Daftar Harga Satuan Bahan Bangunan: Tahun 2018 Kabupaten Sukoharjo
Daftar Harga Satuan Bahan Bangunan: Tahun 2018 Kabupaten Sukoharjo
NO. J E N I S B A H A N
I BAHAN DASAR
1 BATU KALI Bulat Belah
Pecah 10/15
Pecah 3/5 + 5/7
Pecah 3/5
2 KERIKIL Timbunan Pilihan/sirtu
Sawur / Koral
Beton 0,5/1
Beton 1/2
Beton 2/3
3 BATU BATA
4 PASIR Urug
Pasang
Beton
5 TANAH Padas
6 KAPUR Pasang
7 PORTLAND CEMENT
Portland Cement
Portland Cement 40kg
Semen warna
2 KAMPER Papan
Balok/pesagen
3 KRUING Papan
Balok/pesagen
4 MERANTI Papan
Balok/pesagen
6 BENGKIRAI Papan
Balok/pesagen
7 SENGON Papan
Balok/pesagen
8 DOLKEN Sedang 8 - 10 x 400 cm
V. BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm
Ø 20 cm - 100 cm
Ø 30 cm - 100 cm
Ø 40 cm - 100 cm
Ø 50 cm - 100 cm
Ø 60 cm - 100 cm
Ø 100 cm - 100 cm
Ø 80 cm - 50 cm
Ø 90 cm - 50 cm
Ø 100 cm - 50 cm
U 20 cm - 100 cm
U 30 cm - 100 cm
2 LUBANG ANGIN (ROSTER) PC + PASIR 10 X 20 cm
VI BAHAN BESI
1 BESI BETON besi beton polos
besi beton ulir
2 BESI PLAT 2 x 2,5 Besi Strip
BESI PLAT 2 x 3 Besi Strip
3 BESI PROFIL Besi Profil
Besi Profil WF
5 BESI SIKU L All Size
6 KAWAT - Ikat beton/bendrat
- Kawat las
7 LAIN-LAIN
Paku asbes
Paku sekrup asbes
Skrup Fixer
Sealant
Venetions Blinds atau Vertical Blinds (tirai)
IX BAHAN FINISHING
1 KAYU
Menie
Dempul plamur
Ambril/amplas
Cat dasar
- Koas
. Plitur jadi
. Vernis
2 TEMBOK
Plamur
Cat tembok
3 BESI
Menie
Cat
Minyak cat
Residu (teer/aspal)
Lem Aica Aibon
X BAHAN KACA
1 POLOS 3 mm
5 mm
2 RAY BAND 5 mm
XV LAIN -LAIN
1 Naco rayban 5 mm per Daun
2 Naco bening 5 mm per Daun
3 Rolling door Besi
4 Rolling door Almunium
5 Kusen Almunium 4" Putih
6 Kusen Almunium 4" Coklat
7 Besi Holo rangka gypsum
8 Minyak Beton & bekisting
9 Pintu Lipat Besi 0.8 mm
10 Soda api
11 Air
12 Solar (Industri)
13 Premium (Industri)
14 Pelumas
m3 245,000.00
m3 250,000.00
m3 250,000.00
m3 250,000.00
m3 174,000.00
m3 85,000.00
m3 260,000.00
m3 260,000.00
m3 260,000.00
bh 700.00
m3 160,000.00
m3 240,000.00
m3 240,000.00
m3 50,000.00
m3 300,000.00
kg 1,075.00
zak 43,000.00
kg 1,800.00
bh 6,000.00
bh 4,000.00
bh 600.00
bh 3,000.00
bh 6,500.00
bh 7,000.00
bh 7,000.00
bh 3,200.00
bh 2,100.00
bh 2,400.00
bh 1,700.00
bh 47,000.00
bh 54,000.00
bh 62,000.00
bh 69,000.00
bh 72,000.00
bh 95,000.00
bh 65,000.00
bh 57,700.00
bh 38,000.00
bh 21,000.00
lbr 42,000.00
m' 48,000.00
m' 52,000.00
lbr 57,000.00
lbr 75,000.00
lbr 99,000.00
lbr 65,000.00
m3 17,100,000.00
m3 14,500,000.00
m3 18,500,000.00
m3 15,800,000.00
m3 12,000,000.00
m3 11,500,000.00
m3 8,800,000.00
m3 8,000,000.00
m3 7,475,000.00
m3 6,840,000.00
m3
m3 2,000,000.00
m3 13,000,000.00
