14b-Kill Sheet Preparation

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

International Well Control Forum DATE :

Surface BOP Vertical Well Kill Sheet (API Field Units) NAME :

FORMATION STRENGTH DATA: CURRENT WELL DATA::


SURFACE LEAK -OFF PRESSURE FROM
FORMATION STRENGTH TEST (A) psi

MUD WEIGHT AT TEST (B) ppg


CURRENT DRILLING MUD:
MAXIMUM ALLOWABLE MUD WEIGHT =
WEIGHT ppg
(A)
(B) + = (C) ppg
SHOE T.V. DEPTH x 0.052

INITIAL MAASP =
((C) - CURRENT MUD WEIGHT) x SHOE T.V. DEPTH x 0.052
CASING SHOE DATA:
= psi
SIZE inch

M. DEPTH feet
PUMP NO. 1 DISPL. PUMP NO. 2 DISPL. T.V. DEPTH feet

bbls / stroke bbls / stroke


HOLE DATA:
(PL) DYNAMIC PRESSURE LOSS [psi]
SIZE inch
SLOW PUMP
PUMP NO. 1 PUMP NO. 2
RATE DATA: M. DEPTH feet

T.V. DEPTH feet


SPM

SPM

PRE-RECORDED LENGTH CAPACITY VOLUME PUMP STROKES TIME


VOLUME DATA: feet bbls / foot barrels strokes minutes

DRILL PIPE x =
VOLUME PUMP STROKES
HEAVY WALL DRILL PIPE x = +
PUMP DISPLACEMENT SLOW PUMP RATE
DRILL COLLARS x = +

DRILL STRING VOLUME (D) bbls (E) strokes Min

DC x OPEN HOLE x =

DP / HWDP x OPEN HOLE x = +

OPEN HOLE VOLUME (F) bbls strokes Min

DP x CASING x = (G) + strokes Min

TOTAL ANNULUS VOLUME (F+G) = (H) bbls strokes Min

TOTAL WELL SYSTEM VOLUME (D+H) = (I) bbls strokes Min

ACTIVE SURFACE VOLUME (J) bbls strokes

TOTAL ACTIVE FLUID SYSTEM (I +J) bbls strokes Dr No SV 04/01


(Field Units)
27-01-2000
International Well Control Forum DATE :

Surface BOP Kill Sheet - Vertical Well (API Field Units) NAME :

KICK DATA :
SIDPP psi SICP psi PIT GAIN barrels

KILL MUD WEIGHT SIDPP


CURRENT MUD WEIGHT +
TVD x 0.052
................. + =
KMW X 0.052 ppg

INITIAL CIRCULATING DYNAMIC PRESSURE LOSS + SIDPP


PRESSURE
................. + ................. =
ICP psi

KILL MUD WEIGHT


FINAL CIRCULATING x DYNAMIC PRESSURE LOSS
CURRENT MUD WEIGHT
PRESSURE
FCP x ................. =
psi

(K) x 100 X 100 psi


(K) = ICP - FCP = ................... - ................... = .............. psi = =
(E) 100 strokes

STROKES PRESSURE
[psi]
STATIC & DYNAMIC DRILL PIPE PRESSURE [psi]

STROKES

Dr No SV 04/02 (Field Units) 27-01-2000


PAGE 1 OF 2

International Well Control Forum DATE :

Surface BOP Kill Sheet - Vertical Well (Metric/Bar) NAME :

FORMATION STRENGTH DATA: CURRENT WELL DATA::


SURFACE LEAK -OFF PRESSURE FROM
FORMATION STRENGTH TEST (A) bar
CURRENT DRILLING FLUID:
DRILLING FLUID DENSITY AT TEST (B) kg/l
DENSITY kg/l
MAX. ALLOWABLE DRILLING FLUID DENSITY =
(A)
(B) + = (C) kg/l
SHOE T.V. DEPTH x 0.0981

INITIAL MAASP = CASING SHOE DATA:


((C) - CURRENT DENSITY) x SHOE T.V. DEPTH x 0.0981
SIZE in
= bar
M. DEPTH m

T.V. DEPTH m

PUMP NO. 1 DISPL. PUMP NO. 2 DISPL.

