Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

REVISION DATE CITY OF FOWLER STD.DWG.

W
WATER INDEX INDEX
NOTES:

* * *

REVISION DATE CITY OF FOWLER Std. Dwg.

SERVICE CONNECTION W-1


PLAN VIEW
NOTES:

REVISION DATE CITY OF FOWLER Std. Dwg.

FIRE HYDRANT
W-2
INSTALLATION & LOCATION
REVISION DATE CITY OF FOWLER Std. Dwg.

VALVE BOX & COVER DETAIL W-3


REVISION DATE CITY OF FOWLER Std. Dwg.

WATER MAIN BLOW-OFF ASSEMBLY


W-4
SPECIAL CONDITIONS ONLY
BENDS

TEES

CROSSES
NOTES:

REVISION DATE city of fowler Std. Dwg.

THRUST BLOCK DETAILS W-5


NOTES:

REVISION DATE CITY OF FOWLER Std. Dwg.

THRUST BLOCK BEARING AREA W-6


NOTES:

REVISION DATE CITY OF FOWLER Std. Dwg.

WELL DISCHARGE SAMPLE TAP W-7


STANDARD SPECIFICATIONS:

NOTES:

ECLIPSE NO. 88
SAMPLING STATION

REVISION DATE CITY OF FOWLER Std. Dwg.

3/4" WATER SAMPLE STATION W-8


SAMPLE STATION CONNECTION DETAIL

BACK OF SIDEWALK OPEN AREA

PLAN VIEW

REVISION DATE CITY OF FOWLER Std. Dwg.

3/4" WATER SAMPLE STATION W-8


EXAMPLE

SPECIFICATIONS

NOTES:

REVISION DATE CITY OF FOWLER Std. Dwg.

AIR GAP DETAIL W-9


SPECIFICATIONS

ATMOSPHERIC TYPE 2" AND SMALLER

REVISION DATE CITY OF FOWLER Std. Dwg.

VACUUM BREAKER ASSEMBLY W-10


INTERNAL PROTECTION ONLY
SPECIFICATIONS

PRESSURE TYPE 2" AND SMALLER


NOTES:

REVISION DATE CITY OF FOWLER Std. Dwg.

VACUUM BREAKER ASSEMBLY W-10


INTERNAL PROTECTION ONLY
REVISION DATE CITY OF FOWLER STD.DWG.

FIRE SYSTEM BACKFLOW PREVENTER W-11


ELEVATION

ISOMETRIC VIEW

REVISION DATE CITY OF FOWLER STD.DWG.

2" & SMALLER REDUCED PRESSURE W-12


BACKFLOW INSTALLATION SHT. 1 OF 2
REVISION DATE CITY OF FOWLER STD.DWG.

LARGER THAN 2" REDUCED PRESSURE W-12


BACKFLOW INSTALLATION SHT. 2 OF 2
IRRITROL MC - 4 PLUS-B IRRIGATION CONTROLLER

IRRIGATION CONTROLLER DETAIL

REVISION DATE CITY OF FOWLER STD.DWG.

LANDSCAPE IRRIGATION CONTROLLER W-13


NOTES:

REVISION DATE CITY OF FOWLER STD.DWG.

WATER MAIN CONNECTION W-14


PROCEDURE
Water Main Installation and Connection Procedure

REVISION DATE CITY OF FOWLER STD.DWG.

WATER MAIN CONNECTION W-14


PROCEDURE
Water Main Installation and Connection Procedure Continued

REVISION DATE CITY OF FOWLER STD.DWG.

WATER MAIN CONNECTION W-14


PROCEDURE
SECTION A-A

PLAN VIEW

REVISION DATE CITY OF FOWLER STD.DWG.

FIRE PROTECTION SYSTEM


W-15
SIAMESE PUMPER CONNECTION
PEDESTAL PLAN VIEW

REVISION DATE CITY OF FOWLER STD.DWG.

AIR RELEASE VALVE W-16

You might also like