FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 2 / 67
LIST OF REVIEW
Rev.
Paragraph Page Number Description of Change
No.
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 3 / 67
TABLE OF CONTENTS
1. SCOPE 4
2. DEFINITION 4
3. REFERENCE 4
4. ABBREVIATION 4
5. PROJECT OVERVIEW 5
5.1 Plant Location 5
5.2 Scope of the Plant 6
6. BASIC DESIGN DATA 6
6.1 Design Life 6
6.2 Metocean 7
6.3 Geotechnical 18
6.4 Geophysics 50
6.5 Topography & Batimetry 55
6.6 Earthquake 56
7. DESIGN AND ENGINEERING SPECIFICATION 57
7.1 Plant Capacity 57
7.2 Plant Layout 58
7.3 Design Code 58
7.4 Utilitity Facilities 58
8. CIVIL ENGINEERING 59
9. INSTRUMENTATION 59
10. ELECTRICAL 59
11. PROTECTIVE COVER 59
12. FIRE FIGHTING 60
13. UNIT OF MEASUREMENT 60
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 4 / 67
1. SCOPE
The LNG Regasification and Receiving Terminal Facilities will be built in Makassar.
All infrastructure, accommodations, transportation facilities, utilities, etc, will also be
built.
2. DEFINITION
Client : PT Perta Daya Gas
Project Management Consultant : PT Bintang Persada Abadi
Government : The Government of Republic of
Indonesia
Consultant : PT WIJAYA KARYA (Persero) Tbk.
Vendor : All equipment and service supplier
3. REFERENCE
3.1 Applicable Codes Standards and Regulations
The Project Specifications and Standards are primarily prepared on the basis of
International regulations, codes and standards. Where International codes are not
applicable, other codes will be utilized according to PDG approval. In any area of
conflict, the order of precedence will be as follows (commencing with the highest):
1. National and Local Rules and Regulations
2. National Codes and Standards
3. Licensor Specifications and Standards
4. Engineering Standards and Specifications developed for the Project
5. International Codes and Standards
In general, API, ASME and ANSI Codes will apply to Piping and Equipment.
(See the document Aplicable Code and Standard FPM-02-GEN-GEN-028)
3.2 Language
Wording for document and drawing of design and engineering shall be in English
4. ABBREVIATION
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 5 / 67
S South
SW Southwest
W West
NW Nothwest
OBE Operating Basis Earthquake
SSE Safe Shutdown Earthquake
MCE Maximum Considered Earthquake
LHV Lower Heating Value
HHV Higher Heating Value
MMSCFD Million Standard Cubic Feet per Day
BOG Boil off Gas
5. Project Overview
5.1 Plant Location
Country : Indonesia
Town/City : Makassar
Geographic bearing of site : 050 06’ 49.5’’ South Latitude and 1190 25’ 11.4’’
East Longitude
Site altitude :2m
Location
Plant Location
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 6 / 67
1) Marine Facilities
2) LNG Storage Tank
3) Process System
a. LNG Pump
b. Ambient Air Vaporizer
c. Vapor Return Blower
d. BOG Compressor
e. Natural Gas Meter Station
4) Piping System
5) Electrical System
6) Control and Instrumentation
7) Utility System
8) Civil & Infrastructual System
9) Fire Protection
10) Natural Gas Pipeline
11) Etc.