l / stroke l / stroke
HOLE DATA:
(PL) DYNAMIC PRESSURE LOSS [bar]
SIZE in
SLOW PUMP
PUMP NO. 1 PUMP NO. 2
RATE DATA: M. DEPTH m

T.V. DEPTH m
SPM

SPM

PRE-RECORDED LENGTH CAPACITY VOLUME PUMP STROKES TIME


VOLUME DATA: m l/m litres stks minutes

DRILL PIPE x =
VOLUME PUMP STROKES
HEAVY WALL DRILL PIPE x = +
PUMP DISPLACEMENT SLOW PUMP RATE
DRILL COLLARS x = +

DRILL STRING VOLUME (D) l (E) stks min

DC x OPEN HOLE x =

DP / HWDP x OPEN HOLE x = +

OPEN HOLE VOLUME (F) l stks min

DP x CASING x = (G) + stks min

TOTAL ANNULUS VOLUME (F+G) = (H) l stks min

TOTAL WELL SYSTEM VOLUME (D+H) = (I) l stks min

ACTIVE SURFACE VOLUME (J) l stks


Dr No SV02/01
(BAR 981)
TOTAL ACTIVE FLUID SYSTEM (I +J) l stks 27-Jan-2000
PAGE 2 OF 2

International Well Control Forum DATE :

Surface BOP Kill Sheet - Vertical Well (Metric/Bar) NAME :

KICK DATA :
SIDPP bar SICP bar PIT GAIN litres

KILL FLUID DENSITY SIDPP


CURRENT DRILLING FLUID DENSITY +
TVD x 0.0981
................. + =
KMD x 0.0981 ................ kg / l

INITIAL CIRCULATING DYNAMIC PRESSURE LOSS + SIDPP


PRESSURE
................. + ................. =
ICP ............... bar

KILL FLUID DENSITY


FINAL CIRCULATING x DYNAMIC PRESSURE LOSS
CURRENT DRILLING FLUID DENSITY
PRESSURE
FCP x ................. =
............... bar

(K) x 100
(K) = ICP - FCP Bar --.--------- = Bar/100 strokes
(E)

STROKES PRESSURE
[bar]
STATIC & DYNAMIC DRILL PIPE PRESSURE [bar]

STROKES

Dr. No SV 02/02 (Bar 981) 27-Jan-2000


International Well Control Forum DATE :

Surface BOP Kill Sheet - Deviated Well (API Field Units) NAME :

FORMATION STRENGTH DATA: CURRENT WELL DATA:


SURFACE LEAK -OFF PRESSURE FROM
DRILLING MUD DATA:
FORMATION STRENGTH TEST (A) psi
WEIGHT ppg
MUD WEIGHT AT TEST (B) ppg GRADIENT psi/ft

MAXIMUM ALLOWABLE MUD WEIGHT =


(A) (C) ppg
(B) + =
SHOE T.V. DEPTH x 0.052 DEVIATION DATA:
KOP M.D. ft
INITIAL MAASP =
KOP T.V.D. ft
((C) - CURRENT MUD WEIGHT) x SHOE T.V. DEPTH x 0.052

= psi EOB M.D. ft


EOB T.V.D. ft

PUMP NO. 1 DISPL. PUMP NO. 2 DISPL. CASING SHOE DATA:


SIZE in
bbls / stroke bbls / stroke
M. DEPTH ft
T.V. DEPTH ft

SLOW PUMP (PL) DYNAMIC PRESSURE LOSS HOLE DATA:


RATE DATA: PUMP NO. 1 PUMP NO. 2 SIZE in
M. DEPTH ft
SPM psi psi
T.V. DEPTH ft
SPM psi psi

PRE-RECORDED LENGTH CAPACITY VOLUME PUMP STROKES TIME


VOLUME DATA: ft bbls / ft bbls strokes minutes

DP - SURFACE TO KOP x = (L) stks


DP - KOP TO EOB x = + (M) stks
DP - EOB TO BHA x = + (N1) stks

HEVI WALL DRILL PIPE x = + (N2) stks

DRILL COLLAR x = + (N3) stks

DRILL STRING VOLUME (D) bbls stks min

DC x OPEN HOLE x =
DP / HWDP x OPEN HOLE x = +
OPEN HOLE VOLUME (F) bbls stks min