m3 12,900,000.00
m3 3,795,000.00
m3 2,900,000.00
bt 18,000.00
bt 13,200.00
m2 13,200.00
m 25,000.00
m3 20,000.00
m 1.00
m3 6,325,000.00
m3 9,490,000.00
m3 8,712,300.00
m3 11,000,000.00
m3 7,000,000.00
m2 47,000.00
m2 50,000.00
m2 52,000.00
m2 75,000.00
m2 57,000.00
m2 65,000.00
m2 56,000.00
m2 56,000.00
bh 4,000.00
bh 3,000.00
m2 110,000.00
m2 160,000.00
m2 40,000.00
m2 130,000.00
m2 160,000.00
m2 170,000.00
m2 189,000.00
m2 149,000.00
bh
bh 35,000.00
bh 51,000.00
bh 65,000.00
bh 140,000.00
bh 140,000.00
bh 300,000.00
bh 100,000.00
bh 110,000.00
bh 140,000.00
bh 30,000.00
bh 40,000.00
bh 5,500.00
kg 11,000.00
kg 11,000.00
kg 12,000.00
kg 14,800.00
kg 14,500.00
kg 14,500.00
kg 14,000.00
kg 17,000.00
kg 35,000.00
kg 44,000.00
kg 55,000.00
bh 1,500.00
bh 63,000.00
m2 124,000.00
btg 15,000.00
btg 20,000.00
btg 30,000.00
btg 47,000.00
btg 65,000.00
btg 154,000.00
btg 66,000.00
btg 48,400.00
btg 31,900.00
btg 26,400.00
btg 25,000.00
btg 18,000.00
btg 82,000.00
btg 105,000.00
btg 132,000.00
btg 185,000.00
btg 360,000.00
btg 495,000.00
m' 9,000.00
lbr 76,000.00
m1 18,000.00
m1 27,600.00
lbr 100,000.00
lbr 90,000.00
lbr 55,000.00
lbr 66,000.00
lbr 121,000.00
lbr 160,000.00
lbr 125,000.00
m2 19,000.00
lbr 66,000.00
lbr 55,000.00
lbr 84,000.00
kg 33,000.00
kg 30,000.00
lbr 5,700.00
kg 55,000.00
bh 9,000.00
ltr 58,000.00
ltr 52,000.00
kg 15,000.00
kg 25,000.00
kg 47,000.00
kg 60,000.00
ltr 27,500.00
drum 1,100,000.00
kg 68,750.00
m2 73,000.00
m2 100,000.00
m2 114,000.00
bh 55,000.00
bh 145,000.00
bh 77,000.00
bh 66,000.00
bh 164,000.00
bh 6,000.00
bh 15,000.00
bh 9,000.00
bh 5,000.00
bh 3,000.00
bh
bh 1,400,000.00
bh 190,000.00
bh 325,000.00
bh 1,462,000.00
bh 400,000.00
bh 24,000.00
bh 4,000.00
bh 5,000.00
bh 250,000.00
bh 52,000.00
kg 15,000.00
kg 65,000.00
bh 300.00
bh 19,000.00
kg 5,000.00
kg 20,000.00
BH 4,500.00
m2 63,000.00
m2 67,000.00
m2 55,000.00
m2 70,000.00
bh 85,000.00
bh 95,000.00
m2 350,000.00
m2 517,000.00
m' 82,000.00
m' 93,500.00
m1 15,000.00
ltr 18,000.00
m2 630,000.00
kg 28,000.00
m3 75,000.00
ltr 9,500.00
ltr 7,200.00
ltr 35,000.00
m' 85,000.00
m' 90,000.00
SUMBER DATA :
NO. :
1 Pekerja
2 Mandor
3 Tukang listrik
4 Tukang kayu
5 Kep. tk. kayu
6 Tukang batu
7 Kep. tk. batu
8 Tukang besi
9 Kep. tk. besi
10 Tukang cat
11 Kep. tk. cat
12 Tukang plitur
13 Tukang jalan
14 Tukang gali
15 Tukang masak aspal
16 Tk. leideng
17 Operator M a s i n i s
18 Pemb. Masinis
19 Penjaga api
20 Penjaga malam
21 Sopir
22 Pembantu Sopir
DAFTAR UPAH PEKERJA
TAHUN 2018 KABUPATEN SUKOHARJO
SK BUPATI
Hr 65,000.00
Hr 90,000.00
Hr 80,000.00
Hr 80,000.00
Hr 90,000.00
Hr 80,000.00
