This document lists the schedule and status of instrument documents for a project to build two black product tanks at a Pertamina refinery in Cilacap, Indonesia. It includes the schedule for design basis documents, specifications, data sheets, calculations, and drawings from July 2019 through September 2019. Many of the documents are scheduled to be completed in stages throughout the listed months.
This document lists the schedule and status of instrument documents for a project to build two black product tanks at a Pertamina refinery in Cilacap, Indonesia. It includes the schedule for design basis documents, specifications, data sheets, calculations, and drawings from July 2019 through September 2019. Many of the documents are scheduled to be completed in stages throughout the listed months.
This document lists the schedule and status of instrument documents for a project to build two black product tanks at a Pertamina refinery in Cilacap, Indonesia. It includes the schedule for design basis documents, specifications, data sheets, calculations, and drawings from July 2019 through September 2019. Many of the documents are scheduled to be completed in stages throughout the listed months.