Submitted by
Utsav Goyal
B. Tech 4th year
Department of Electrical & Electronics Engineering
Naraina College of Engineering & Technology, Kanpur
Uttar Pradesh, India
ACKNOWLEDGEMENT
Due to all the above reasons and to bridge the gap between theory
and practical, our engineering curriculum provides a practical training of
30 days. During this period, a student works in the industry and gets
all type of experience and knowledge about the working and
maintenance of various types of machinery.
UTSAV GOYAL
INDEX
S.No.
01. INTRODUCTION
11. PRESSING
24. INSULATION
26. FINISHING
28. TESTING
31. CONCLUSION
INTRODUCTION
In 1956, India took a major step towards the
establishment of its heavy engineering industry when Bharat
Heavy Electrical Ltd., the first heavy electrical manufacturing unit
of the country was setup at Bhopal. It progressed rapidly and three more
factories went into production in 1965. The main aim of establishing
BHEL was to meet the growing power requirement of the country.
B.H.E.L appeared on the power map of India in 1969 when the first
unit supplied by it was commissioned at the Basin Bridge Thermal
Power Station in Tamil Nadu. Within a decade, BHEL had
commissioned the 100 unit at Santaldih. West Bengal.
BHEL had taken India from a near total dependence on imports to
complete self-reliance in this vital area of power plant equipment
BHEL has supplied 97% of the power generating equipment. BHEL
has already supplied generating equipment to various utilities capable
of generating over 18000 MW power. Today BHEL can produce
annually; equipment capable of generating 6000MW. This will grow
further to enable BHEL to meet all of India’s projected power equipment
requirement. As well as sizeable portion of export targets.
In the world power scene, BHEL ranks among the top ten
manufactures of power plant equipment and in terms of the spectrum of
products and services offered, it is right on top. BHEL’s technological
excellence and turnkey capabilities have won it worldwide recognition.
Over 40 countries in the world over have placed orders with BHEL
covering individual equipment to complete power stations on a turnkey
basis.
In 1978-79 export earnings reached Rs. 122 crores, the highest for
any one-year.
BHEL has its headquarters at New Delhi. Its operations are
spread over 11
manufacturing plants and number of engineering and service divisions
located across the
country/ the service divisions includes a network of regional branch
offices throughout
India.
BHEL has:-
Installed equipment for over 90,000MW of power
generation for Utilities, captive and Industrial users.
Supplied over 25000 Motors with Drive Control System to power
projects, Petrochemicals Refineries, Steel, Aluminum, Fertilizer,
Cement plant, etc.
Supplied Traction electrics and AC/DC locos over
12000 kms Railway network.
Supplied over one million Values to Power Plants and other
Industries
BHEL - AN OVERVIEW
The first plant of what is today known as BHEL was established
nearly 40 years ago at Bhopal & was the genesis of the Heavy Electrical
Equipment industry in India.
Power
Industry
Transportation
Transmission
Defenses etc.
14 Manufacturing Divisions
9 Service Centers
BUSINESS SECTOR
POWER SECTOR
Custom-made huge hydro sets of Francis, Elton and Kaplan types for
different head- discharge combinations are also engineered and
manufactured by BHEL.
INDUSTRY SECTOR
Petrochemicals
Fertilizers
Steel paper
Refineries
Heat exchangers
TRANSPORATION :-
Electric locomotive
1). Block-1:-
In block one turbo generator, generator, exciter motors
(A.C&D.C) are manufactured & assembled
2). Block-2:-
In block two large size fabricated assemblies\component for power
equipment are manufactured & assembled.
3) Block-3:-
In block -3 steam turbine, hydro turbines, and gas turbines,
turbines blade are manufactured & assembled
4) Block-4:-
In block -4winding for turbo generator, hydro generator, insulation
of A.C&D.C motors insulating component for turbo generator,
hydro generator motors are manufactured & assembled
5) Block-5:-
In block -5 fabricated parts of steam turbine water box, hydro
turbine turbines parts are manufactured & assembled
6) Block-6:-
In block -6 fabricated oil tanks hollow guide blades, rings,
stator frames rotor spiders are manufactured & assembled
7) Block-7:-
In block -7all types of dies including stamping dies, stamping
for generators &motors are manufactured & assembled
8) Block-8:-
In block -8 LP heaters, ejectors, steam coolers, oil coolers, ACG
coolers, oil tanks are manufactured & assembled
MANUFACTURING DIVISIONS
Heavy Electrical Plant, Piplani, Bhopal
Electrical Machines Repair Plant (EMRP), Mumbai
Electronics Division :
VISION
MISSION
VALUES
HR BARS
Manufacturing of bars of different capacity depends upon the
water head available at site. The hydro generator is air called
generator of lesser length.
MATERIAL CHECKING
Lower Bar
a. Solid conductor length = 10,200mm (10 Plates)
b. Hollow conductor length = 10,200mm (10 Plates)
Upper Bar
a. Solid conductor length = 10,050mm (10 Plates)
b. Hollow conductor length = 10,050mm (10 Plates)
This insulation is removed from both ends after the cutting of conductor
i.e. 500mm for both lower & upper bar.