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 7 / 67
6.2 Metocean
6.2.1 Temperature
Air Temperature
Temp. ◦C
Maximum recorded 35.6
Minimum recorded 19
Average temperature 27.73
Average max monthly 35.08
Average min monthly 20.68
6.2.2 Wind
6.2.2.1 Wind Velocity
Average velocity
- Rain (Nov-April) 28 km/hr
- Dry (May-Oct) 24 km/hr
Maximum velocity 51 m/sec (km/hr)
Basic wind speed for 44 m/sec(km/hr)
structure design(rata-rata maksimum)
% of
N NE E SE S SW W NW Calm
time
Jan’ 11 4% 7% 4% 4% 0 7% 7% 20% 72,82%
Feb’ 11 7% 0 10% 4% 0 0% 0 17% 14,98%
Mar ‘11 7% 7% 7% 7% 3% 4% 0 15% 15,62%
April ‘11 2% 4% 7% 7% 0 7% 7% 5% 12,55%
May ‘11 7% 0 1% 7% 21% 4% 6% 8% 15,9%
Jun ‘11 0 4% 4% 7% 0 7% 10% 7% 18,6%%
July ‘11 4% 7% 7% 5% 0 0 10% 7% 17.2%
Aug ‘11 0 12% 2% 5% 4% 8% 10% 0 18,57%
Sep ‘11 0 4% 4% 7% 5% 10% 9% 4% 18,57%
Oct ‘11 4% 4% 5% 7% 8% 11% 7% 4% 14,17%
Nov ‘11 7% 5% 6% 7% 4% 7% 8% 9% 15,06%
Dec ‘11 9% 7% 7% 7% 2% 4% 7% 10% 15,45%
Jan ‘12 4% 8% 5% 7% 4% 4% 4% 4% 17,81%
Feb ‘12 7% 7% 4% 7% 2% 10% 13% 15% 12,61%
Mar ‘12 2% 5% 6% 7% 2% 13% 17% 4% 12,15%
April ‘12 0% 6% 7% 7% 4% 10% 5% 4% 12,13%
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 8 / 67
6.2.4 Rainfall
Rainfall Value
Maximum recorded annual 92.8
Minimum recorded annual 0
Average annual 245.36
Maximum recorded in 24 hrs 242
Rainy season 6 month
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 9 / 67
Minimum 0
Maximum 100
Average 66.84
6.2.7 Tidal
6.2.7.1 Tidal type
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 10 / 67
solids 0
b Odour - No Organoleptik
Odour
c Turbidity 3,39 Turbidimetri
II. CHEMISTRY
a. Anorganic
Chemical
1 Ph - 8,19 Ph meter
2 Ca hardness as mg/L 714,29 Kompleksometri
CaCO3 CaCO3
3 Magnesium mg/L 3.250,00 Kompleksometri
hardness as CaCO3
CaCO3
4 Total Hardness mg/L 3.964,29 Kompleksometri
as CaCO3 CaCO3
5 Carbonates as mg/L 21,00 Tetrimetri
CaCO3 CaCO3
6 Phenolphthalein mg/L 21,00 Tetrimetri
alkalinity as CaCO3
CaCO3
7 Bicarbonate as mg/L 84,00 Tetrimetri
CaCO3 CaCO3
8 Total Alkalinity mg/L 115,50 Tetrimetri
CaCO3
9 Chloride as Cl mg/L CL- 11.400,0 Argentometri
10 Sulphates as mg/L SO4 1.118,55 Spektrofotometri
SO4
11 Dissolved iron mg/L Fe 0,040 Spektrofotometri
as Fe
12 Phosphate as P mg/L PO4- 0,000 Spektrofotometri
P
13 Dissolved silica mg/L SiO2 12,00 Spektrofotometri
as SiO2
14 Colloidal Silica mg/L SiO2 18,00 Spektrofotometri
15 Sodium as Na mg/L Na 3.700,00 Flame Photometri
16 Nitrates as N mg/L NO3- 0,00 Spektrofotometri
N
17 Magnesium as mg/L Mg 780,00 Kompleksometri
Mg
18 Temporary mg/L 84,00 Calculation
hardness as CaCO3
CaCO3
19 Permananet mg/L 3.880,29 Calculation
hardness as CaCO3
CaCO3
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 11 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 12 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 13 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 14 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 15 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 16 / 67
6.2.9 Current
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 17 / 67
Flow was measured for 25 hours in 3 layers (0.2 d; 0.6 d; 0.8 d), d is the
water depth.
spring tide
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 18 / 67
0.6 d = 0.155 m / s
0.8 d = 0.157 m / s
neap tide
6.3 Geotechnical
6.3.1 Offshore Deep boring
Drilling at sea conducted by 2 (two) points, that BHL and BHL-1-2.
Regarding the depth of the sea:
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 19 / 67
The depth of the bedrock around the drill point and BHL BHL-1-2 is
relatively the same that lies at a depth of -6.00 meters from ground level.
