Vertical Estimates

1. Concrete Materials (if mixed at site)


Strength, Strength, Cement, Gravel, Mixture Cement,
Sand, cu.m Sand, cu.m
Mpa psi bags cu.m class Proportion bags
55.15808 8000 21 0.32 0.72 AA 1:1 1/2 : 3 12 0.5
48.26332 7000 19 0.34 0.73 A 1: 2: 4 9 0.5
41.36856 6000 17 0.36 0.74 B 1:2 1/2 : 5 7.5 0.5
34.4738 5000 14 0.38 0.75 C 1: 3: 6 6 0.5
27.57904 4000 11 0.4 0.76
20.68428 3000 7.85 0.42 0.84
17.2369 2500 5.49 0.44 0.89

2. Formworks
Materials No. of Use (per sq.m)
1 2 3 4 Lumber Bdft
Plywood (pcs) 0.336 0.605 0.857 1.076 2 x 2 x 12 4.0
Lumber 2x3x12 (pcs) 0.860 1.548 2.193 2.752 2 x 3 x 12 6.0
Lumber 2x4x12 (pcs) 1.610 2.898 4.106 5.152 2 x 4 x 12 8.0
Nails (kg) 0.173 0.311 0.440 0.552
Form Oil (lit) 0.161 0.291 0.412 0.516

3. Steel Works
Materials Wt of Reinforcing Stee
Oxygen 4.4 pcs.per ton steel Diameter
Accetylene 2.2 pcs.per ton steel 10
Welding Rod 0.025 of ton steel (20kg/ box) 4 inch/ rod 12
Paint 2 40 kg 16
Thinner 1 gal / ton steel (1 coat) 20
Equipment 0.4 percent of labor cost

4. Painting Works
4.1 Xyladecor
Wood Lite 0.25 L/ sq.m
Sand Paper 0.3 sq.m/ sq.m
Xyladecor 0.15 L/ sq.m/ coat
Stoppa Rugs 0.1 kgs/ sq.m

4.2 Acdytex
Acrytex Cast 0.225 L/ sq.m
Acrytex Primer 0.15 L/ sq.m
Acrytex Top Coat 0.15 L/ sq.m/ coat
Acrytex Reducer 0.15 L/ sq.m

4.3 Masonry Paint


Masonry Neutralizer 0.1 L/ sq.m
Perma Coat Latex 0.15 L/ sq.m/ coat
Patching Compound 0.05 kg/ sq.m
Sand Paper 0.1 sq.m/ sq.m

4.4 Flatwall Enamel


Flatwall Enamel 0.15 L/ sq.m/ coat
Glazing Putty 0.1 L/ sq.m
Paint Thinner 0.1 L/ sq.m/ coat
Sand Paper 0.05 sq.m/ sq.m

4.5 Duco
Lacquer Flo 0.15 L/ sq.m/ coat
Lacquer Thinner 0.15 L/ sq.m/ coat
Lacquer Primer 0.05 L/ sq.m
Lacquer Primer Putty 0.1 L/ sq.m
Sand Paper 0.1 sq.m/ sq.m
Auto White 0.225 L/ sq.m
4.6 Varnish
Wood Lite 0.3 L/ sq.m
Wood Bleach 0.15 L/ sq.m
Wood Stain 0.15 L/ sq.m
Sanding Sealer 0.1 L/ sq.m
Dead Flat Lacquer 0.15 L/ sq.m/ coat
Sand Paper 0.1 sq.m/ sq.m

Architectural Estimates

1.Floor Finishes
1.1 Red Cement Floor Finish
Red Cement 0.0278 Bag/ sq.m

1.2 Vinyl Tiles


Adhesive 0.072 gal/ sq.m Tile 16"x16"x2mm 6.25
Wax Emulsion 0.006 gal/ sq.m Tile 8"x8"x2mm 25
Tile 12"x12"x2mm 11.11 pcs/ sq.m Tile 6"x6"x2mm 44.44
Tile 10"x10"x2mm 16 pcs/ sq.m Tile 4"x4"x2mm 100
1.3 Unglazed Ceramic Tiles
Scratch Coat 10mm 1:3
Cement 0.12 Bag/ sq.m
Sand 0.01 Cu.m/ sq.m
Adhesive 0.072 Gal/ sq.m
Cement for grout 0.1 Bag/ sq.m
Tile 4"x4"x6mm 97 pcs./ sq.m
Muriatic Acid 0.005 Gal/ sq.m

