construction area are provided with old and expired safety harness. In case of any accidents
due to weather condition or slip and trip, these safety harness may fail to protect the workers
from falling from height. If the worker falls from height he may get serious injuries or fatality.

Breach Of Laws
According to the section 7(A) of the Indian Factories Act 1948.Safety of the worker must be
ensured by installing and maintaining the work equipment in best possible safety conditions.
Tools, equipment, machines, or products used must be organized properly guaranteeing the
safety of workers.

Recommendations And Cost Analysis


Stop the work immediately or do the work with netting temporarily until the new safety
harness arrives. Buy new and good quality safety harness and provide it to the workers to
continue the job without any falling hazard.
Cost of buying new safety harness - Rs 15,000

2) Fire Hazard And Consequence


While inspecting the emergency escape route, the 3 rd escape route in the industry had obstacles
like broken wood, damaged wire unused machineries. In case of fire the people especially
vulnerable group will find it difficult to use the route. So they can’t escape the fire hazard in
correct time and it may lead to severe injuries, fatality.

Breach Of Laws
According to the Section 11 of the 2005 Act. Employers are required to prepare and revise
adequate emergency plans and procedures and provide the necessary measures for fire fighting
and the evacuation of the workplace.

Recommendation and Cost Analysis


Remove the obstacles from the pathway. Provide proper housekeeping in the emergency
escape routes. Dispose the waste materials in the disposal area. Cost for new housekeeping
workers depends upon the salary packge.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

GC3 – THE HEALTH AND sheet number 18 of 26


SAFETY PRACTICAL APPLICATION
Student number: 00434083
Student name: SANTHA KUMAR M

Location: Larsen & Toubro Construction Review Date:23/07/2018


& Mining Machinery Limited

3) Vehicle Hazard And Consequences


Driving the vehicle at high speed by the driver in the warehouse. Due to high speed the vehicle
may hit the nearby structure, stacks and people. If the vehicle hits the people it leads to serious
injuries and it may also lead to fatality.

Breach Of Laws
According to the Section 112 of the Vehicle Act, 1988. No person shall drive a motor vehicle
or cause or allow a motor vehicle to be driven in any public place at a speed exceeding the
maximum speed.

Recommendation And Cost Analysis


Take serious action against the driver. Use only the competent driver with driving valid licence
holder. Provide necessary training, information and instruction.
Cost for hiring competent drivers depends upon the salary package.

4) Fire Hazard And Consequences


Absence of fire detectors and fire alarms at the mining machinery service area. In case of any
fire hazard the people inside the service area may not know the fire hazard and the may be
exposed to the file and get severe fire injuries and sometimes fatality.

Breach Of Laws
According to the Section 11 of the 2005 Act. Employers are required to prepare and revise
adequate emergency plans and procedures and provide the necessary measures for fire fighting
and the evacuation of the workplace.

Recommendation And Cost Analysis


Workers should not carry any type of ignition sources to the area. Provide warning signs. Take
immediate action to fix fire detectors and fire alarms at the mining machine service area.
Cost of buying fire detectors and fire alarms - Rs 5000.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

Sheet number 19 of 25
GC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Student name: SANTHA KUMAR M Student number: 00434083
Location: Larsen & Toubro Construction
Review Date:23/07/2018
& Mining Machinery Limited

5) Electric Hazard And Consequences

While entering the resting and eating area, found the electric switches were broken and the
workers were using it. It provides shock for the worker who is using it. It may also lead to fire
hazard.

Breach Of Laws
According to the Electricity at Work Regulations 1989. Require precautions to be taken against
the risk of death or personal injury from electricity in work activities.

Recommendation And Cost Analysis


Provide sign boards to avoid using the broken switch until fixing it. Remove the broken
switches and replace it with new and good quality switches so that the shock can be avoided.
Cost of buying new switch - Rs 500.

6) Impact Hazard And Consequences


The backhoe loader was working so close to the pedestrian pathway. The barricade and sign
boards were not provided. If the arm of the backhoe loader hits the pedestrian then they will
get serious injuries, fracture, fatality.