Topsoil in general there is a layer of sandy silt soil crusted scallops. The
condition of this layer is very loose (very loose) until the loose, N-SPT
prices on this layer ranges between 2-7 blows / feet.
Type of bottom soil layer (below -6.00 meters from ground level) is dense
soil layer berlanau sand (sand stone). N-SPT prices on this layer on
average> 50 blows / ft.
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 20 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 21 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 22 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 23 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 24 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 25 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 26 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 27 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 28 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 29 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 30 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 31 / 67
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 32 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 33 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 34 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 35 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 36 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 37 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 38 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 39 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 40 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 41 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 42 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 43 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 44 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 45 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 46 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 47 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 48 / 67
6.3.4 Sondir
Sondir investigation conducted only on land area alone. Sondir investigation is
done up to a depth 13.00 meters from local ground level.
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 49 / 67
6.4 Geophysics
6.4.1 Sub Bottom Profiling
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 50 / 67
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 51 / 67
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 52 / 67
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 53 / 67
6.4.4 Geo-electrical
Real resistivity values obtained from the measurement and the interpreted types of soil
real strata for the project site at IKI, Makassar
Titik Kedalaman Harga Type of Soil/Rock Strata
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 54 / 67
Resistivity
(m)
ρ (ohm-m)
0 – 1.00 94 Dry sand and gravel layer
G-1 1 – 2.50 141 Hard rock layer
>2.50 8 Wet silty clay layer
0 – 1.00 6.20 Wet silty clay layer
G-2 1.00 – 8.00 4.13 Wet silty clay layer
>8.00 41.00 Saturated sand layer
0 -1.00 3 Wet soft clay layer
G-3 1.00 – 4.30 60 Saturated sand layer
>4.30 0.62 Salty Clay layer
0 – 1.00 41 Saturated sand layer
1.00 –
G-4 5.13 Wet silty clay layer
10.00
>10.00 35 Saturated sand layer
0 – 1.00 42 Saturated sand layer
G-5 1 – 2.50 168 Hard rock layer
>2.50 25 Saturated sand layer
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 55 / 67
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 56 / 67
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 57 / 67
Molecular Weight
LNG Badak : 18,12
LNG Tangguh : 16,61
Density
LNG Badak : 458,8
LNG Tangguh : 432,6
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 58 / 67
Instrument Air
Minimun Normal Maximum Design
3
Flow Rate, m /h TBC TBC TBC TBC
Temperature, °C AMB AMB 65 65
Pressure, barg 4.50 7.50 10.5 10.5
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 59 / 67
Utility water:
Operating Pressure 3.50 barg (min) at grade and at furthest point
Supply Temperature Ambient
Potable Water:
Quality per Indonesian Standard
Supply Pressure 3.00 barg (min) at grade and at the farthest
point
Supply Temperature Ambient
8. CIVIL ENGINEERING
8.1 To be covered Civil Enginering Design Basis (FPM-02-CIV-GEN-001-A4)
9. INSTRUMENTATION
9.1 To be covered Instrumentationl Enginering Design Basis (FPM-02-INS-GEN-001-A4)
10. ELECTRICAL
10.1 Power Supply
The system characteristics shall be as follows:
10.1.1 In-plant generation: 6.6 kV 3 Ph. 50 Hz. In Plant Distribution Voltage: 380
V, 3 Ph, 50 Hz
10.1.2 An emergency power distribution shall be provided by PDG to supply
process critical loads and emergency lighting, as advised by the Unit
Consultant.