1.4 Wood Parquet


Scratch Coat 10mm 1:3
Cement 0.12 Bag/ sq.m
Sand 0.01 Cu.m/ sq.m
Parquet Glue 0.2 Gal/ sq.m
Parquet Flooring 10.76 sq. ft/ sq.m

1.5 Marble Slab


Scratch Coat 19mm Thick 1:3
Cement 0.25 Bag/ sq.m
Sand 0.02 Cu.m/sq.m
Marble Tiles 12x12x2" 11 pcs/ sq.m
Cement for grout 0.1 Bag/ sq.m

2. Wall Finishes
2.1 Plywood Paneling on 2"x2" frame @ 400mm O.C.
Joist 2"x2" 5.46 Bd. Ft/ sq.m
Nails 0.89 Kg/ sq.m
Plywood 4'x8'x1/4" 0.7 Pc/ sq.m (DW)
0.35 Pc/ sq.m (SW)

2.2 Plain Cement Plaster 19mm ave. 1:2 Quantity of cement and sand for plaster per sq.m
Cement 0.34 Bags/ sq.m Class 8mm 12mm
Sand 0.018 Cu.m/ sq.m A 0.144 0.216
B 0.096 0.144
2.3 Glazed Tiles C 0.072 0.108
Scratch Coat 12mm Thick 1:2 D 0.06 0.09
Cement 0.23 Bags/ sq.m Sand 0.008 0.012
Sand 0.12 Cu.m/ sq.m
Adhesive 0.083 Bags/ sq.m
Cement for grout 0.1 Bags/ sq.m
Tile 4"x4" 97 Pc/ sq.m
Muriatic Acid 0.005 Gal/ sq.m

2.4 Wallpaper
Wallpaper 1 sq.m/ sq.m
Wall paste 0.04 box/ sq.m

2.5 Pebble Washout


Scratch Coat 19mm 1:2
Cement 0.34 Bags/ sq.m
Sand 0.018 Cu.m/ sq.m
Plaster Coat 10mm 1:2
#5 Pebble Washout 1 Can/ sq.m
Cement 0.17 Bag/ sq.m
Sand 0.009 Cu.m/ sq.m
Water Repellant 0.01 Gal/ sq.m

2.6 Marble Slab


Scratch Coat 19mm 1:2
Cement 0.34 Bag/ sq.m
Sand 0.018 Cu.m/ sq.m
Marble Tiles 12"x12" 11 Pc/ sq.m
Cement Grout 0.1 Bag/ sq.m

3. Ceiling Finishes

3.1 Plywood Ceiling on 2"x2" frame @ 600mm O.C.


Joist 2"x2" 3.66 Bd.ft/ sq.m
Nails 0.89 Kg/ sq.m
Plywood 4'x8'x1/4" 0.35 Pc/ sq.m

3.2 Gypsum Board


Aluminum Tee Runner 3.2 Ln.m/ sq.m
Gypsum Board 1.2x0.6 1.4 Pc/ sq.m
Hanger & Guide Wire 6.54 Kg/ sq.m

4. Miscellaneous
4.1 Wood Cabinet Hardware Accessories
2"x2" 20 Bd.ft/ cu.m Nails
1/2" Plywood 0.5 Pc/ cu.m Ceiling 0.105
1/4" Plywood 2 Pc/ cu.m Dry Wall 0.66
Hardware 400 Php/ cu.m
Assorted Nails 6.15 Kg/ cu.m

4.2 G.I. Roofing


Purlin 2"x3" 6.670 Bd.ft/ sq.m
Roofing Ga. #26 8' 0.720 Pc/sq.m
Rivets 0.300 Kg/sq.m
Misc. Hardware cost of rivets/ sq.m

4.3 Non-shrink grout (Sika Top 122)


Mixture 1:6 (A:B)
Mixture Wt.= 2.15 kg/ 1 liter
Component Wt. = 25 kg/ unit
* 3 to 20mm thick cover
** for thicker cover add plain sand
4.4 Non-shrink Grout (Sika Dur 42)
0.00790 cu.m per set (A+B+C) (15kg)
0.00526 cu.m per bag (10 kg/ bag)
5. Masonry Block laying Block Filler
Mark Area 4" CHB vol cement sand vol cement
W1 8.00 sq.m 100 0.120 1.140 0.120 0.300 2.250