Hr 90,000.00
Hr 80,000.00
Hr 90,000.00
Hr 80,000.00
Hr 90,000.00
Hr 80,000.00
Hr 80,000.00
Hr 80,000.00
Hr 80,000.00
Hr 80,000.00
Hr 90,000.00
Hr 75,000.00
Hr 80,000.00
Hr 70,000.00
Hr 80,000.00
Hr 70,000.00
DAFTAR HARGA SATUAN PEKERJAAN
I. Pekerjaan Persiapan
1. 1 m2 Pembersihan Lokasi Tenaga
Pekerja 0.100 Oh
Mandor 0.050 Oh
Tenaga
Pekerja 0.200 Oh
Tukang kayu 0.400 Oh
Mandor 0.020 Oh
Tenaga
Pekerja 0.150 Oh
Tukang kayu 0.300 Oh
Kepala Tukang 0.030 Oh
Mandor 0.075 Oh
Tenaga
Pekerja 1.500 Oh
Tukang batu 0.750 Oh
Kepala Tukang 0.075 Oh
Mandor 0.075 Oh
Tenaga
Pekerja 0.780 Oh
Tukang batu 0.390 Oh
Mandor 0.039 Oh
Tenaga
Pekerja 0.300 Oh
Tukang batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.015 Oh
Tenaga
Pekerja 0.300 Oh
Tukang batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.015 Oh
IV. Pekerjaan Beton
1 1 m³ Pondasi Beton Bertulang (150 Bahan
kg Besi + Bekisting) 1 Pc : 3Ps : 5Kr Kayu kelas III 0.200 m³
Paku 2" - 5" 1.500 Kg
Minyak bekisting 0.400 Ltr
Besi beton polos 157.500 Kg
Kawat beton 2.250 Kg
Semen portland 336.000 Kg
Pasir beton 0.540 m³
Kerikil 0.810 m³
Tenaga
Pekerja 5.300 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 1.300 Oh
Tukang Besi 1.050 Oh
Kepala Tukang 0.262 Oh
Mandor 0.265 Oh
Tenaga
Pekerja 7.050 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 1.650 Oh
Tukang Besi 2.100 Oh
Kepala Tukang 0.403 Oh
Mandor 0.353 Oh
Tenaga
Pekerja 6.350 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 1.650 Oh
Tukang Besi 1.400 Oh
Kepala Tukang 0.333 Oh
Mandor 0.318 Oh
Tenaga
Pekerja 5.650 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 1.560 Oh
Tukang Besi 1.400 Oh
Kepala Tukang 0.323 Oh
Mandor 0.283 Oh
Tenaga
Pekerja 1.650 Oh
Tukang batu 0.250 Oh
Mandor 0.080 Oh
V. Pekerjaan Kayu
1 1 m3 Pasang Kusen Pintu, Jendela, Bahan
Bouven Kayu Jati Balok Kayu Jati kelas sedang 1.200 m³
Paku Biasa 2" - 5" 1.250 Kg
Lem Kayu 1.000 Kg
Tenaga
Pekerja 6.000 Oh
Tukang kayu 18.000 Oh
Kepala Tukang 1.800 Oh
Mandor 0.300 Oh
Tenaga
Pekerja 1.000 Oh
Tukang kayu 3.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.050 Oh
Tenaga
Pekerja 0.150 Oh
Tukang kayu 0.250 Oh
Kepala Tukang 0.025 Oh
Mandor 0.075 Oh
Tenaga
Pekerja 6.700 Oh
Tukang kayu 20.100 Oh
Kepala Tukang 2.010 Oh
Mandor 0.335 Oh
3 1 m² Pasang Atap genteng beton Bahan
glasur Genteng beton 25 Bh
Tenaga
Pekerja 0.150 Oh
Tukang kayu 0.075 Oh
Mandor 0.008 Oh
Tenaga
Pekerja 0.400 Oh
Tukang kayu 0.200 Oh
Mandor 0.002 Oh
Tenaga
Pekerja 0.100 Oh
Tukang kayu 0.200 Oh
Mandor 0.005 Oh
Tenaga
Pekerja 0.800 Oh
Tukang kayu 0.800 Oh
Kepala Tukang 0.080 Oh
Mandor 0.040 Oh
Tenaga
Pekerja 0.250 Oh
