FS Input Sheet For L1 and Book and Bill Projects
FS Input Sheet For L1 and Book and Bill Projects
Table of contents
1 General .........................................................................................................................2
2 BLUEPRINT REFERENCE.................................................................................................2
3 MASTER DATA REQUIRED..............................................................................................2
4 Functional Specification......................................................................................................2
4.1 Functional Development Description ...........................................................................2
4.2 Input Definition.........................................................................................................2
4.3 Output definition.......................................................................................................3
4.4 User interface ..........................................................................................................3
4.5 Device to be used for accessing the program................................................................3
4.6 Assumptions............................................................................................................4
4.7 Preconditions...........................................................................................................4
4.8 Authorisation ...........................................................................................................4
4.9 Transaction code definition ........................................................................................4
5 Open points in Business/User specification...............................................................................4
6 Appendix ........................................................................................................................4
Page 1 of 4
1 GENERAL
Apart from the L2 projects (for which Letter of Acceptance is received) the Finance team adds the
following project details in the Annual Planning:
2 BLUEPRINT REFERENCE
L1, Book & Bill projects are to be created as WBS elements in ERP
4 FUNCTIONAL SPECIFICATION
An input form should allow user to plan data related to L1 and book and bill project on the basis of
different dimension CO.Code/Period/Business Area/Region/Profit Center/WBS/Plant/Currency /Cost
Element. On saving, the data should be written back to the project planning model.
Page 2 of 4
6 Category Category represent different plan version X
Header details:
Company code
Category
Currency
Row Dimensions:
Project
WBS Element
Cost Element
Column Dimensions:
Periods
In the Input form, it is also possible to bring the description of the dimension member where necessary.
On saving, the data should be updated back to the ACDOCP.
Page 3 of 4
4.6 Assumptions
4.7 Preconditions
The L1 projects and the Book and Bill projects are to be created as WBS elements in ERP.
4.8 Authorisation
Authorizations will be provided to the SBU Finance team to update the plan values only
pertaining to the projects / profit centres for which they are responsible.
6 APPENDIX