A Receiving/Sampling/Testing Inspection

All Ready-Mix Concrete Are Delivered To The


Site With A Batch Ticket Listing The Following:
Name Of The Ready-Mix Company,
Location Of Batch Plant
Serial Number Of The Ticket, Date, Truck Number
Name Of Purchaser
Name Of The Job And Location,
Job Order (JO) Number For Project
Mix Design Number
Amount Of Concrete In Cubic Meters (Or Yards)
A1 ACI 211-1
Time Of Loading, If Wet Mix
Reading Of The Revolution Counter At The First
Addition Of Water
Type, Brand & Amount Of Cement, Silica Fume &
Admixture
Source And Total Amount Of Mixing Water
Maximum Size Of Aggregate
Mass Of Fine And Course Aggregate
Time Leaving Batch Plant
Signature Or Initials Of Producer's Representative

Ready mix concrete delivered in trucks not having


A2 ACI 211-1
operable revolution counters shall be rejected.
Concrete shall be discharged from the mixer within
90 minutes or before the drum has revolved 300
revolutions, whichever comes first after the
A3 ACI 211-1
introduction of mixing water to the cement &
aggregates or introduction of cement to the
aggregates.
Concrete delivered at a temperature in excess of 09-SAMSS-
A4 35°C or that fails to maintain a temperature of 35°C 097
until used, shall be rejected. Sec. 12.11

No aluminum parts shall be placed in contact with


A5 ACI 211-1
concrete during mixing or delivery.
ASTM C143
Slump and cylinder test samples shall be taken
SAES-Q-001
from the end of the mixture truck chute or at the
A6 Sec. 5, 09-
discharge point of the concrete placement hose
SAMSS-097
when concrete pumps are used.
Sec. 7.2
ASTM C39,
Strength tests as well as slump, temperature,
ASTM C1064
density and air content tests (when required by the
ASTM C231
specifications) shall be made with a frequency of
ACI 211-1
A7 not less than one test for each 115 m³. Each test
SAES-Q-001
shall be made from a separate batch. On each day
sec. 5, 09-
concrete is delivered, at least one strength test shall
SAMSS-097
be made for each class of concrete.
Sec. 17.5