Tukang batu 0.125 Oh
Kepala Tukang 0.013 Oh
Mandor 0.013 Oh
Tenaga
Pekerja 0.900 Oh
Tukang batu 0.450 Oh
Kepala Tukang 0.045 Oh
Mandor 0.045 Oh
Tenaga
Pekerja 0.020 Oh
Tukang kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.02 Oh
Tenaga
Pekerja 0.010 Oh
Tukang kayu 0.500 Oh
Kepala Tukang 0.050 Oh
Mandor 0.005 Oh
Tenaga
Pekerja 0.005 Oh
Tukang kayu 0.500 Oh
Kepala Tukang 0.050 Oh
Mandor 0.003 Oh
Tenaga
Pekerja 0.015 Oh
Tukang kayu 0.150 Oh
Mandor 0.008 Oh
Tenaga
Pekerja 0.015 Oh
Tukang kayu 0.150 Oh
Mandor 0.008 Oh
Tenaga
Pekerja 0.015 Oh
Tukang kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.0008 Oh
Tenaga
Pekerja 0.010 Oh
Tukang kayu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.001 Oh
Tenaga
Pekerja 0.015 Oh
Tukang kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.008 Oh
Tenaga
Pekerja 0.015 Oh
Tukang kayu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.008 Oh
X. Pekerjaan Cat
1 1 m² Pengecatan Tbk baru (1lapis Bahan
plamir) 1lapis cat dasar , 2 lapis cat Plamir 0.100 Kg
penutup
Cat dasar 0.100 Kg
Cat penutup 0.260 Kg
Tenaga
Pekerja 0.020 Oh
Tukang cat 0.063 Oh
Kepala Tukang 0.006 Oh
Mandor 0.003 Oh
Tenaga
Pekerja 0.070 Oh
Tukang cat 0.009 Oh
Kepala Tukang 0.006 Oh
Mandor 0.003 Oh
Tenaga
Kerja Borongan 1.000 Oh
Tenaga
Kerja Borongan 1.000 Oh
Tenaga
Kerja Borongan 1.000 Oh
Tenaga
Pekerja 3.300 Oh
Tukang Batu 1.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.160 Oh
Tenaga
Pekerja 1.000 Oh
Tukang Batu 1.500 Oh
Kepala Tukang 0.150 Oh
Mandor 0.165 Oh
Tenaga
Pekerja 1.200 Oh
Tukang Batu 1.450 Oh
Kepala Tukang 0.150 Oh
Mandor 0.060 Oh
Tenaga
Pekerja 6.00 Oh
Tukang Batu 3.00 Oh
Kepala Tukang 0.30 Oh
Mandor 0.03 Oh
Tenaga
Pekerja 0.036 Oh
Tukang Batu 0.060 Oh
Kepala Tukang 0.006 Oh
Mandor 0.002 Oh
6 Pasang 1m pipa PVC tipe AW Bahan
diameter 4" untuk saluran air kotor Pipa PVC 4" 1.200 M
cair Perlengkapan 35% harga pipa 0.350 Bh
Tenaga
Pekerja 0.078 Oh
Tukang Batu 0.135 Oh
Kepala Tukang 0.0135 Oh
Mandor 0.004 Oh
Tenaga
Pekerja 0.030 Oh
Tukang Batu 0.300 Oh
Kepala Tukang 0.030 Oh
Mandor 0.015 Oh
Tenaga
Pekerja 0.010 Oh
Tukang Batu 0.100 Oh
Kepala Tukang 0.010 Oh
Mandor 0.005 Oh
Tenaga
Pekerja 0.010 Oh
Tukang Batu 0.400 Oh
Kepala Tukang 0.040 Oh
Mandor 0.005 Oh
SATUAN PEKERJAAN
65,000.00 6,500.00
90,000.00 4,500.00
11,000.00
11,000.00
18,000.00 22,500.00
57,000.00 68,400.00
15,000.00 900.00
91,800.00
65,000.00 13,000.00
80,000.00 32,000.00
90,000.00 1,800.00
46,800.00
138,600.00
3,163,000.00 379,560.00
15,000.00 3,000.00
382,560.00
65,000.00 9,750.00
80,000.00 24,000.00
80,000.00 2,400.00
90,000.00 6,750.00
42,900.00
425,460.00
65,000.00 48,750.00