Steel Reinforcement for Concrete Hollow Block Mortar for filler and bloc
Vert'l. Reinforcement Horiz'l. Reinforcement Size of CHB
Spacing Lenth / sq.m Spacing Lenth / sq.m 10 x 20 x 40 - 4"
400 2.93 m 400 3.300 m 12.5 x 20 x 40 - 4"
600 2.13 m 600 2.150 m 15 x 20 x 40 - 4"
800 1.60 m 800 1.720 m 20 x 20 x 40 - 4"
Tie Wire for CHB Reinforcement
Kg per 100 CHB
V-Spacing H-Spacing 25cm Ties 30cm Ties 40cm Ties
400 400 0.0042 0.0051 0.086
600 0.0031 0.0038 0.063
800 0.0028 0.0033 0.039
600 400 0.0028 0.0034 0.057
600 0.0021 0.0025 0.042
800 0.0018 0.0022 0.032
800 400 0.0021 0.0025 0.044
600 0.0016 0.0019 0.032
800 0.0014 0.0017 0.024

6. Scaffoldings
Rentals 220 per cu.m
Installation 140 per cu.m
mobilization 70 per cu.m
demobilization 70 per cu.m

7. PVC Office Partition


(half glass with wire trunking) 5,750.00 per sq.m
2009

8. Rip rap
Quantity of Cement and sand on a stone rip-rap per cu. Meter
Stone Class Cement in bags Sand
Grout mixture cu.m
A B C
Class A 2.574 1.716 1.287 0.143
Class B 2.448 1.62 1.214 0.135
Class C 2.232 1.488 1.116 0.124
Class D 1.944 1.296 0.972 0.108
Gravel,
cu.m
1
1
1
1

Wt of Reinforcing Steel Number of Lateral Ties in one steel bar and quantity per m length of column
kg/m Lateral Ties Number of Length of Number of cut in one Steel Bar length
0.62 Spacing Lateral Ties Ties with
0.89 per m ht. hook and bend 5m 6m 7.5m 9m
1.58 150 6.7 60 0 10 0 15
2.47 70 7 0 0 0
200 5.15 80 6 0 0 11
85 0 7 0 0
250 4.13 90 0 0 8 10
95 5 0 0 0
300 3.43 100 5 6 0 9
105 0 0 7 0
350 3 110 0 0 0 8
115 0 5 0 0
400 2.64 120 4 5 0 0
125 4 0 6 0
450 2.36 130 0 0 0 0
135 0 0 0 0
500 2.14 140 0 4 0 0
145 0 4 5 6
550 1.96 150 0 4 5 6
160 3 0 0 0
600 1.81 170 0 0 0 5
180 0 0 4 5
190 0 3 0 0
200 0 3 0 0

Quantity of Reinforcing steel bars in a one-way concrete slab Quantity of Reinforcing Tie w
Bar Spacing Number of steel bars per square meter Bar Spacing
mm 6m 7.50 m 9.0m 12 m mm
100 3.764 2.937 2.421 1.769
125 3.062 2.381 1.934 1.427 100
150 2.584 2.004 1.636 1.197 125
175 2.232 1.726 1.407 1.033 150
200 1.98 1.528 1.258 0.914 175
225 1.786 1.369 1.109 0.81 200
250 1.627 1.25 1.014 0.736 225
300 250
300
Quantity of Reinforcing steel bars in a one-way concrete slab Quantity of Reinforcing Tie w
Bar Spacing Number of steel bars per square meter Bar Spacing
mm 6m 7.50 m 9.0m 12 m mm
100 4.369 3.337 2.772 2.022
125 3.603 2.662 2.245 1.635 100
150 3.221 2.296 1.921 1.382 125
175 2.647 2.025 1.65 1.196 150
200 2.36 1.775 1.461 1.056 175
225 2.168 1.601 1.312 0.907 200
250 1.977 1.466 1.217 0.862 225
300 250
300

pcs/ sq.m
pcs/ sq.m
pcs/ sq.m
pcs/ sq.m

nd for plaster per sq.m


16mm 20mm 25mm
0.288 0.36 0.45
0.192 0.24 0.3
0.144 0.18 0.225
0.12 0.15 0.188
0.016 0.02 0.025
kg per sq. m
kg per sq. m