Breach Of Laws
According to the Section 21 of The Factories Act, 1948. Unless they are in such position or
of such construction as to be safe to every person employed in the factory as they would be if
they were securely fenced.

Recommendation And Cost Analysis


Change the pathway for the people away from the Backhoe loader. Barricade the area before
starting the task and provide necessary warning signs.
Cost of buying new barricade and making new sign boards - Rs. 3500.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

Sheet number 20 0f 25
GC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Student number: 00434083
Student name: SANTHA KUMAR M

Location: Larsen & Toubro Construction Review Date:23/07/2018


& Mining Machinery Limited

7) Entanglement Hazard And Consequence


Absence of protection guards in the coal conveyer working in the mining area and the workers
were working nearby. Loose cloths, loose hair, and other loose equipment can be pulled by the
rotating parts of the conveyers.

Breach Of Laws
According to the section 21 of Indian factory act, 1948. Every rotating part off the machine
should be covered with the 360 degree guarding and fencing while working as well as not
working.

Recommendation And Cost Analysis


Barricade the area before the start of the conveyer. Provide necessary protective jackets. Also
provide emergency shutdown switch to the conveyers.
Fix the necessary guards to the conveyers as soon as possible.
Cost of conveyer guard - Rs 10,000.
INTERNATIONAL GENERAL
CERTIFICATE Candidate report template

sheet number 21 of 25
GC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Student number: 00434083
Student name: SANTHA KUMAR M

Location: Larsen & Toubro Construction Review Date:23/07/2018


& Mining Machinery Limited

Conclusion

I thank the management for providing me such an opportunity to visit the company and allowing me
to do the health and safety inspection in the company. I hope my inspection will really help your
company to maintain the health and safety standards.

From my inspection I found that the welfare facilities drinking water, toilet facility, washing facility,
changing facility, transport facility, resting and eating facility, locker rooms and proper first-aid
requirements were properly provided and well maintained. The relationship between the worker and
the organization is good. This relationship helps in development of the industry.

Apart from this I also found some hazards in the work site and came up with proper control measures
to eliminate and reduce the hazards. There are few hazards which requires more attention and has to
be fixed as soon as possible. Failure to take action on these hazards will result in major accident.
Failure to fix these hazards may lead to loss of life, loss of company reputation, property damage and
to face the legal consequences.

For easy identification I have mention below the main findings with the effective recommend to
control the hazard:

1) Falling from height due to use of expired safety harness in the construction area.
2) Fire Hazard can cause due to presence of obstacles in the 3 rd escape route.
3) Vehicle Hazard can cause because of the over speed of the vehicle inside the warehouse.
4) Fire Hazard, Absence of smoke detectors and fire alarms mining machinery service area.
5) Electric Hazard due to broken switches and switch boards at eating and resting area.
6) Impact Hazard, Working with backhoe loader near pedestrian area at construction area.
7) Entanglement Hazard causes due to unguarded conveyers at the mining area.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

Sheet number 22 of 25
GC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Student name: SANTHA KUMAR M Student number: 00434083
Location: Larsen & Toubro Construction
Review Date:23/07/2018
& Mining Machinery Limited

Recommendations
1) Provide good quality safety equipments like safety harness to the workers
2) Maintain good housekeeping all around the industry mainly in the emergency escape routes.
3) Use only competent vehicle drivers and strict traffic rules must be followed mainly while
driving inside the industry.
4) Maintain proper road conditions and pathway conditions inside the industry.
5) Provide smoke detectors and fire alarms all around the industry.
6) Provide proper switches and switch boards and maintain to avoid electric hazard.
7) Provide necessary sign boards and barricade while working near the pedestrian pathway with
heavy machineries or equipments.
8) Guard all the equipments with good quality guards and proper guards in the industry.

These are the main hazards which requires special attention from the management side in order to
eliminate and reduce the hazard and risk. Please make sure that the control measures are properly
implemented and actions are taken at the right time. And also take action on other hazards which are
mentioned in the observation and implement proper control measures as mentioned in the observation.