90,000.00 2,250.00
51,000.00
51,000.00
65,000.00 32,500.00
90,000.00 4,500.00
37,000.00
37,000.00
160,000.00 192,000.00
65,000.00 19,500.00
90,000.00 900.00
20,400.00
212,400.00
225,000.00 270,000.00
1,075.00 125,775.00
240,000.00 134,640.00
530,415.00
65,000.00 97,500.00
80,000.00 60,000.00
80,000.00 6,000.00
90,000.00 6,750.00
170,250.00
700,665.00
225,000.00 270,000.00
160,000.00 69,120.00
339,120.00
65,000.00 50,700.00
80,000.00 31,200.00
90,000.00 3,510.00
85,410.00
424,530.00
650.00 45,500.00
1,075.00 10,406.00
240,000.00 10,800.00
66,706.00
65,000.00 19,500.00
80,000.00 8,000.00
80,000.00 800.00
90,000.00 1,350.00
29,650.00
96,356.00
1,075.00 5,572.80
240,000.00 6,240.00
11,812.80
65,000.00 19,500.00
80,000.00 12,000.00
80,000.00 1,200.00
90,000.00 1,350.00
34,050.00
45,862.80
15,800,000.00 3,160,000.00
65,000.00 97,500.00
18,000.00 7,200.00
11,000.00 1,732,500.00
17,000.00 38,250.00
1,075.00 361,200.00
240,000.00 129,600.00
260,000.00 210,600.00
5,736,850.00
65,000.00 344,500.00
80,000.00 22,000.00
80,000.00 104,000.00
80,000.00 84,000.00
80,000.00 20,960.00
90,000.00 23,850.00
599,310.00
6,336,160.00
2,000,000.00 800,000.00
13,000.00 52,000.00
18,000.00 36,000.00
11,000.00 3,465,000.00
17,000.00 76,500.00
1,075.00 361,200.00
240,000.00 129,600.00
260,000.00 210,600.00
3,163,000.00 474,450.00
109,000.00 381,500.00
18,000.00 360,000.00
6,346,850.00
65,000.00 458,250.00
80,000.00 22,000.00
80,000.00 132,000.00
80,000.00 168,000.00
80,000.00 32,240.00
90,000.00 31,770.00
844,260.00
7,191,110.00
2,000,000.00 640,000.00
13,000.00 41,600.00
18,000.00 28,800.00
11,000.00 2,310,000.00
17,000.00 51,000.00
1,075.00 361,200.00
240,000.00 129,600.00
260,000.00 210,600.00
3,163,000.00 442,820.00
109,000.00 305,200.00
18,000.00 288,000.00
4,808,820.00
65,000.00 412,750.00
80,000.00 22,000.00
80,000.00 132,000.00
80,000.00 112,000.00
80,000.00 26,640.00
90,000.00 28,620.00
734,010.00
5,542,830.00
2,000,000.00 540,000.00
13,000.00 26,000.00
18,000.00 10,800.00
11,000.00 2,310,000.00
17,000.00 51,000.00
1,075.00 361,200.00
240,000.00 129,600.00
260,000.00 210,600.00
3,639,200.00
65,000.00 367,250.00
80,000.00 22,000.00
80,000.00 124,800.00
80,000.00 112,000.00
80,000.00 25,840.00
90,000.00 25,470.00
677,360.00
4,316,560.00
1,075.00 234,350.00
240,000.00 124,800.00
260,000.00 226,200.00
585,350.00
65,000.00 107,250.00
80,000.00 20,000.00
90,000.00 7,200.00
134,450.00
719,800.00
8,855,000.00 10,626,000.00
13,000.00 16,250.00
19,000.00 19,000.00
10,661,250.00
65,000.00 390,000.00
80,000.00 1,440,000.00
80,000.00 144,000.00
90,000.00 27,000.00
2,001,000.00
12,662,250.00
