Project: Fkcci Auditorium Comparison Between All 3 Options
Project: Fkcci Auditorium Comparison Between All 3 Options
Option-1 : Centralized Chilled Water System with Radiant Option-2 : Centralized Chilled Water System with Ductable
Sl No
cooling for Auditorium AC for Auditorium
Same as option-2
Life period of 10 years
Same as option-2
Same as option-2
Not possible
Same as option-2