There are some small correction to be done in order eliminate and reduce the minor hazards in the
industries. Sometimes these minor hazards may become major hazards so it is important to take
actions on these minor hazards.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

GC3 – THE HEALTH AND sheet number 23 0f 25


SAFETY PRACTICAL APPLICATION
Student name: SANTHA KUMAR M Student number: 00434083
Location: Larsen & Toubro Construction
Review Date:23/07/2018
& Mining Machinery Limited

Recommendations

Recommendation Likely Resource Implication Priority Review Date

1) Use of nets Implementing the netting


temporarily or stop system will take few minutes
the work temporarily or hours. It requires 4 person HIGH 20 Minutes
to protect the to fix the net. Cost of buying
workers working at new nets - Rs 2000.
height.

2) Provide new and Buying new safety harness


good quality safety can take 1 week. Cost of
harness to the buying new safety harness - HIGH 5 Days
workers working at Rs 15000.
height.

3) Remove the Requires 4 workers from the


obstacles from the3rd cleaning department and it
emergency escape will take 3 to 4 hours to finish HIGH 2 Days
route and maintain the work.
proper housekeeping.

4) Hire competent Hiring new competent driver


driver with valid with valid driving licence take
licence and provide few days and the cost will
him necessary depend upon his salary HIGH 5 Days
training, information, package.
instruction to avoid
vehicle hazard.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

Sheet number 24 of 25
GC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Student name: SANTHA KUMARR M Student number: 00434083
Location: Larsen & Toubro Construction
Review Date:23/07/2018
& Mining Machinery Limited

Recommendation Likely Resource Implication Priority Review Date

5) Buy new fire Buying and fixing fire alarms


alarms and smoke and smoke detectors will take
detectors and fix it in 5 days. Cost of buying and HIGH 1 Week
the production area. fixing the fire alarms and
smoke alarms - Rs 6000

6) Buy new and good Buying and fixing new


quality switches and switches and switchboards
switchboard and fix will take 5 days .Cost of HIGH 1 Week
it in the resting and buying and fixing new switch
eating area. and switch boards -
Rs 700.
7) Provide barricade, Provision of barricade,
warning signs and warning signs and changing
change the pathway the pathway will take 2 hours. HIGH 1 Day
for the pedestrians It requires 6 workers.
while working with
backhoe loader.
8) Maintaining Cost of buying safety dress -
proper dress code Rs 4000. Buying new safety
and provision of dress will take 1 or 2 days.
safety dress to the HIGH 3 Days
workers working
near the conveyers in
the industries.
INTERNATIONAL GENERAL
CERTIFICATE
Candidate report template

Sheet number 25 of 25
GC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Student name: SANTHA KUMAR M Student number: 00434083
Location: Larsen & Toubro Construction
Review Date:23/07/2018
& Mining Machinery Limited

Recommendation Likely Resource Implication Priority Review Date

9) Buy new and good It takes one week to buy and


quality guards which fix the guards. Cost of buying
are suitable to all the and fixing the suitable guards HIGH 2 Weeks
conveyers present in for 1 coal conveyers - Rs
the industries. 12000.
10) Provide training Provision of training to the
to all the workers workers will take few days.
working in the The cost of the training HIGH 1 Week
industry according to depends upon the type of
the job they are training. It requires competent
doing. person to train the workers.
11) Barricade and Barricading the area and
warning signs must provision of warning signs
be given in case of will take few minutes and it HIGH 2 Days
any repair works requires 5 to 6 workers.
carried in the
industry.
12) Provision of PPE, Cost of Replacing the
Respiratory damaged and buying new
protective equipment PPE, Respiratory protecting
and safety dress, etc equipment and safety dress - MEDIUM 10 Days
should be given to all Rs 25000. It takes maximum
workers according to 1 week.
the work.
13) Regular mock Mock drill can be done once
drill and provision of in a 6 month. It requires
information about the competent person. MEDIUM 6 Months
work area should be
provides.