9,150,000.00 366,000.00
19,000.00 9,500.00
375,500.00
65,000.00 65,000.00
80,000.00 240,000.00
80,000.00 24,000.00
90,000.00 4,500.00
333,500.00
709,000.00
8,855,000.00 123,970.00
8,855,000.00 504,735.00
65,000.00 16,250.00
644,955.00
65,000.00 9,750.00
80,000.00 20,000.00
80,000.00 2,000.00
90,000.00 6,750.00
38,500.00
683,455.00
5,693,000.00 6,831,600.00
12,000.00 180,000.00
13,000.00 72,800.00
7,084,400.00
65,000.00 435,500.00
80,000.00 1,608,000.00
80,000.00 160,800.00
90,000.00 30,150.00
2,234,450.00
9,318,850.00
4,000.00 100,000.00
100,000.00
65,000.00 9,750.00
80,000.00 6,000.00
90,000.00 720.00
16,470.00
116,470.00
-
1,075.00 8,600.00
240,000.00 7,680.00
16,280.00
65,000.00 26,000.00
80,000.00 16,000.00
90,000.00 180.00
42,180.00
58,460.00
12,000,000.00 132,000.00
13,000.00 650.00
132,650.00
65,000.00 6,500.00
80,000.00 16,000.00
90,000.00 450.00
22,950.00
155,600.00
9,150,000.00 137,250.00
13,000.00 130.00
137,380.00
65,000.00 52,000.00
80,000.00 64,000.00
80,000.00 6,400.00
90,000.00 3,600.00
126,000.00
263,380.00
11,916.67 79,007.52
1,075.00 10,535.00
240,000.00 10,800.00
1,800.00 2,340.00
102,682.52
60,000.00 15,000.00
80,000.00 10,000.00
80,000.00 1,040.00
80,000.00 1,040.00
27,080.00
129,762.52
54,000.00 1,431,000.00
1,075.00 9,997.50
240,000.00 4,320.00
1,800.00 3,492.00
1,448,809.50
60,000.00 54,000.00
80,000.00 36,000.00
80,000.00 3,600.00
80,000.00 3,600.00
97,200.00
1,546,009.50
60,000.00 60,000.00
60,000.00
60,000.00 1,200.00
80,000.00 16,000.00
80,000.00 1,600.00
80,000.00 1,600.00
20,400.00
80,400.00
131,400.00 131,400.00
131,400.00
60,000.00 600.00
80,000.00 40,000.00
80,000.00 4,000.00
80,000.00 400.00
45,000.00
176,400.00
131,400.00 131,400.00
131,400.00
60,000.00 300.00
75,000.00 37,500.00
80,000.00 4,000.00
80,000.00 240.00
42,040.00
173,440.00
42,100.00 42,100.00
42,100.00
75,000.00 1,125.00
80,000.00 12,000.00
80,000.00 640.00
13,765.00
55,865.00
42,100.00 42,100.00
42,100.00
75,000.00 1,125.00
80,000.00 12,000.00
80,000.00 640.00
13,765.00
55,865.00
9,000.00 9,000.00
9,000.00
60,000.00 900.00
80,000.00 12,000.00
80,000.00 1,200.00
80,000.00 64.00
14,164.00
23,164.00
9,000.00 9,000.00
9,000.00
60,000.00 600.00
80,000.00 8,000.00
80,000.00 800.00
80,000.00 80.00
9,480.00
18,480.00
3,000.00 3,000.00
3,000.00
60,000.00 900.00
80,000.00 12,000.00
80,000.00 1,200.00
80,000.00 640.00
14,740.00
17,740.00
100,000.00 110,000.00
60,000.00 6,000.00
110,000.00
60,000.00 900.00
75,000.00 11,250.00
80,000.00 1,200.00
80,000.00 640.00
13,990.00
123,990.00
15,000.00 1,500.00
25,000.00 2,500.00
25,000.00 6,500.00
10,500.00
60,000.00 1,200.00
