The document outlines the works to be considered by General Civil across four phases of a project. Phase I includes checking existing waste and fire water systems, proposing new underground piping, data collection, and report preparation. Phase II focuses on preparation of documents for tendering an EPCC contract. Phase III covers bid evaluation and revision. Phase IV involves reviewing contractor documents and resolving site issues.
The document outlines the works to be considered by General Civil across four phases of a project. Phase I includes checking existing waste and fire water systems, proposing new underground piping, data collection, and report preparation. Phase II focuses on preparation of documents for tendering an EPCC contract. Phase III covers bid evaluation and revision. Phase IV involves reviewing contractor documents and resolving site issues.
The document outlines the works to be considered by General Civil across four phases of a project. Phase I includes checking existing waste and fire water systems, proposing new underground piping, data collection, and report preparation. Phase II focuses on preparation of documents for tendering an EPCC contract. Phase III covers bid evaluation and revision. Phase IV involves reviewing contractor documents and resolving site issues.
1. Checking the routing of existing waste water system.
2. Site visit for new waste water plant. 3. Checking adequacy of fire water system. 4. Proposing & developing of new underground piping. 5. Line Sizing of new Under Ground Piping. 6. Data collection. 7. Hook up Study. 8. Development of Design Basis. 9. MTO for costing input. 10. Report preparation, submission and presentation to Client.
Works considered by General Civil for Phase-II
1. Preparation of feed document for EPCC tender.
2. Preparation of Scope Drawing & Scope of Work. 3. Preparation of Standards and Specifications. 4. Preparation of P&ID’s, Pfd’s. 5. Preparation of Layouts of under ground piping & Fire water system.
Works considered by General Civil for Phase-III
1. Site visit for EPC project bidders.
2. Technical evaluation of the offers. 3. Preparation of BQA. 4. Preparation of TBA. 5. Technical evaluation report. 6. Revising the bid document.
Works considered by General Civil for Phase-IV
1. Review of contractor’s documents.
2. Resolving site issues. 3. Site visits for resolving site queries.