Plan Ocs Project Id Target Date Production Schedule Sr. No.: 1 Raw Materials Procurement

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

PLAN

OCS PROJECT ID
TARGET DATE

Production
Sr.
Production Stages
No.

11 y

ay

ay

ay

ay

ay

ay

ay
ay
a
ay

8- y
ay

ay
a

-M

-M

-M
-M
M

-
10

12

13

14

15

16

17

18
9-
6-

7-
1 RAW MATERIALS PROCUREMENT
a) Pipes (A 106 Gr. B)
b) Pipes (A 333 Gr. 6)
c) Sockolet (A 105N)
d) Sockolet (A 350 LF2 CL1)
e) End Cap
f) Red. TEE Fitting
g) WNRF Flanges
h) Eq. TEE Fitting
i) Elbow
j) Half Coupling
k) Fab. Bracket
l) Bolts
2 CUTTING/ DRILLING/ PREPARATION
a) 2" Pipe Cutting
b) 2" Pipe Drilling
c) 1/2" & 3/4" Pipe Cutting
d) 2" Pipe Bevel Preparation
e) End Cap Drilling
f) Siphon Tube Preparation
3 3/4" Pipe to TEE FITUP/ WELDING
M
ay
16
- M
ay
17
- M
ay
18
- M
ay
19
- M
ay
ACTUAL

20
- M
ay
21
- M
Production Schedule

ay
22
- M
ay
23
- M
ay
24
- M
ay
25
- M
ay
26
- M
ay
27
- M
ay
28
-M
ay
29
- M
ay
30
- M
ay
31
- M
ay

You might also like