The document provides structural design calculations for the underground middle wall of a sewage treatment plant tank with a capacity of 375KLD. It details the concrete grade, steel grade, wall dimensions, reinforcement sizes and spacing, and checks shear stress, crack width and steel strains to verify the structural design meets requirements. Reinforcement is provided at 150mm and 200mm spacing in vertical and horizontal directions using 12mm diameter bars to resist bending and axial loads on the tank wall section.
The document provides structural design calculations for the underground middle wall of a sewage treatment plant tank with a capacity of 375KLD. It details the concrete grade, steel grade, wall dimensions, reinforcement sizes and spacing, and checks shear stress, crack width and steel strains to verify the structural design meets requirements. Reinforcement is provided at 150mm and 200mm spacing in vertical and horizontal directions using 12mm diameter bars to resist bending and axial loads on the tank wall section.
The document provides structural design calculations for the underground middle wall of a sewage treatment plant tank with a capacity of 375KLD. It details the concrete grade, steel grade, wall dimensions, reinforcement sizes and spacing, and checks shear stress, crack width and steel strains to verify the structural design meets requirements. Reinforcement is provided at 150mm and 200mm spacing in vertical and horizontal directions using 12mm diameter bars to resist bending and axial loads on the tank wall section.
Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
Prepared Checked Approved Rev
Document Number 19-H20-STP-STR-01 VJ GJ DM 0 Title Structural Design Calculation of Underground STP tank Middle Wall (All intermediate walls) Grade of Concrete = 30 N/mm2 Grade of the Steel = 500 N/mm2 Depth of the section assumed = 250 mm Diameter of the bar φ = 12 mm Cover of the section C = 50 mm Effective depth of the section d = 194 mm CASE:II TANK FULL Results from STAAD Pro Group ID G_7MiddleWall L/C Plate ref., 100 4751 My = 0.352 kNm/m 100 4751 Mxy = 0.274 kNm/m 100 4606 Mx = 2.171 kNm/m 100 4606 Mxy = 0.24 kNm/m 100 63 Sx = 0.209 N/mm2 2 100 5434 Qy = 0.009 N/mm 100 5287 Qx = 0.008 N/mm2 Depth required for Balanced Section Max.,Moment = 2.171 kNm/m Depth "d" required for balanced moment = Sqrt(Mu/0.138*fck*b) = 28.05 mm Assumed depth of the section = 250 mm Ok Effective depth of the section = 194 mm Design for Vertical Moment Total Moment = 0.35 kNm/m Factored Moment = 0.5 kNm/m Percentage of Steel required for Mu = 0.01 % Area of the steel required = 19.4 mm2 Calculation of Minimum reinforcement Minimum percentage of the steel required on each face = 0.175% Depth of the Surface Zone = 125 mm Minimum area of Steel required = 218.75 mm2 Spacing of the minimum steel = 517 mm Steel Provided Area of the steel considered = 218.75 mm2 Diameter of bar considered = 12 0 mm Spacing of the steel provided = 517 mm Therefore , spacing provided = 150 mm c/c Ok Design for Horizontal Moment & Axial Tension Total Moment = 2.17 kNm/m Factored Moment = 3.3 kNm/m Percentage of Steel required for Mu = 0.02 % Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
Prepared Checked Approved Rev
Document Number 19-H20-STP-STR-01 VJ GJ DM 0 Title Structural Design Calculation of Underground STP tank
Area of the steel required = 30 mm2
Axial Tension = 52.25 Load Factor = 1.5 Tu = 78.375 Ast required for T = Tu/(0.87*fy) = 180.17241 mm2 2 Total Ast for Tension & Bending = 210.17241 mm Minimum Ast on one side = 0.175% Depth of Surface Zone = 125 mm 2 Minimum Ast = 218.75 mm Steel Provided Area of the steel considered = 218.75 mm2 Diameter of bar considered = 12 0 mm Spacing of the steel provided = 517 mm Therefore , spacing provided = 200 mm c/c Ok Summary of Reinforcement for Bottom 1.0m Direction Face Spacing of bar Dia 1 Dia 2 %Pt Vertical Water 150 12 0 0.388454 Horizontal Water 200 12 0 0.29134 Check for Shear Maximum Shear Stress on the Wall "Qx" = 0.008 N/mm2 Percentage of Steel provided "Pt" = 0.3 % 2 Allowable Shear Stress = 0.37 N/mm Ok 2 Maximum Shear Stress on the Wall "Qy" = 0.009 N/mm Percentage of Steel provided "Pt" = 0.39 % Allowable Shear Stress = 0.37 N/mm2 Ok Crackwidth calculations Service moment @ the point considered "M" = 0.35 kNm/m Compressive strength of concrete(fck) = 30 N/mm2 Ec -Modulus of Elasticity of concrete = 27.386128 kN/mm2 Es -Modulus of Elasticity of steel = 200 kN/mm2 Allowable crackwidth of the section = 0.2 mm Dia of bar provided"db" = 12 mm Spacing provided "s" = 150 mm Area of steel provided on each face "Ast" = 753.6 mm2 Breath of section "b" = 1000 mm Overall depth = 250 mm Clear Cover to the main reinft. = 50 mm Effective depth of the section = 194 mm Percentage of Reinforcement(Pt=Ast/bd) = 0.39 % Project Construction of Sewage Treatmeny Plant of Capacity 375KLD
Prepared Checked Approved Rev
Document Number 19-H20-STP-STR-01 VJ GJ DM 0 Title Structural Design Calculation of Underground STP tank
Modulur Ratio, m, Es/Ec = 14.61
2 Neutral axis depth, 'x' bx /2 = m*Ast*(d-x) = 55.28 mm Effective Cover, 'dc' = 56 mm acr (SQRT((S/2)2+dc2)-(db/2) = 87.61 mm Lever arm 'Z' = 175.58 mm 2 Steel Stress, 'fs' = 2.6602762 N/mm 2 Concrete stress 'fc' = 0.07 N/mm Distance 'a' = 250 mm Strain Es in steel for the stress of = 0.0000133 Strain at the level considered ε1 = (h-x)/(d-x)*εs Strain at the level considered ε1 = 1.867E-05 Strain due to stiffening effect of concrete ε2 = (b*(D-x)(a-x)/(3*Es*As*(d-x) = 0.0006045 Average strain at the level Considered εm = -0.000586 wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = -0.11 Satisfactory