Plan Ocs Project Id Target Date Production Schedule Sr. No.: 1 Raw Materials Procurement
Plan Ocs Project Id Target Date Production Schedule Sr. No.: 1 Raw Materials Procurement
Plan Ocs Project Id Target Date Production Schedule Sr. No.: 1 Raw Materials Procurement
OCS PROJECT ID
TARGET DATE
Production
Sr.
Production Stages
No.
11 y
ay
ay
ay
ay
ay
ay
ay
ay
a
ay
8- y
ay
ay
a
-M
-M
-M
-M
M
-
10
12
13
14
15
16
17
18
9-
6-
7-
1 RAW MATERIALS PROCUREMENT
a) Pipes (A 106 Gr. B)
b) Pipes (A 333 Gr. 6)
c) Sockolet (A 105N)
d) Sockolet (A 350 LF2 CL1)
e) End Cap
f) Red. TEE Fitting
g) WNRF Flanges
h) Eq. TEE Fitting
i) Elbow
j) Half Coupling
k) Fab. Bracket
l) Bolts
2 CUTTING/ DRILLING/ PREPARATION
a) 2" Pipe Cutting
b) 2" Pipe Drilling
c) 1/2" & 3/4" Pipe Cutting
d) 2" Pipe Bevel Preparation
e) End Cap Drilling
f) Siphon Tube Preparation
3 3/4" Pipe to TEE FITUP/ WELDING
M
ay
16
- M
ay
17
- M
ay
18
- M
ay
19
- M
ay
ACTUAL
20
- M
ay
21
- M
Production Schedule
ay
22
- M
ay
23
- M
ay
24
- M
ay
25
- M
ay
26
- M
ay
27
- M
ay
28
-M
ay
29
- M
ay
30
- M
ay
31
- M
ay