DP x CASING x = (G) + stks min


TOTAL ANNULUS VOLUME (F+G) = (H) bbls stks min
TOTAL WELL SYSTEM VOLUME (D+H) = (I) bbls stks min

Dr No SD 04/01
ACTIVE SURFACE VOLUME (J) bbls (Field Units)
TOTAL ACTIVE FLUID SYSTEM (I+J) 27-01-2000
bbls
International Well Control Forum DATE :

Surface BOP Kill Sheet - Deviated Well (API Field Units) NAME :

KICK DATA :

SIDPP psi SICP psi PIT GAIN bbl

KILL MUD WEIGHT SIDPP


CURRENT MUD WEIGHT +
TVD x 0.052

KMW ................. + =
X 0.052 ................ ppg

INITIAL CIRC. PRESSURE DYNAMIC PRESSURE LOSS + SIDPP


ICP ................. + ................. = ............... psi

KILL MUD WEIGHT


FINAL CIRCULATING x DYNAMIC PRESSURE LOSS
CURRENT MUD WEIGHT
PRESSURE
FCP x ................. =
............... psi

DYNAMIC PRESSURE KOPMD


PL + (FCP-PL) x = .......... + (...........-............) x =
LOSS AT KOP (O) TDMD ............... psi

SIDPP - (KMW - CMW) x 0.052 x KOPTVD


REMAINING SIDPP
AT KOP (P) = .............. - (..................-...................) x 0.052 x ................. =
............... psi

CIRCULATING PRESS.
(O) + (P) = ............. + ............. =
AT KOP (KOP CP) ............... psi

DYNAMIC PRESSURE EOBMD


PL + (FCP-PL) x = .......... + (...........-............) x =
LOSS AT EOB (R) TDMD ............... psi

SIDPP - (KMW - CMW) x 0.052 x EOBTVD


REMAINING SIDPP
AT EOB (S) = .............. - (..................-...................) x 0.052 x ................. =
............... psi

CIRCULATING PRESSURE
(R) + (S) = ............. + ............. =
AT EOB (EOB CP) ............... psi

(T) x 100 x 100 psi


(T) = ICP - KOP CP = ............... - ............. = ........... psi = = .............
(L) 100 strokes

(U) x 100 X 100 psi


(U) = KOP CP - EOB CP = .......... - .......... = ........... psi = = .............
(M) 100 strokes

(W) x 100 X 100 psi


(W) = EOB CP - FCP = ............ - .............. = ........... psi = = .............
(N1+N2+N3) 100 strokes
Dr No SD 04/02 (Field Units) 27-01-2000
International Well Control Forum DATE :

Surface BOP Kill Sheet - Deviated Well (API Field Units) NAME :
STATIC & DYNAMIC DRILL PIPE PRESSURE [psi]

STROKES
PRESSURE
[psi]
STROKES

Dr No SD 04/03 (Field Units) 27-01-2000


PAGE 1 OF 3

International Well Control Forum DATE :

Surface BOP Kill Sheet - Deviated Well (Metric/Bar) NAME :

FORMATION STRENGTH DATA: CURRENT WELL DATA:


SURFACE LEAK -OFF PRESSURE FROM
DRILLING FLUID DATA:
FORMATION STRENGTH TEST (A) bar
DENSITY kg/l
DRILLING FLUID DENS. AT TEST (B) kg/l GRADIENT bar/m

MAX. ALLOWABLE DRILLING FLUID DENSITY =


(A) (C) kg/l
(B) + =
SHOE T.V. DEPTH x 0.0981 DEVIATION DATA:
KOP M.D. m
INITIAL MAASP =
KOP T.V.D. m
((C) - CURR. DENS.) x SHOE T.V. DEPTH x 0.0981

= bar EOB M.D. m


EOB T.V.D. m

PUMP NO. 1 DISPL. PUMP NO. 2 DISPL. CASING SHOE DATA:


SIZE in
l / stroke l / stroke
M. DEPTH m
T.V. DEPTH m

SLOW PUMP (PL) DYNAMIC PRESSURE LOSS HOLE DATA:


RATE DATA: PUMP NO. 1 PUMP NO. 2 SIZE in
M. DEPTH m
SPM bar bar
T.V. DEPTH m
SPM bar bar

PRE-RECORDED LENGTH CAPACITY VOLUME PUMP STROKES TIME


VOLUME DATA: m l/m litre stks minutes

DP - SURFACE TO KOP x = (L) stks


DP - KOP TO EOB x = + (M) stks
DP - EOB TO BHA x = + (N1) stks

HEVI WALL DRILL PIPE x = + (N2) stks

DRILL COLLAR x = + (N3) stks

DRILL STRING VOLUME (D) l stks min

DC x OPEN HOLE x =
DP / HWDP x OPEN HOLE x = +
OPEN HOLE VOLUME (F) l stks min

DP x CASING x = (G) + stks min


TOTAL ANNULUS VOLUME (F+G) = (H) l stks min
TOTAL WELL SYSTEM VOLUME (D+H) = (I) l stks min

ACTIVE SURFACE VOLUME (J) l Dr No SD 02/01


l (BAR-981)
TOTAL ACTIVE FLUID SYSTEM (I+J) 27-01-2000
PAGE 2 OF 3

International Well Control Forum DATE :

Surface BOP Kill Sheet - Deviated Well (Metric/Bar) NAME :

KICK DATA :

SIDPP bar SICP bar PIT GAIN litre

KILL FLUID DENSITY SIDPP


CURRENT DRILLING FLUID DENSITY +
TVD x 0.0981
.................................
KMD ................. + =
..................... x 0.0981 ................ kg / l

INITIAL CIRC. PRESS. DYNAMIC PRESSURE LOSS + SIDPP


ICP ................. + ................. = ............... bar

KILL FLUID DENSITY


FINAL CIRCULATING x DYNAMIC PRESSURE LOSS
CURRENT DRILLING FLUID DENSITY
PRESSURE
....................
FCP x ................. =
.................... ............... bar

DYNAMIC PRESSURE KOPMD ............


PL + (FCP-PL) x = .......... + (...........-............) x =
LOSS AT KOP (O) TDMD ............ ............... bar

SIDPP - (KMD - OMD) x 0.0981 x KOPTVD


REMAINING SIDPP
AT KOP (P) = .............. - (..................-...................) x 0.0981 x ................. =
............... bar

CIRCULATING PRESS.
(O) + (P) = ............. + ............. =
AT KOP (KOP CP) ............... bar

DYNAMIC PRESS. LOSS EOBMD ............


PL + (FCP-PL) x = .......... + (...........-............) x =
AT EOB (R) TDMD ............ ............... bar

SIDPP - (KMD - OMD) x 0.0981 x EOBTVD


REMAINING SIDPP
AT EOB (S) = .............. - (..................-...................) x 0.0981 x ................. =
............... bar

CIRCULATING PRESS.
(R) + (S) = ............. + ............. =
AT EOB (EOB CP) ............... bar

(T) x 100 .......... x 100 bar


(T) = ICP - KOP CP = ............... - ............. = ........... bar = = .............
(L) ........... 100 strokes

(U) x 100 .......... x 100 bar


(U) = KOP CP - EOB CP = .......... - .......... = ........... bar = = .............
(M) ........... 100 strokes

(W) x 100 .......... x 100 bar


(W) = EOB CP - FCP = ............ - .............. = ........... bar = = .............
(N1+N2+N3) ........... 100 strokes

Dr No SD 02/2 (BAR-981) 27-01-2000


PAGE 3 OF 3

International Well Control Forum DATE :

Surface BOP Kill Sheet - Deviated Well (Metric/Bar) NAME :


STATIC & DYNAMIC DRILL PIPE PRESSURE [bar]

STROKES
PRESSURE
[bar]
STROKES

Dr No SD 02/3 (BAR-981) 27-01-2000

You might also like