BUILDING SERVICES (BLD 60903)

Project 2: Application of Building Services


Tutor : Mr.Zafar
Chong Min 0333339

DN

PERIMETER DRAIN ON GROUND FLOOR


DS MH2 MH1 DS
DS DS RWDP RWDP
GT GT GT
DS RWDP

RWDP
O IWK

RWDP
ET

DS
MAIN SE DRAIN
WER LIN

MH3
N
MONSOO

RWDP
RWDP

RWDP

RWDP DS
RWDP
DS
DS GT
MH4
DS DS DS IC
SEPTIC TANK

RWDP DS

SEPTIC GULLY MANHOLE RAINWATER DRAIN


IC
TANK TRAP DOWNPIPE SUMP

ACCESS,ASSUMED SERVICE LINE SITE PLAN 1:500

STACK STACK
PIPE PVC VENT PIPE RISED AT 910MM PIPE
STACK
ABOVE THE ROOF LEVEL
PIPE
WITH WITHERING SLATE
AND VENT COWL
ROOF LEVEL
UPVC SOIL &
VENT PIPE
100MM DIAMETER

FIRST FLOOR LEVEL


KITCHEN MALE TOILET OKU FEMALE TOILET

FT FT FT FT FT FT FT FT
GROUND FLOOR LEVEL SP
GT
GT 75MM UPVC PIPE GT GT
GROUND LEVEL
SOAKWAY SEPTIC TANK
IC MH4
150MM UPVC PIPE
WITH CONCRETE
BEDDING
MH3 MH2 50MM UPVC WASTE PIPE MH1
WATER KITCHEN WASHROOM SHOWER STACK FLOOR GULLY MAN UPVC
PIT
CLOSET BASIN BASIN PIPE TRAP TRAP HOLE PIPE

SEWERAGE SCHEMETIC DIAGRAM NTS


COMMUNICATION SERVICE PIPE
PIPE
COLD
WATER 45L STEEL
TANK HOT WATER
19MM DIAMETER BOILER TANK
OVERFLOW PIPE

ROOF LEVEL
25MM DIAMETER
38MM DIAMETER
COPPER
SCOUR PIPE WITH
DISTRIBUTION
STOP COCK
PIPE
FIRST FLOOR LEVEL
25MM DIAMETER
KITCHEN UPVC
DISTRIBUTION
PIPE
M
FT FT FT FT FT FT FT
GROUND FLOOR LEVEL
GUTTER

MAIN SUPPLY
MALE TOILET OKU FEMALE TOILET POOL
BALANCING
FROM SYLAS TANK

M
PUMP SAND FILTER

COLD HOT
WATER KITCHEN WASHROOM SHOWER WATER WATER GATE STOPCOCK WATER WATER BOILER
CLOSET BASIN BASIN SUPPLY METER VALVE TANK TANK

HOT AND COLD WATER SUPPLY SCHEMETIC DIAGRAM NTS