75,000.00 4,725.00
80,000.00 504.00
80,000.00 200.00
6,629.00
17,129.00
33,000.00 6,600.00
30,000.00 4,500.00
55,000.00 9,350.00
55,000.00 14,300.00
9,000.00 90.00
17,000.00 510.00
5,700.00 1,140.00
36,490.00
65,000.00 4,550.00
80,000.00 720.00
80,000.00 480.00
90,000.00 225.00
5,975.00
42,465.00
5,060.00 5,060.00
21,312.00 21,312.00
35,000.00 35,000.00
42,000.00 42,000.00
9,441.00 118,012.50
1,500.00 18,000.00
1,725.00 17,250.00
256,634.50
30,000.00 30,000.00
30,000.00
286,634.50
5,000.00 5,000.00
9,441.00 9,441.00
1,500.00 18,750.00
500.00 500.00
33,691.00
30,000.00 30,000.00
30,000.00
63,691.00
42,500.00 42,500.00
30,500.00 30,500.00
9,441.00 9,441.00
1,500.00 18,750.00
500.00 500.00
101,691.00
30,000.00 30,000.00
30,000.00
131,691.00
1,150,000.00 1,150,000.00
1,150,000.00 69,000.00
1,219,000.00
60,000.00 198,000.00
75,000.00 82,500.00
80,000.00 800.00
80,000.00 12,800.00
294,100.00
1,513,100.00
135,000.00 135,000.00
-
135,000.00
60,000.00 60,000.00
75,000.00 112,500.00
80,000.00 12,000.00
80,000.00 13,200.00
197,700.00
332,700.00
225,000.00 225,000.00
225,000.00 27,000.00
1,200.00 7,200.00
220,000.00 2,200.00
261,400.00
60,000.00 72,000.00
75,000.00 108,750.00
80,000.00 12,000.00
80,000.00 4,800.00
197,550.00
204,750.00
650.00 97,500.00
1,200.00 144,000.00
220,000.00 66,000.00
2,160.00 235,440.00
1,800.00 10,800.00
553,740.00
60,000.00 360,000.00
75,000.00 225,000.00
80,000.00 24,000.00
80,000.00 2,400.00
611,400.00
611,400.00
25,000.00 30,000.00
25,000.00 8,750.00
38,750.00
60,000.00 2,160.00
75,000.00 4,500.00
80,000.00 480.00
80,000.00 160.00
7,300.00
46,050.00
162,500.00 195,000.00
210,000.00 56,875.00
251,875.00
60,000.00 4,680.00
75,000.00 10,125.00
80,000.00 1,080.00
80,000.00 320.00
16,205.00
268,080.00
210,000.00 252,000.00
210,000.00 73,500.00
325,500.00
60,000.00 4,860.00
75,000.00 10,125.00
80,000.00 1,080.00
80,000.00 320.00
16,385.00
341,885.00
230,500.00 230,500.00
50,000.00 50,000.00
280,500.00
60,000.00 1,800.00
75,000.00 22,500.00
80,000.00 2,400.00
80,000.00 1,200.00
27,900.00
308,400.00
4,000.00 4,000.00
4,000.00
60,000.00 600.00
75,000.00 7,500.00
80,000.00 800.00
80,000.00 400.00
9,300.00
13,300.00
19,800.00 19,800.00
3,300.00 3,300.00
23,100.00
60,000.00 600.00
75,000.00 30,000.00
80,000.00 3,200.00
80,000.00 400.00
34,200.00
57,300.00
DAFTAR RENCANA ANGGARAN BIAYA
NO JENIS PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN PASANGAN PONDASI
IV PEKERJAAN DINDING
V PEKERJAAN BETON
VI PEKERJAAN KUSEN, PINTU DAN JENDELA
VII PEKERJAAN DAUN PINTU DAN JENDELA
VII PEKERJAAN PENGGANTUNG ATAU PENGUNCI
IX PEKERJAAN LANTAI DAN DINDING KERAMIK
