Method Statement for Survey Work

INSTRUMENTS: 1. Calibrated Theodolite, Total station, Auto Level, Measuring Tapes &
pegs, Etc...
Sl.
Procedure Responsibility Check By Record
No.

Clean the site and level it with minor


1
cutting and filling.

Refer to drawing. Establish main


control stations for the building with
reference and coordinate given and
2 traverse to be closed properly and
verified. Calibrated theodolite and
standard leveling instruments shall be
used for carrying out survey works.

Establish temporary benchmark for


3 level control with reference to the
benchmark provided by the client.

Demarcation of the plot and marking


the actual boundaries. Setting up of
grid lines and levels in both the
4
directions for works like earth work in
excavation, foundation, trenches,
roads pipelines etc

Conduct survey work as per plan.


5 Keep records as per format
QF/SUR/01 and sketches.

Check the required bottom level of


6
PCC.

Check the top level of footing and raft


after casting. Transfer the centre line
7 for columns on the footing and raft.
Transfer BMs on column to facilitate
level control of floor slab.