10.1.3 An uninterruptible power supply shall be provided by the Power Distribution
PDG
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 60 / 67
TABLE 1
BASIC UNIT OF MEASUREMENT
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 61 / 67
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 62 / 67
TABLE 2
COMPOUND UNITS OF MEASUREMENT, SPACE AND TIME
TABLE 3
COMPOUND UNITS OF MEASUREMENT, MECHANICS
Quantity Symbols Unit
Concentration : % mol Mole percent
(Number of moles per 100 moles of mixture)
FRONT END ENGINEERING DESIGN (FEED) OF
EASTERN INDONESIA LNG TRANSPORTATION
AND RECEIVING TERMINAL (PESANGGARAN &
MAKASSAR)
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 63 / 67
Weight percent
% wt
(Number of grams per 100 grams of mixture)
ppmv Parts per million by volume
ppmw Parts per million by weight
mg/ Nm3 Milligram per normal cubic meter
Corrosion Rate : mm/a Millimeter per annum
Density : kg/ m3 Kilogram per cubic meter
Head : kg2-m/ kgm Kilogram force-meter per kilogram mass
Linear Thermal
cm/m Centimeter per meter
Expansion
kg/s Kilogram per second
kg/h Kilogram per hour
Mass / Molar Flow
kgmol/h Kilogram moles per hour
Mt/a Million metric tons per annum
Moment : N-m Newton-meter
kg/ cm2a* Kilogram per square centimeter absolute
Pressure :
kg/ cm2g* Kilogram per square centimeter gauge
Differential Pressure Mbar* Millibar (1kg/cm2 = 13948.33 millibar)
: kg/cm2* Kilogram per square centimeter
Specification Bar/100m Bar per hundred meters
Pressure Drop : kg/ cm2-m Kilogram per square centimeter ~ meter
Rotational Speed : rpm* Revolution per minute
Stress : N/m2 Newton per square meter
mN/m Millinewton per meter
Surface Tension :
Dyne/cm* Dyne per centimeter
Viscosity :
CP* Centipoises
(Absolute)
Viscosity :
m2/s* Square meter per second
(Kinematic)
TABLE 4
COMPOUND UNITS OF MEASUREMENT, HEAT
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 64 / 67
Heat Transfer
kW/m2 - K Kilowatt per square meter - Kelvin differential
Coefficient :
TABLE 5
COMPOUND UNITS OF MEASUREMENT, HEAT
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 65 / 67
MW Megawatt
Hz Hertz (cycles per second)
AC Alternating current
DC Direct current
Luminance Ix Lux or lumens/m2
TABLE 6
STANDARD MAGNITUDE PREFIX AND MULTIPLIERS
Quantity Prefix Multiplier
T tera 1012
G giga 109
M mega 106
K kilo 103
c centi 10-2
m milli 10-3
µ micro 10-6
n nano 10-9
p pico 10-12
TABLE 7
SELECTED UNITS OF CONVERSION
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 66 / 67
Rev. No :G
FPM-02-GEN-GEN-002-A4 BASIC ENGINEERING DESIGN DATA
Page : 67 / 67
1. The American English spelling or units shall be used as shown (e.g., meter,
etc).
2. Generally, the SI (metric) system of units is to be used for the Project, with the
exceptions as noted by an asterisk*.
3. Pipeline and Piping diameters shall be specified in inches.
4. The British thermal unit (BTU) reflected in this document is the International
Table Btu. The Fifth International Conference on the Properties of Steam
(London, July 1956) defined the calorie (International Table) as 4.1868 J
(joule). Therefore, the exact conversion factor for the Btu (International Table)
is 1.055 055 852 62 kJ.
5. All gas volumetric flows shall be expressed in Nm 3 (normal conditions in the SI
system area 0°C, 760 mm Hg, dry basis), except those gas volumetric flows
appearing on overall conditions in the Imperial system area 60 °F (degree
Fahrenheit) and 14.696 psia, dry basis, which is equivalent to 15.560°C and
760 mm Hg, dry basis). The unit, standard cubic meter (m 3), shall not be used
for gas volumetric flows.
6. The prefix letter "M" is to refer only to "million" (i.e., "mega"), except in the case
of "MMBtu, MMSCF" and "MMSDFD", where adherence to gas industry
standard is advisable (i.e., "MMBTU" means million British thermal unit,
"MMSCF" means million standard cubic feet and "MMSCFD" means million
standard cubic feet per day).
7. In measurements affecting LNG heating value, standard gas conditions of the
Imperial system shall be used; standard gas conditions in the Imperial system
are 60 °F (degree Fahrenheit) and 14.696 psia, dry basis, which is equivalent
to 15.560 °C and 760 mm Hg, dry basis. The higher heating value (HHV)
means the gross heating value. The lower heating value (LHV) means the net
heating value.
8. Pressure should always be indicated in kg/cm2a or kg/cm2g, except for