Sample of P&ID Marked Up Drawing
Sample of P&ID Marked Up Drawing
29 27
26
21
25 24
28 20
Test Pack No.: 05
23 19
Test Pack Name: Fuel Gas
System
Test Pressure: 15 Barg
18 Test Envelope
15 Open
Closed
Primary Vent
Vent Path
Ensure Spectacle in
17 opened Position
Remove Plug 16
1 12
13
N2/He 2
Injection Point
14
4 5
6
11 Rotate Spec to
close position
10
7 Page 1 of 11
8 9
Remove Plug
31
OPP Point/Instr Test Pack No.: 05
Point 54 Test Pack Name: Fuel Gas
System
53 Test Pressure: 15 Barg
43 Test Envelope
51A
51 Open
32 41 Closed
Ensure Spectacle in
39 52 Primary Vent
opened Position
42 Vent Path
Ensure Spectacle in
opened Position
40
50
37 48
36
Ensure Spectacle in 47
opened Position 33 38 49
Rotate Spec to
close position
35 46
Rotate Spec to
close position 45
34
Install Spade
44
Page 2 of 11
Test Pack No.: 05
Test Pack Name: Fuel Gas
System
Test Pressure: 15 Barg
68 Test Envelope
Open
69 Closed
Primary Vent
59 Vent Path
60 65
56
55
66 67
57 58
64
Include
Include 63
61
62 Page 3 of 11
Test Pack No.: 05
Test Pack Name: Fuel Gas
System
Test Pressure: 15 Barg
Test Envelope
Open
Closed
Primary Vent
Vent Path
Install Spade
73
72
71
Page 4 of 11
70
Test Pack No.: 05
Test Pack Name: Fuel Gas
Install Spade System
Test Pressure: 15 Barg
Test Envelope
77 Open
Closed
Primary Vent
Vent Path
76
74 75
Page 5 of 11
Install Spade
81
80
Page 6 of 11
82 83 84 85
86 87 88 89
Page 7 of 11
90 91 92 93
Test Pack No.: 05
Test Pack Name: Fuel Gas
System
Test Pressure: 15 Barg
Test Envelope
Open
Closed
Primary Vent
Vent Path
Install Spade 94
Page 8 of 11
Test Pack No.: 05
Test Pack Name: Fuel Gas
System
Test Pressure: 15 Barg
Test Envelope
Open
Closed
Primary Vent
Vent Path
Page 9 of 11
98
95
99 96
Remove Plug
97
Page 10 of 11
Remove Plug
100
101
104
103 102
Page 11 of 11