X PEKERJAAN LANGIT-LANGIT
XI PEKERJAAN INSTALASI LISTRIK
XII PEKERJAAN ATAP
XIII PEKERJAAN PENGECATAN
XIV PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
JUMLAH
PPN 10%
TOTAL
LUAS TOTAL BANGUNAN M2
HARGA per M² (Rp)
TOTAL BIAYA
(Rp)
33,709,360.00
15,325,607.10
35,718,148.33
47,501,390.28
137,930,534.03
12,890,170.50
2,406,408.13
7,001,983.00
35,725,329.98
86,797,954.23
13,476,824.50
178,971,792.38
28,288,074.96
10,165,469.38
645,909,046.80
64,590,904.68
710,499,951.48
200
3,552,499.76
KURVA S
TOTAL BIAYA BOBOT DURASI
NO JENIS PEKERJAAN
(Rp) (%) (MINGGU)
I PEKERJAAN PERSIAPAN 33,709,360.00 5.22 2
II PEKERJAAN TANAH 15,325,607.10 2.37 2
III PEKERJAAN PASANGAN PONDASI 35,718,148.33 5.53 3
IV PEKERJAAN DINDING 47,501,390.28 7.35 2
V PEKERJAAN BETON 137,930,534.03 21.35 3
VI PEKERJAAN KUSEN, PINTU DAN JENDELA 12,890,170.50 2.00 2
VII PEKERJAAN DAUN PINTU DAN JENDELA 2,406,408.13 0.37 1
VII PEKERJAAN PENGGANTUNG ATAU PENGUNCI 7,001,983.00 1.08 1
IX PEKERJAAN LANTAI DAN DINDING KERAMIK 35,725,329.98 5.53 2
X PEKERJAAN LANGIT-LANGIT 86,797,954.23 13.44 2
XI PEKERJAAN INSTALASI LISTRIK 13,476,824.50 2.09 1
XII PEKERJAAN ATAP 178,971,792.38 27.71 2
XIII PEKERJAAN PENGECATAN 28,288,074.96 4.38 2
XIV PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR 10,165,469.38 1.57 2
JUMLAH 645,909,046.80 100.00 27
JUMLAH
KUMULATIF
KURVA S
DALAM MINGGU
1 2 3 4 5 6 7 8 9 10 11
2.61% 2.61%
1.19% 1.19%
1.84% 1.84% 1.84%
3.68% 3.68%
7.12% 7.12% 7.12%
1.00% 1.00%
0.37%
1.08%
2.77% 2.77%
6.72% 6.72%
2.09%
13.85% 13.85%
2.19%
0.79% 0.79%
2.61% 3.80% 3.03% 8.96% 9.75% 11.58% 4.67% 2.45% 16.62% 25.43% 8.91%
2.61% 6.41% 9.43% 18.40% 28.14% 39.73% 44.40% 46.86% 63.48% 88.90% 97.81%
12
2.19%
2.19%
100.00%
NILAI BOBOT KEGIATAN TIAP MINGGU
I PEKERJAAN PERSIAPAN 2
II PEKERJAAN TANAH 2
III PEKERJAAN PASANGAN PONDASI 3
IV PEKERJAAN DINDING 2
V PEKERJAAN BETON 3
VI PEKERJAAN KUSEN, PINTU DAN JENDELA 2
VII PEKERJAAN DAUN PINTU DAN JENDELA 1
VII PEKERJAAN PENGGANTUNG ATAU PENGUNCI 1
IX PEKERJAAN LANTAI DAN DINDING KERAMIK 2
X PEKERJAAN LANGIT-LANGIT 2
XI PEKERJAAN INSTALASI LISTRIK 1
XII PEKERJAAN ATAP 2
XIII PEKERJAAN PENGECATAN 2
XIV PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR 2
BOBOT TIAP MINGGU (%)
5.76/2=2.88
1.67/2=0.84
4.54/3=1.51
16.9/2=8.10
26.51/2=8.84
5/2=2.5
0.88/1=0.88
0.71/1=0.71
15.6/2=7.8
2.85/2=1.42
1.3/1=.3
14.09/2=7.05
3.46/2=1.73
1.43/2=0.72
JUMLAH BOBOT PEKERJAAN
2.88%
2.88+3.72=6.60%
6.60+2.35=8.95%
8.95+10.35=19.30%
19.30+11.06=30.36%
30.36+17.65=48.01%
48.01+10.60=58.61%
58.61+4.10=62.70%
62.70+14.84=77.55%
77.55+17.57=95.11%
95.11+3.15=98.27%
98.27+1.73=100%