Block Filler
sand gravel
0.150 0.300

Mortar for filler and block laying


A B C
0.792 0.522 0.394
1.155 0.770 0.5775
1.526 1.018 0.763
2.260 1.500 1.125
12m
20
17
15
14
13
0
12
0
0
0
10
0
9
0
0
0
8
0
7
0
6
6

Quantity of Reinforcing Tie wire in a one-way concrete slab


Length of steel bars
6m 7.50 m 9.0m 12 m
0.3 0.4 0.3 0.4 0.3 0.4 0.3 0.4
0.474 0.632 0.462 0.616 0.46 0.614 0.448 0.598
0.316 0.422 0.307 0.409 0.295 0.394 0.293 0.391
0.228 0.303 0.217 0.289 0.214 0.285 0.207 0.276
0.168 0.224 0.162 0.216 0.158 0.21 0.153 0.204
0.132 0.175 0.126 0.168 0.125 0.167 0.12 0.16
0.11 0.174 0.102 0.135 0.099 0.132 0.095 0.126
0.089 0.118 0.086 0.114 0.081 0.108 0.077 0.103
Quantity of Reinforcing Tie wire in a one-way concrete slab
Length of steel bars
6m 7.50 m 9.0m 12 m
0.3 0.4 0.3 0.4 0.3 0.4 0.3 0.4
0.592 0.896 0.648 0.863 0.648 0.864 0.596 0.794
0.416 0.554 0.42 0.56 0.431 0.574 0.421 0.561
0.35 0.466 0.307 0.409 0.257 0.343 0.297 0.396
0.247 0.33 0.231 0.308 0.223 0.298 0.206 0.275
0.174 0.232 0.171 0.227 0.173 0.231 0.163 0.217
0.168 0.224 0.15 0.2 0.148 0.198 0.13 0.173
0.142 0.189 0.134 0.178 0.114 0.152 0.116 0.155
Vertical Estimates
A. Earthworks
1. Excavation
Man Day/ Eqpt. Hr./
cu.m cu.m
1.1 Common Earth 1.04 0.067 Backhoe
1.2 Sand/ Silt 1.31 0.077 Backhoe
1.3 Clay/ Heavy Soil 1.64 0.097 Backhoe
1.4 Rock/ Adobe 2.04 1 Jackhammer
2. Backfilling
2.1 Common Earth 0.45 0.034 Loader
2.2 Escombro 0.55 0.044 Loader
2.3 Gravel Fill 0.65 0.048 Loader
3. Compaction (Eqt. Only)
0.072 Roller
0.067 Plate Compactor
4. Clearing and Grubbing
Manual 0.4 Man Hr/ sq.m
Equipment 0.008 Eqpt. Hr/ sq.m (includes gas and operator)

B. Rebar Works
Difficulty Man Day/
Structure
Factor Kg
Foundation 1.00 0.0100
Beam 1.05 0.0105
Slab 1.03 0.0103
Column 1.08 0.0108
Shear Wall 1.06 0.0106
Stair 1.05 0.0105

C. Concrete Works Ideal Crew Output (cu.m/ d

Method Foundation Beam Slab

1.00 1.15 1.20


1. Place concrete directly from ready mixed truck 60.00 52.17 50.00
2. Place concrete from ready mixed truck to wheel barrows 90.00 78.26 75.00
3. Place concrete from ready mixed truck to concrete buggies 12.50 10.87 10.42
4. Hoisting concrete in buggies vertically with hoist 12.50 10.87 10.42
5. Hoisting concrete in crane bucket and placing (30min/ truck) 25.00 21.74 20.83
6. Hoisting concrete in crane bucket and placing in a hopper 7.50 6.52 6.25
7. Placing concrete with a concrete pump 45.00 39.13 37.50
8. Mixing concrete with bagger mixer and placing 6.00 5.22 5.00
9. Mixing and placing concrete manually 4.00 3.48 3.33

D. Masonry
Sq.m/ Man
Day
4" CHB 4.44
5" CHB 4.00
6" CHB 3.64

E. Formworks
Man Hour Table per sq.m

Structure Assemble Erect Strip/ Clean Repair


Foundation 0.530 0.32 0.32 0.21
Beam 0.860 0.43 0.43 0.43
Slab 0.640 0.32 0.32 0.32
Column 0.630 0.43 0.43 0.32
Shear Wall 0.730 0.43 0.43 0.21
Satir 1.070 0.75 0.43 0.53