TRANSPOSITION OF CONDUCTOR
Transposition means changing or shifting of position of each
conductor in active care (slot) part. After cutting the required
number of conductors are arranged on the comb in staggered
manner and than bands are given to the conductor with the help of
bending die at required distance.
Setting of die
The core part of the bar stack is pressed in press under the pressure
between 70kg to 80kg (various from product to product) and the
temperature between 90 Deg.C to 160 Deg.C for a given period.
Here four bars is pressed in one time and six to eight plates are used
for pressing. After that the consolidated stack is withdrawn from the
press.
In this test first we make the distance to the non insulating portion of
the bar. Here we check the short between any two conductor. After
this test the bars are again go for the second pressing. In which
attached full slot separator between two half bar no-max paper and
tapped with transparent film. In this test if any error is found then it
has to be rectified.
FORMING OF BAR
In this process contact sleeve and the bottom part of the water box
are adjust at the give dimensions. The operation of mounting of
contact sleeve and bottom part of water box is complete in following
steps-
a. Check the dimension of contact sleeve and water box bottom part.
b. Stand by bar for setting of lug.
c. Setup to the solid conductor in each row as per drawing.
d. Then insert the contact sleeve upon the solid and hollow conductor
and temporally installed to it. And also installed the bottom part of
water box.
e. Maintain the gap between contact sleeve and bottom part of water
box approx 20mm.
After the lug mounting cutting of extra solid conductor.
MAIN BRAZING
After the main brazing bars is moved for cutting of extra part of
conductors as per drawing. Here cut the end part of the bottom part
of water box and taken for face milling.
In this process the conductor is given the accurate shaped as per the
measurement and it is taken in account that any part of the surface is
not left uneven and dull.
Then in Debbering, the bars edges are many a time left with twigs
and sharp needle type mettle cutting known as bar and this process
of removing is known as Debbering.
FIRST PICKLING
This is the same process of pickling which is done before the lug
mounting or zero pickling. After this pickling process the bar is
moved the brazing of top part of water box in both side.
Thought the induction process the top part of water box is brazed in
both side.
As per the previous main brazing first we stand by bars of setting for
brazing then we attached the top part from the bottom part of water
box. Then healed the top part by top inductors at the temperature of
400Deg.c.
For this type of brazing use L-Ag-40Cd. This is the alloy silver
academy which have 40% cadmium and the melting point is 400 Deg.C
to 500 Deg.C. This brazing is done for both end.
After the brazing the bars is go for second pickling which is the same
process as previously explain.
Thought this test check the flow water equivalently in the hollow
conductor of the bar. There is the following steps of checking-
a. Water should be exit all the total hollow conductor.
b. If some burrs are jammed it should be removed to give very high
pressure of water and clean with the help of solid wire.
c. The main point of testing is that the water flow into the bar and exit
from the water box fall down approximately to cover 1 Mtr. From
each conductor.
In this test the bar is tested for leakage into the components of bar. In
this test flow of nitrogen gas with pressure of 10kg/Cm2 to check the
leakage in to the hollow conductor. If leakage found the bar is
rejected.
THERMAL SHOCK TEST
The cycles of hot (80 Deg.C) and cold (30 Deg.C) water are flew
thought the bar to ensure the thermal expansion and contraction of
the joints. The time of low of hot & cold water should be approx 32
to 40min and give the time between to flow of hot & cold water is 5
min. this process is applied atleast 8 hours.
In this test the bar’s end is tested to flow of helium gas with the
given pressure if the end part of the bar is leakage then the helium
gas is covered the surface of water box and indicator indicate the
point of leakage.
INSULATION
For the insulation sunmika therm tape or sunmika pleese tape is used
which is the combination of mica + glass + varnish. It is used for
corona protection. In this insulation to layer of pleese tape + to layer
of therm tape and after them again to mica pleese tape is used.
Process of Insulation
a. Clean the bar.
b. Clean with chemical or thinner.
c. Taping
d. Realizing film from the mica plastic section.
In insulation the wall thickness of insulation is subjected to the generating
voltage of the machine.
FINISHING
If the bar is passed in all the operation and testing after completing
then the bar is send for stator winding.
TURBO GENERATORS
stator
Vertically side mounted coolers in a
separate housing
hydrogen cooled
Symmetrical ventilation.
MOTOR WINDING
(1) Count the coil groups in the anti clock wise direction locking from the
connection end.
(2) Leads of the coils groups lying on the outer periphery of the overhang
position shall be the finish and those lying on the inner periphery shall be
(3) Leads shall be taken form the coil side lying at inner periphery of slot
No.1.
(4) The coil group No.1 shall Lie at top with its axes coinciding with the
and 02 U1, V1, W1 for right hand side terminal box. When looking
Circuit diagram:-
NO. OF PHASE 3
NO. OF POLES 6
PHASE CONNECTION Y
NO. OF PARELLEL PATH 2
NO. OF COIL GROUP 18
9.3 Connection of motor winding
CONCLUSION
But there are few factors that require special mention. Training
is not carried in true spirit. It is recommended that there should be
projectors especially for trainees where presence of authorities is ensured.