Bill of Material (BOM) ME for Installation

Name of This Project : CIP MR1 Prepared by


Date Issue : 31-01-2019 Approve by
Document No. : Rev.
No. Description Specification Unit Q'ty
I. Persiapan
1 Gudang Sementara ls 1
2 Ass Built Drawing ls 1
3 Listrik dan Air ls 1
4 Keselamatan Kerja ls 1
5 Kebersihan ls 1
6 Alat Bantu dan Alat Angkat ls 1

II. Cable :
1 Power Pump NYY 4C x 4mm mtr 300
2 Instrument YSLY 3C x 0,75mm mtr 500
3 Instrument LICY 3C x 0,75mm mtr 100

IIi. Trays & Accessories


1 Cable Tray Wiremesh 150x50x3000 (WxHxL) SS 316L pcs 8
2 Cable Tray Wiremesh 50x50x3000 (WxHxL) SS 316L pcs 25
3 Joiner Tray Wiremesh SS 316L set 100
4 Besi Siku 40x40x6000mm SS 316L pcs 6
5 Bolt & Nut 8x30mm SS 316L set 50
6 Bolt & Nut 6x25mm SS 316L set 100
7 Cable Gland M36 pcs 3
8 Black Cable ties 3,6X250 mm pcs 1,000
9 Ferrules 0,75 mm pcs 200
10 Tubing Compressed Air 6mm mtr 800
11 Fitting Compressed Air 6mm pcs 20
12 Tubing Compressed Air 10mm mtr 10
13 Nepel-Fitting Compressed Air 3/8" x 10mm pcs 1
14 Vlok Ring-Bushing 1/2" x 3/8" SS 316L pcs 1
for Installation

1
Remaks

Rp 3,000,000
Rp 1,000,000
by owner
Rp 2,000,000
Rp 1,000,000
Rp 2,000,000

Rp 13,860,000 Rp 9,000,000
Rp 18,900,000 Rp 11,000,000
Rp 2,800,000 Rp 2,200,000

Rp 7,920,000 Rp 1,680,000
Rp 12,375,000 Rp 5,250,000
Rp 500,000 Rp 2,500,000
Rp 4,747,200 Rp 432,000
Rp 250,000 Rp 150,000
Rp 400,000 Rp 300,000
Rp 54,000 Rp 30,000
Rp 420,000 Rp 300,000
Rp 84,000 Rp 400,000
Rp 26,208,000 Rp 4,000,000
Rp 1,680,000 Rp 100,000
Rp 490,000 Rp 50,000 Main Compressed Air
Rp 84,000 Rp 5,000 Main Compressed Air
Rp 40,000 Rp 50,000 Main Compressed Air

Rp 90,812,200 Rp 46,447,000 Rp 137,259,200