This document discusses several issues to be consulted on with PJT2 regarding water management:
1. River water inflow data to irrigation systems and overflow from rivers.
2. Water supply data from canals to irrigation systems.
3. Infrastructure data at Binong and Patrol sections.
4. Issues with tertiary blocks over 100 ha and preparation of planting and water distribution plans.
5. Procedures for water distribution implementation and interaction with village leaders.
6. Issues with rotation schedules and flow measurement.
This document discusses several issues to be consulted on with PJT2 regarding water management:
1. River water inflow data to irrigation systems and overflow from rivers.
2. Water supply data from canals to irrigation systems.
3. Infrastructure data at Binong and Patrol sections.
4. Issues with tertiary blocks over 100 ha and preparation of planting and water distribution plans.
5. Procedures for water distribution implementation and interaction with village leaders.
6. Issues with rotation schedules and flow measurement.
This document discusses several issues to be consulted on with PJT2 regarding water management:
1. River water inflow data to irrigation systems and overflow from rivers.
2. Water supply data from canals to irrigation systems.
3. Infrastructure data at Binong and Patrol sections.
4. Issues with tertiary blocks over 100 ha and preparation of planting and water distribution plans.
5. Procedures for water distribution implementation and interaction with village leaders.
6. Issues with rotation schedules and flow measurement.
This document discusses several issues to be consulted on with PJT2 regarding water management:
1. River water inflow data to irrigation systems and overflow from rivers.
2. Water supply data from canals to irrigation systems.
3. Infrastructure data at Binong and Patrol sections.
4. Issues with tertiary blocks over 100 ha and preparation of planting and water distribution plans.
5. Procedures for water distribution implementation and interaction with village leaders.
6. Issues with rotation schedules and flow measurement.
River inflow to irrigation system, from: Ciasem Debit dari Sungai Ciase, Cigadung dan River, Cigadung River and Cipunagara River Cipunagara (yang masuk ke irigasi dan yang melimpas) Data collection on supply water from ETC to Data aliran dari Saluran Tarum Timur ke DI Macan, Gadung and Bugis system Macan, DI Gadung dan ke Induk Bugis Data on infrastructures at Binong and Patrol Data kondisi bangunan dan saluran di section Seksi Binong dan Seksi Patrol Issues on tertiary block more than 100 ha Isu petak tersier yang lebih dari 100 ha Preparation on RTTG (planting plan) Persiapan penyusunan RTTG Preparation on water distribution based on Persiapan penyusunan Pembagian air (SK RTTG Direksi) Water distribution implementation Pelaksanaan pembagian air (tata cara dan (procedures and monitoring) interact with monitoring) – interaksi dengan TPOP dan TPOP personnel, village ulu-ulu(s) Ulu-ulu Desa Issue on giliran or gilir-giring (three days Isu-isu Pelaksanaan giliran atau gilir giring downstream part and another three days for (tiga hari bagian hilir dan tiga hari bagian upper part of the system) hulu) Issues on flow measurement Issues on water distribution for fisheries Issues on water allocation for non-irrigation provision Issues on dewatering of canal Interact with WUA on water management Interact with district agencies Interact with villages (Ulu-ulu) on water management Issues on collaboration with TPOP personnel Issues on flooding and shortage of water in Subang and Indramayu area Report on water management Comment on future tanam gadu, tanam palawija, and fisheries Comment on future real time water management Comment on future rehabilitation for modernization of irrigation system Proposal on future water management at downstream part of Binong (daerah tambak dan banjir) Comment on options of water management of Pangarengan system Recommendation on modernization of JIS