Rate Analysis For Mortar of 1 Cu.m (C/S 1:3) : Cement/Sand Wet Volume Dry Volume
Rate Analysis For Mortar of 1 Cu.m (C/S 1:3) : Cement/Sand Wet Volume Dry Volume
Rate Analysis For Mortar of 1 Cu.m (C/S 1:3) : Cement/Sand Wet Volume Dry Volume
m (C/S =1:3)
Cement/Sand = 1:3 Note: You may change values in Green Cells
Wet Volume = 1 m3
Dry Volume = 1.42 m3
Volume of one
0.035 m3
cement bag =
Labour = 0.75 Day / m3
W/man = 0.07 Day / m3
∑ = 3278
Miscellenious
water charge @ 1.5 % 49.17
Sundries @ 7.5 % 245.84
Contractor Profit @ 10 % 357.29
∑ = 3445
Miscellenious
water charge @ 1.5 % 51.67
Sundries @ 7.5 % 258.35
Machinery 20 % 688.92
Contractor Profit @ 10 % 377.46
∑ = 7874
Miscellenious
water charge @ 1.5 % 118.12
Sundries @ 7.5 % 590.58
Contractor Profit @ 10 % 858.31
Grand Total (RS)= 9,441
Unit Rate (RS)= 9,441 Unit Rate For Material = RS:7246 and For Labour = RS:2195
Rate Analysis For 229 mm Thick Brick Wall (Brick Work = 1 cu.m)
∑ = 2548
Miscellenious
water charge @ 1.5 % 38.22
Sundries @ 7.5 % 191.09
Scaffolding @ 3.5 % 89.17
Contractor Profit @ 10 % 286.63