F. Steel Works
Labor Man Hr./ kg
Fabrication 0.22 0.38
Erection 0.16
Delivery 0.04
Painting 0.02

G. Painting Works
Xyladecor 0.4 Man Hr/ sq.m
Acrytex 0.5 Man Hr/ sq.m
Masonry Paint 0.4 Man Hr/ sq.m
Flatwall Enamel 0.5 Man Hr/ sq.m
Duco 1.2 Man Hr/ sq.m
Varnish 1.2 Man Hr/ sq.m

Architectural Estimates

A. Floor Finishes
1.Red Cement Finish
1.1 Spreading 0.12 Man hr/ sq.m
1.2 Trowelling 0.25 Man hr/ sq.m

2. Vinyl Tiles
2.1 Surface Preparation 0.8 Man hr/ sq.m
2.2 Tile Installation 0.67 Man hr/ sq.m

3. Unglazed Ceramic Tiles


3.1 Scratch Coat 1.33 Man hr/ sq.m
3.2 Tile Installation 1.33 Man hr/ sq.m
3.3 Cleaning 0.44 Man hr/ sq.m

4. Wood Parquet
4.1 Scratch Coat 1.34 Man Hr/ sq.m
4.2 Parquet Installation 2 Man Hr/ sq.m
4.3 Sanding 0.5 Man Hr/ sq.m
0.25 Eqpt. Hr/ sq.m (sanding machine)

5. Marble Slab
5.1 Scratch Coat 2 Man Hr/ sq.m
5.2 Marble Installation 2.67 Man Hr/ sq.m
5.3 Sanding 0.67 Man Hr/ sq.m
0.25 Eqpt. Hr/ sq.m (sanding machine)

B. Wall Finishes
1. Plywood Paneling on 2" x 2" frame @ 400mm O.C.
1.1 Frame Installation 0.67 Man Hr/ sq.m
1.2 Panel Installation 0.54 Man Hr/ sq.m

2. Plain Cement Plaster 19mm ave @ 1:2


2.1Interior 1.6 Man Hr/ sq.m
2.2 Exterior 2 Man Hr/ sq.m

3. Glazed Tiles
3.1 Scratch Coat 1.77 Man Hr/ sq.m
3.2 Tile Installation 1.6 Man Hr/ sq.m
3.3 Cleaning 0.44 Man Hr/ sq.m

4. Wall Paper
4.1 Installation 1 Man Hr/ sq.m

5. Pebble Washout
5.1 Scratch Coat 1.77 Man Hr/ sq.m
5.2 Plaster Coat 1.33 Man Hr/ sq.m
5.3 Water Repellant 0.25 Man Hr/ sq.m

6. Marble Slab
6.1 Scratch Coat 2 Man Hr/ sq.m
6.2 Marble Installation 3.2 Man Hr/ sq.m
6.3 Sanding 0.89 Man Hr/ sq.m

7. Ceiling Finishes on 2" x 2" frame @ 600mm O.C.


7.1 Frame Installation 1.33 Man Hr/ sq.m
7.2 Plywood Installation 0.67 Man Hr/ sq.m

8. Gypsum Board
8.1 Frame Installation 1.33 Man Hr/ sq.m
8.2 Board Installation 0.67 Man Hr/ sq.m

9. Miscellaneous
9.1 Wood Cabinet 0.24 Man Hr/ cu.m
9.2 G.I. Roofing 4 Man Hr/ sq.m

C. Scaffolding
Installation 72 Cu. m / crew day 1 Crew:
Dismantle 144 Cu.m / crew day 1 - Supervisor 465.95 465.95
2 - Skilled 315 630
Installation Cost 25.80 per cu.m 3 - Helper 254 762
Dismantle Cost 12.90 per cu.m 1857.95

Others

A. Door Jambs, Doors


Door Jambs Wood to wood 5sets per man-day
Door JambsWood to concrete 3sets per man-day
Installation of door and accessories 4 sets per man-day
al Crew Output (cu.m/ day)

Column Shear Wall Stair Crew

1.15 1.15 1.25 carpenter 1


52.17 52.17 48.00 mason 2
78.26 78.26 72.00 laborer 10
10.87 10.87 10.00
10.87 10.87 10.00
21.74 21.74 20.00
6.52 6.52 6.00
39.13 39.13 36.00
5.22 5.22 4.80
3.48 3.48 3.20
1. Eartworks
1.1 Compaction
4Tons Earth Rammer 20 meter/min
12.9 sq.m/ hr
Dozer 19.115 cu.m/hr