Principle No.3 Instruction: Work Instruction Availability, Understanding and Adherance Yes No Remarks
Principle No.3 Instruction: Work Instruction Availability, Understanding and Adherance Yes No Remarks
3
Instruction
General hint
-Please do the self-check on the shopfloor by means of the on-site available standards and documents
-In case you detect instable processes in the self-check of the element “Daily Management” or you know newly
implemented standards in the value stream you can check those preferably
-Evaluate if standards are established along the entire value stream
A.1. All the Work instructions are available on the shop floor (Check all pages)
A.2. Work instructions are easily accessible to the associates
A.3. Associates are able to understand and explain the work instruction
A.4. Special characteristics are marked in work instructions and are known to associates
A.5. Reaction plan for deviation is mentioned in work instruction and is known to asociates
D.1 The work sequences of all manual work places are defined w.r.t left hand/right hand
movement
D.2 The defined work sequence is adhered during working
hint
-Attention, this asks for the maturity of the processes. The process confirmation by the shopfloor
leader must be regularly performed for at least 3 weeks
E.1 The standard checks ( Eg.Pressure,Temperature etc) after manufacturing are defined in work
instructions and are followed
F.1 The work instructions contains all the controls defined in control plan
F.2 Actions came out of FMEA review/Line walk are incorporated in work instruction
F.3 8D actions are visualised in pictorial format for better understanding and to avoid recurrance of
complaints
F.4 Any changes in the work instructions are clearly communicated to all the associates
F.5 Work instructions are signed by the responsible authority
G.1 Negative impact on product quality is explained to associates if work instructions are not
followed
G.2 Principle no.3- Instruction is explained to the associates
0 0
Total
Operation:
Checked By:
General hint
-Please do the self-check on the shopfloor by means of the on-site available standards and documents
-In case you detect instable processes in the self-check of the element “Daily Management” or you know newly implemented standards in the value
stream you can check those preferably
-Evaluate if standards are established along the entire value stream
D1 Part movement (In- Process- Out) is clearly described in the work instruction and visualised
D2 Part movement is followed as per standard defined in work instruction
E1 The work sequences of all manual work places are defined w.r.t left hand/right hand movement
E2 The defined work sequence is adhered during working
F1 The standard checks ( Eg.Diameter, length,temperature etc) after manufacturing are defined in
work instructions and are followed
G1 The work instructions contains all the controls defined in control plan
G2 The work instruction are consisteltly updated as a output from control plan and FMEA
G3 8D actions are visualised in pictorial format for better understanding and to avoid recurrance of complaints
G4 Any changes in the work instructions are clearly communicated to all the associates
G5 Work instructions are signed by the responsible authority
H1 Negative impact on product quality is explained to associates if work instructions are not followed
Dept:
Checked by:
Date:
Principle no.8
Tooling
General hint
-Please do the self-check on the shopfloor by means of the on-site available standards and documents
-In case you detect instable processes in the self-check of the element “Daily Management” or you know newly implemented standards in the value
stream you can check those preferably
-Evaluate if standards are established along the entire value stream
Tool Storage (at store, at Shop) and tool issue Yes No Remarks
C1 Is there a defined location for storage of tools and accessories ? Is it prevented from mix-up (similar tools /grades) ?
C2 Is there a defined qty level for every tool (MOQ)? Is it defined considering usage, lead time for procurement, cost etc?
C3 Is there a triggering mechanism to ensure MOQ of tools and accessories?
C4 Is there a physical verification of tools on availability? Is it done on a fixed frequency?
C5 Is there a methodology to issue tools? Is it followed?
Dept:
Checked by:
Date:
Name & Entity
BPS + 14Q Essentials
Standardized Work-Make
G – General hint
-Please do the self-check on the shopfloor by means of the on-site available standards and documents
-In case you detected instable processes in the self-check of the element “Daily Management” or you know newly
implemented standards in the value stream you can check those preferably
-Evaluate if standards are established along the entire value stream
6.2 Additional appropriate documents for Standardized Work are available on site(e.g.,
MTS,StAB,line balancing chart with layout and operator movements)
6.3 Defined storage locations are visualized and identified on site( in / out & components)
6.4 All associates are qualified for the job according to the valid standard.
The qualification matrix / skill matrix is available on site
hint
-The qualification matrix shows which associate is qualified for what station. Check if
the current staff is working at stations for which they are qualified
6.5 The work sequences of all manual work places are confirmed regularly by the shop
floor leader for at least 3 months(evidence required)
hint
-Attention, this asks for the maturity of the processes. The process confirmation by the
shopfloor leader must be regularly performed for at least 3 months
6.6 The examiner of the BPS Essentials checks the work sequence: no deviation found
(LH,RH combination, use stab sheet as a reference point)
hint
-Check personally the work sequence described in the standard. Does the current staff
6.7 A systematic approach for a sustainable 5S implementation is existing and executed.
The first 4S(Sort out, Set in order,Shine and Standardize)are established. Red bin in locked
condition, FIFO followed, storage for leftover parts, quarantine area identified, guage
calibration, particle contamination, management of fallen down parts etc.
hint
-Check the documentation of the systematic approach for implementing the 5S and the
6.8 The 5S standards are visible and followed. No parts on floor
6.9 The process confirmation on 5S is carried out regularly (look into LPC sheet)
6.11 14Q LPC board exists and deviations are recorded and closelooped
0 0
Total