BEMS POINT SCHEDULE & MCC LOAD DIAGRAM

Utilities Compound, Chiller Building, First Floor, MCC-01

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[X-1-AH2-01] [X-1-AH2-01]
Duct RA temp. detector [AHU] 1 A 2 SD 16 4 7 4 2.2kW Supply fan
Duct SA temp detector [AHU] 1 A 2 1
Duct FA temp detector [AHU] 1 A 2 DOL 16 4 4 2.5 1.1kW Extract fan
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3 X-1-MCC-01
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[X-1-AH2-02] [X-1-AH2-02]
Duct RA temp. detector [AHU] 1 A 2 SD 16 4 7 4 2.2kW Supply fan
Duct SA temp detector [AHU] 1 A 2 2
Duct FA temp detector [AHU] 1 A 2 DOL 16 4 4 2.5 1.1kW Extract fan
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[X-1-AH2-03] [X-1-AH2-03]
Duct RA temp. detector [AHU] 1 A 2 DOL 32 4 4 4 5.5kW Supply fan
Duct SA temp detector [AHU] 1 A 2 3
Duct FA temp detector [AHU] 1 A 2 DOL 32 4 4 4 4.0kW Extract fan
Mixing damper 1 [AHU] 1 A 3

Mixing damper 2 [AHU] 1 A 3


Mixing damper 3 [AHU] 1 A 3
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

RE6309/D1361 Rev 0/2003 15910/1 BEMS Point Schedule


BEMS POINT SCHEDULE & MCC LOAD DIAGRAM
Utilities Compound, Chiller Building, First Floor, MCC-01

Starting Gear Rating


Control Cable Cores

Starting Gear Type


Analouge or Digital

Load Item Power


Compartment #

Cable Cores
Nr of Points

Cable Type

Cable Size

Load Item
Location
Device

[X-1-AH2-04] [X-1-AH2-04]
Duct RA temp. detector [AHU] 1 A 2 DOL 32 4 4 4 5.5kW Supply fan
Duct SA temp detector [AHU] 1 A 2 4
Duct FA temp detector [AHU] 1 A 2 DOL 32 4 4 4 4.0kW Extract fan
Mixing damper 1 [AHU] 1 A 3
Mixing damper 2 [AHU] 1 A 3
Mixing damper 3 [AHU] 1 A 3
Supply fan isolator [AHU] 1 D 2
Extract fan isolator [AHU] 1 D 2
Motorised Valve [AHU] 1 A 3
Motorised Valve [AHU] 1 A 3
Supply fan starter [MCC] 3 D 5
Extract fan starter [MCC] 3 D 5
Pre Filter DP switch [AHU] 1 D 2
Main Filter DP switch [AHU] 1 D 2

[RO Control Room] [RO Control Room]


Room temp. detector Room 1 A 2 CV 20 4 12 6 7kW Elect Heater
Motorised damper 1 Field 1 A 3 5 battery
Current Valve MCC 1 A 3

1. A = Analogue; D = Digital; C = Communication


2. Starters: DOL = Direct On Line; SD = Star/Delta; AT = Auto Transformer; Inv = Inverter
3 Cable Type :1 = Xlpe/Swa/LSF, Type 2: Xlpe/Swa/Pvc, Type: 3 HEPR cables, Type 4 : PVC/PVC, Type 5: PVC singles
4. Numbers of Points and control cable cores are given for guidance. Tenderer to review against written specified requirements
and make due allowance for what is required