COMPLETION REPORT FOR WORKS

Name of the engineer and

By whom last inspected


Date of subordinates by whom work
Difference Remarks and
was supervised
Amount of between explanation of
sanctioned Total Value of column 5,6 diferrence and
Sl No Name of work
estimate of work done (excess to be proposals as to
Commence- requisition shown in red Period of the disposal of
Completion Name
ment ink incumbency materials at site

1 2 3 4 5 6 7 8 9 10 14 15
Rs Ps Rs Ps Rs Ps From To

MUTHUKALLU ROAD-
KAKKUCHIRA- Kannan A
290/AEE/18-19-

MARADY GP

1000000

889914

110086
Eldhose Paul
1 20/02/19 11/06/19

Sreekala M
Chandran

Hereby certify that which the exceptions noted and explained above this work has been fully executed to the extent of the estimate in a substantial and
satisfactory manner as regards materials and workmanship and that excluding trifling deviations sanction in the monthly deviation statements and the those explained above
corresponds in all respects with the sanctioned Plan and Estimates and is suitable to the purposes for which is intended.

Station: Marady
Date: 27/06/19 Overseer Assistant Engineer Assistant Executive Engineer