Professional Documents
Culture Documents
Request For Inspection: Prepare By: Material Control Aproved By: Checked By: Qa/Qc
Request For Inspection: Prepare By: Material Control Aproved By: Checked By: Qa/Qc
PROJECT :MELIWIS DEVELOPMENT PROJECT- BLANKET STRUCTURE - PIPING SUPLAY AND FABRICATION DATE 23 Juli 2019
NAME OF
MATERIAL OF TOP SIDE OF MELIWIF PROJECT
EQUIPMENT
MAT'L
NO DESCRIPTION DIMENSION/ SIZE HEAT NO. CERTIFICATE NO. QTY (pcs) VISUAL RESULT REMARKS
SPECIFICATION
10 STUD BOLT C/W 2 NUTS B7/2H 5/8x90 _ _ 40 SET FOR OPEN DRAIN
11 STUD BOLT C/W 2 NUTS B7/2H 7/8x120 _ _ 14 SET FOR OPEN DRAIN
1 OF 1
REQUEST FOR INSPECTION
PROJECT :MELIWIS DEVELOPMENT PROJECT- BLANKET STRUCTURE - PIPING SUPLAY AND FABRICATION DATE 23 Juli 2019
NAME OF
MATERIAL OF TOP SIDE OF MELIWIF PROJECT
EQUIPMENT
MAT'L
NO DESCRIPTION DIMENSION/ SIZE HEAT NO. CERTIFICATE NO. QTY (pcs) VISUAL RESULT REMARKS
SPECIFICATION
2 OF 1